D EPARTMENT OF E NERGY C ONDITION A SSESSMENT I NFORMATION S YSTEM 2014 FIMS Annual Training Adam Pugh March 2014.

Slides:



Advertisements
Similar presentations
Presentation for: Annual FIMS Comprehensive Training Y-12 New Hope Center Oak Ridge, TN Prepared by: Gayle Smith Facilities Information Management System.
Advertisements

Briefing to the Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL) Joseph McBrearty, Deputy Director for Field Operations.
Office of Nuclear Energy 1May 20, 2013 Property Management Workshop Office of Nuclear Energy Program Perspective Delivering Nuclear Solutions for America's.
Space Bank & Freeze the Footprint May 22, 2013 Phil Dalby, PE, LEED AP, CFM Office of Acquisition and Project Management Property Management Virtual Workshop.
Ivan Graff Office of Acquisition and Project Management Oak Ridge, TN March 27, 2014 Applying the Memorandum on Data Related to Operations and Maintenance.
Office of Management, Office of Engineering and Construction Management DATA ELEMENT UPDATE Gary R. Horn Facilities Engineer, LEED AP Office of Engineering.
Basic Building Condition Assessment – Part 1 Prepared for Delivery through AGLEARN.
June 16, 2011FIMS / Real Estate Workshop nd Annual FIMS / Real Estate Workshop.
Bridges & Culverts Usage Codes and Validation Annual FIMS Comprehensive Training March 27, 2014.
FIMS/Real Estate Workshop June 16, 2011 The IFI Crosscut and You How FIMS Data Supports the Budget Process Cindy Hunt, PE, LEED AP, CCE, CFM Office of.
Acknowledges the C mplexity of the C mplex Seeks Clarity for FIMS Strives for Functionality for All The FIMS Advisory Committee.
I-Web Documentation Part VI – Work Items FACILITY CONDITION SURVEY TEAM Steve Oravetz PE, R1 (Team Leader) Bruce Crockett, R1 Randy Warbington PE, R8 Jim.
Office of Acquisition and Property Management Completing an Effective Project Data Sheet (PDS)
CEOS ECV Inventory Database Survey and Integration with the EO Handbook Shelley Stover CEOS Systems Engineering Office (SEO) Working Group on Climate Meeting.
Work Breakdown Structure WBS
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
Office of Science U.S. Department of Energy Management of Unneeded Materials and Chemicals (UMC) Arnold Edelman Office of Science May 2006.
FIMS Data Validation Improvements And Lessons Learned Phil Dalby, PE, LEED AP, CFM Office of Acquisition and Project Management Property Management Virtual.
1 NMMSS Orientation Brian Horn Nuclear Regulatory Commission Peter Dessaules Department of Energy.
1 FIMS Population Queries FIMS/Real Estate Workshop Memphis, TN June 3, 2009 Gayle Smith Mike Kohut Energy Enterprise Solutions.
ANNUAL FIMS COMPREHENSIVE TRAINING Y- 12 NEW HOPE CENTER OAK RIDGE, TN MARCH 25, 2014 GAYLE SMITH Accomplishing FRPP Reporting and Improving Data Quality.
1 NMMSS Orientation Brian Horn Nuclear Regulatory Commission Peter Dessaules Department of Energy.
How to Use the New FIMS AAIM Module Annual FIMS Comprehensive Training Y-12 New Hope Center Oak Ridge, TN March 25, 2014 Mark Gordy Gayle Smith.
Paper # LOS ANGELES COUNTY PRIORITIZATION OF SEWER REHABILITATION PROJECTS Fernando Villaluna, P.E. 1.
Office of Acquisition and Property Management Proposed Changes to Attachment G FY 2011 – FY 2015 Five Year Plan.
1 Green Computing DOE Electronics Stewardship CIO Cyber Security Conference May 2, 2007 Jeff Eagan Office of Health, Safety and Security Office of Nuclear.
National Laboratory Operations Board Infrastructure Assessment Subgroup Real Property Background Carmelo Melendez.
Facilities Information Management System (FIMS) Data Validation Inbrief program Facilities site name date.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
Facilities Information Management System (FIMS) Data Validation Outbrief [Program] [Site] date.
EM Budget--- Past/Present/Future Mark W. Frei U.S. Department of Energy October 14, 2005.
LLW/MLLW National Disposition Strategy Gary R. Peterson, P.E. U.S. Dept. of Energy.
Laboratory Operations Board Enhancements Mark Gordy & Gayle Smith March 25, 2014 Annual FIMS Comprehensive Training Y-12 New Hope Center Oak Ridge, TN.
Using an Environmental Management System for Managing DOE’s Legacy DOE Order Workshop 26 February, 2003.
2014 FIMS Annual Training Oak Ridge, TN March , 2014 Presented by: Michael Kohut, DOE Headquarters (GCI)
Ivan Graff, PE, CFM, CCP, LEED AP Office of Management Office of Asset Management.
Planning for FY08: Managing the Transition of the LM Organization December 2004.
Office of Science (SC) Overview John Yates Office of Operations Program Management, SC-33 Office of Science Briefing for DOE FIMS Training at ANL – May.
OFFICE OF SECURE TRANSPORTATION
Proposed FIMS Data Elements for Removal FIMS/Real Estate Workshop Palm Springs, CA June 2-6, 2008 Mark Gordy Energy Enterprise Solutions.
FRPP Data Issues FIMS/Real Estate Workshop Palm Springs, CA June 2-6, 2008 Mark Gordy & Gayle Smith Energy Enterprise Solutions.
Annual FIMS Comprehensive Training Argonne National Laboratory May 6, 2015.
STATE OF OUR FACILITIES REPORT bellwether of the asset management plan evolution of the three year rolling timeline Ivan Graff Office of Asset Management.
1 Department of Energy Excess Screening and Disposition Tracking Phil Dalby, PE, LEED AP Office of Engineering and Construction Management Facilities and.
FIMS/Real Estate Workshop Palm Springs, CA June 2-6, 2008 DOE Oak Ridge Office Rebecca Whitehead.
1 FIMS Data Validation Improvements And Lessons Learned Phil Dalby, PE, LEED AP Office of Engineering and Construction Management Facilities and Infrastructure.
1 FIMS Data Validations And Lessons Learned Phil Dalby, P.E. Office of Engineering and Construction Management Facilities and Infrastructure Team FIMS.
1 Department of Energy Excess Screening and Disposition Tracking Phil Dalby, P.E. Office of Engineering and Construction Management Facilities and Infrastructure.
1 DOE Excess Elimination an Dispositions Phil Dalby, PE, LEED AP, CFM Office of Acquisition and Project Management Property Management Virtual Workshop.
FIMS Workshop June 2-6, 2008 Jolie Macier. A subcommittee of individuals comprised of Field Office users, including DOE contractor personnel, that recommend.
Mark Gordy, PMP Energy Enterprise Solutions, LLC 2013 Property Management Workshop May 22, 2013.
NNSA Service Center Albuquerque, NM Field Office Status Report June 2008.
Presentation for: 2009 FIMS/Real Estate Workshop Prepared by: Mark Gordy, Headquarters (EES) Facilities Information Management System Data Quality and.
Mark Gordy Annual FIMS Comprehensive Training Argonne National Laboratory May 6, 2015.
Freeze the Footprint Update March 25, 2014 Presented for Monja Vadnais Facilities & Infrastructure Division (MA-652) Office of Acquisition and Project.
I need to see you back here in 5 years. Will do Doctor.
1 Chicago Office. 2 FACILITIES INFORMATION MANAGEMENT SYSTEM (FIMS) & REAL ESTATE WORKSHOP FIMS POPULATION QUERY DEMONSTRATION June 2 – 6, 2008 Palm Springs,
STREAMLINING STORM WATER PERMIT IMPLEMENTATION THROUGH USE OF AN INFORMATION MANAGEMENT SYSTEM April 8, 2004 Presented by John W. Hart 30 th Environmental.
FIMS Data Quality FIMS Annual Training May 10-12, 2016 Prepared by: Mark Gordy and Gayle Smith.
FIMS FY16 Year-End Schedule FIMS Annual Training May 10-12, 2016 PREPARED BY: GAYLE SMITH.
1 of 32 Performance Measures and the State of Our Facilities Eric Haukdal MA-50 Office of Asset Management.
Prepared for the Facility Information Management & Real Estate Annual Comprehensive Training May , 2016 Orlando, FL Real Property Efficiency Plan.
Prepared by: Adam Pugh May 10-12, 2016 FIMS/RE Annual Training.
CAIS Estimating Module Condition Assessment Information System Prepared by Adam Pugh and Mark Gordy FIMS Annual Training May 10-12, 2016.
Low-Level Radioactive Waste (LLW) Disposition at the
Information Systems Today: Managing in the Digital World
Overview of Waste Disposition Activities Fall 2017 LLW Forum Meeting
Federal Real Property Asset Management Initiative
Final Design Authorization
U.S. Department of Energy Perspectives on Waste Classification
Presentation transcript:

D EPARTMENT OF E NERGY C ONDITION A SSESSMENT I NFORMATION S YSTEM 2014 FIMS Annual Training Adam Pugh March 2014

D ISCUSSION P OINTS CAIS 101 What is CAIS? Sites Currently Using CAIS Link to FIMS Work Breakdown Structure Functionality Screenshots Reports CAIS 2.0 Goals for CAIS 2.0 Back to the Basics Prospective User Interface Change Future Capabilities CostWorks Sustainment Modeling CAIS Support

W HAT IS CAIS? The Condition Assessment Information System (CAIS) is DOE’s in-house inventory system for recording the current physical condition of real property assets. Costs are classified by building elements in the UNIFORMAT II formatting system. It is a deficiency-based (repair needs) unit cost estimating system. It uses RSMean data. It breaks down the repair needs cost at the asset, system, and/or component level. CAIS meets all requirements describe in DOE Order 430.3b, Real Property Asset Management.

S ITES C URRENTLY U SING CAIS EE, National Renewable Energy Lab FE, National Engineering Technology Lab EM, Depleted Uranium Hexafluoride(DUF6) Paducah EM, Depleted Uranium Hexafluoride(DUF6) Portsmouth EM, River Protection EM, Paducah Gaseous EM, Portsmouth Gaseous EM, Richland Operations Office EM, Savannah River Site EM, Waste Isolation Pilot Plant EM, Grand Junction NNSA, Nevada Test Site (Nevada National Security Site) NNSA, Livermore National Lab NNSA, Los Alamos National Lab NNSA, Office of Secure Transportation NNSA, Pantex Plant NNSA, Y-12 National Security Complex NE & EM, Idaho National Lab SC, SLAC National Accelerator Lab

CAIS L INK TO FIMS Condition Assessment Survey (CAS) CAISFIMS Federal Real Property Profile (FRPP) DOE RS Means Models CostWorks

CAIS F UNCTIONALITY The CAIS database is built off inspection units, which means the user only enters data when a deficiency is identified. Deficiency can be costed out by repair cost or a replacement cost. Each cost can be developed by a percentage or by a total replacement for the inspected component. CAIS has standard and ad hoc query reports.

CAIS W ORK B REAKDOWN S TRUCTURE SITE Example: SRS AREA Example: A ASSET Example: Warehouse VOLUME Example: Foundations WBS (Example: Footing Type: Strip, Grade Beam, etc. INSPECTION UNIT COMPONENT Example: Spread Footing / SQFT COMPONENT TYPE Example: Spread Footing 3SF X 12” Deep DEFICIENCY CAIS is linked to FIMS in real time

CAIS S CREENSHOTS A SSET L IST

CAIS S CREENSHOTS I NSPECTION L IST

CAIS S CREENSHOTS I NSPECTION U NIT S CREEN

CAIS S CREENSHOTS D EFICIENCY O PTIONS FOR AN I NSPECTION

CAIS R EPORTS D EFICIENCY R EPORTS

CAIS R EPORTS Deferred Maintenance by System Portfolio (Building, Site, Program)

Goal 1: Consistent data input in CAIS. Goal 2: Eliminate unwarranted data elements. Goal 3: Improve the user experience. Goal 4: Provide capabilities beneficial to Headquarters Program Offices. Goal 5: Increase the number of DOE sites that use CAIS.

B ACK TO B ASICS  Volume  WBS  Component  Type  Description  Inspector ID  Discipline  Location  Quantity  Condition  Urgency  Inspection Date  Deferred (YES/NO)  Rehab and Improvement Costs (RIC) Flag (YES/NO)  Official Deficiency Cost  Estimated Deficiency Cost  Replacement Deficiency Cost  Repair Deficiency Cost What are the minimum inputs needed to get a deficiency cost?

P ROSPECTIVE U SER I NTERFACE C HANGE  Deficiency Cost  Deferred Maintenance Have the capability to turn ON/OFF user fields such as the ones below  Construct Maintenance Project with Deficiency Cost  Construct RPV Models  Standard Reports  Ad-Hoc Reports

Integrate sustainment maintenance modeling currently in DOE CostWorks into CAIS. Store modified RPV DOE models in CAIS to eliminate sites reproducing the models each year. Link the deficiency (repair need) element in CAIS to FIMS. Enhance current project capabilities within CAIS. F UTURE C APABILITIES

C OST W ORKS S USTAINMENT M ODELING

CAIS S UPPORT CAIS Website: DOE RS Means Models: RS Means CostWorks: CAS Documentation: Monthly Teleconference Annual Meeting: October 2014, Nevada Site Office CostWorks Training: Annual and Upon Request CAIS and CAS Training: 29 April 2014 – 1 May 2014, Nevada Site Office:

Q UESTIONS Adam Pugh Department of Energy Office of Acquisition and Project Management Phone: (202)