An-Najah National University Faculaty Of Engineering Civil Department Construction PROJECT MANAGEMENT CONSTRUCTION PROJECT MANAGEMENT Prepared by: sameh.

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT BASICS
Advertisements

WBS-Construction of House (Example) WBS Dictionary
Introduction to Project Management Presented by: Derek DiGiacomo, SCTE Director, Information Systems Developed by: Derrick Nguyen, SCTE Manager, Information.
Construction Project management Prepared by: Muath Saadeh Saadeh Abu-Sa’da Kamel Beshara.
AN-NAJAH NATIONAL UNIVERSITY FUCULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT GRADUATION PROJECT CONSTRUCTION PROJECT MANAGEMENT (Value Engineering)
Key Concepts: Definition of a Project Characteristics of a Project
Civil engineering department Graduation project (part 1)
1.040/1.401 Project Management Spring 2007 Lecture 7 Dr. SangHyun Lee Department of Civil and Environmental Engineering Massachusetts Institute.
Wrap Rate Technique Chapter Introduction The Wrap Rate technique is a method used to allocate profit and other overhead costs to actual.
Step by step Microsoft office project What is a Project? A temporary endeavour undertaken to create a unique product or service [ Project Mangment.
Project Management Overview. Project driven or Non Project driven Organizational “drivers” Marketing Engineering Manufacturing.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Agenda  Project Management Overview  Selecting Projects  The Aggregate Project Plan.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Project Management “Introduction to Project Management: Tools, Techniques, and Practices” BA 320 Operations Management.
MALAYSIAN STANDARD METHODS OF MEASUREMENT FOR CIVIL ENGINEERING WORKS
Week3: The Project Management Process Groups 1 Prof. Ahmed Sameh Professor of Computer Sc. And Information Systems.
Project Management Education
Software Project Management Task Sequencing Activity Sequencing Concepts PERT charts Critical Path Analysis.
Abeer Bin Humaid. Project management is “the application of knowledge, skills, tools, and techniques to project activities in order to meet project requirements”
Advanced Project Management PM Processes and Framework
Edward B. Farkas, Managing Director, Project Management Practice
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
Work breakdown structure
Project Management. The Project Management Institute
1 Project Planning Faculty of Applied Engineering and Urban Planning Civil Engineering Department Week 4 2 nd Semester 2008/2009 UP Copyrights 2008 Construction.
PLANNING AND SCHEDULING
An-Najah National University Engineering Faculty Civil Engineering Department Submitted in partial fulfillment of construction project management for the.
PM Standards- PMBoK Prof.Bistra Boeva UNSS. PMBok is known as a system of knowledge within a profession of Project Management. PMboK integrates good practice.
CE Estimation & Quantity Surveying Prepared by Prof. S.L. DAVID ANANDARAJ.
Specification & Quantities Estimating
Construction Project Management “Tubas Governmental Hospital” Prepared by: Asma’a Abu-Aqel Naheel Al-Naser Presented to: Ir: Barraq Jumaa.
Work Breakdown Structure Use and Demo
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
Project Management An Introduction to Project Management Supervisor :eng. Baraq Juma’a Prepared by: Khaled Mohammad Sawalha Suha Tarek Awwad
C ONSTRUCTION PROJECT MANAGEMENT Submitted in partial fulfillment of construction project management for the bachelor degree in civil engineering Fuad.
Construction Project Management Prepared By: Omar Al-Taher Supervised By: Dr Baraq Jum’aa.
July Project Management What is meant by a “Project” ?? Difference between planning and operation stage. Defining the “Project management”. How.
P ROJECT M ANAGEMENT. Case study Assumptions Methodology Discussion.
What is the “Project”? A temporary endeavor undertaken to create a unique product or service.
7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Work Plan Development Section A 1.
Engineering Economics Lecture 18 Project Management 6 January 2010.
Project Management Basics Every Administrative Professional Should Know.
PRO 3020 Pam Soderholm Welcome To Class!. What Question(s) Do We Answer When Defining Scope? What? What Else?
INTRODUCTION Mehmet Sait Andaç Web: Office: 431.
Basic Project Management Process Basic Project Management Process Larry Creel July 11, 2003.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
Measuring Palestinian Labors Productivity
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
{Beir Ziet Secondary Boys School }
Design of shallow foundations for optical and nursing faculty
Construction Project Management
Construction Project Management
“Core project management knowledge areas & tools”
An-Najah National University
An-Najah National University
Construction Project Management
What is the best method for constructing schools in Palestine ?
The value of a project-oriented approach to IT and how we do it in IBM
Construction Project Management
Lecture # 3 Software Development Project Management
An - Najah national university Civil engineering department
Civil Engineering Department
Construction Project Management
Introduction to Project Management
An-Najah National University Faculty Of Engineering civil Department
Muskat Secondary School Project
Presentation transcript:

An-Najah National University Faculaty Of Engineering Civil Department Construction PROJECT MANAGEMENT CONSTRUCTION PROJECT MANAGEMENT Prepared by: sameh raee deiaa shaqor yosif hamarshe ameed zawyani Supervisor : Ins. luay dwekat

Optical and nursing college

Graduating project consist two parts : The first part include preparing a theoretical research. The second part includes the application of the principle in construction project management.

What is a Project? A project is a temporary endeavor undertaken to accomplish a unique product or service with a defined start and end point and specific objectives.

What Project management Project management is the application of knowledge, skills, tools, and techniques applied to project activities in order to meet or exceed stakeholder needs and expectations from a project.

Project Life Cycles :

Scope of the project Time Cost Quality

Description of the project : optical and nursing college is one of the najah university colleges in Nablus,This college consists of seven stories and roof of total area (7021 m2). It was designed consolidated consultant. and implemented by Al-batye office

method of construction: Finishing all sub structure works and immediately begins the super structure works. The super structure work consists of seven stories and roof that are; 3rd Basement,2nd basement,1st basement, ground, first, second and third floors and roof. While the construction work for one story finished then begin to finishing work for that story.

Assumptions Working days are all days except Fridays. The electrical and mechanical work done by the same contractor. All money paid by U.S Dollar ($) and the fixed value of Dollar according to local coin was (1$=3.6 NIS).

methodology Step one: make work breakdown structure Step two: activity listing and coding Step three: relationship between activities Step four: duration for activities and resource allocation Step five: cost estimation and quantity surveying

Work Breakdown Structure (WBS) The project was divided into four levels which are: 1 st level: optical and nursing college 2 nd level: earthwork, Civil, finishing, Mechanical and Electrical. 3 rd level: 3 rd basement, 2 nd basement, 1st basement …………. 4 th level: Activities.

Work Breakdown Structure (WBS)

Activities List

relationship between activities and Resources The relationships between activities divided to: 1. Finish to start relationship (F.S). 2. Start to Start relationship (S.S). 3. Start to finish relationship (S.F). 4. Finish to finish relationship (F.F).

Example of Relationship using primavera

Duration and resource allocation Duration = quantity of activity \ productivity For example block Partition work: Labor productivity equal twelve meter square for mason and helper per day. Quantity of activity equal for example 1200 m 2. If use one mason and helper the duration equal 1200 /12 =100 day If use five mason and helper the duration equal 1200 /60 =20 day

quantity surveying and cost estimation Fgdfyuiiokl;lkjhkjh

example

Results The following tables shows details about cost analysis:

Results

The following tables shows details about duration analysis for the project:

Results

The following tables show details about some items and rates:

S-curve

Resource profile labor