The Pavilion Pre-Submittal Conference April 1, 2010.

Slides:



Advertisements
Similar presentations
PRESENTATION FOR CWEA TRAINING Keys to Successful Pipeline/Infrastructure Projects Pipeline Flow Diversion Presented by: Tom Epperson, PE, Tetra Tech.
Advertisements

SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Addition to Current Radiation Facility Program Some features are under development and will be subject to review by competent authorities (FDA, Notified.
Wiencek + Associates Architects + Planners Historic Dupont Circle Wiencek + Associates Architects + Planners, DC LLP 1814 N St., NW Washington, DC
Scheduling.
DEPARTMENT OF DEVELOPMENT SERVICES BUILDING DIVISION Ronald L. Lynn, Director/Building Official Gregory J. Franklin, Assistant Director Neil Burning, Manager.
SANITARY DESIGN PRINCIPLES FOR FACILITIES. ZONES OF CONTROL.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Building Expansion Project Update ECCC 4.9 Growth Strategy We will continue to grow as a “one site multi congregations & services” church.
The Royal College of Radiologists Giles Maskell President.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
CAUTI Prevention.
1855 Bloor Street Information Session
Recycle North Building Renovation and Design Senior Capstone Design Project Civil and Environmental Engineering Scott Hamshaw Presenting.
Picture Lake Geneva, Switzerland Surrounded by the Alps 20°C mean temperature in summer Annual snow fall – 30in Site Context.
Mission Bay Operations Planning Update for Clinical Affairs Committee June 22, 2011.
Jay Hamm, RN, FACHE, COO/Acute Care Executive Steve Shelton, MD, Medical Director EM Eric Brown, MD, Physician Executive.
Health System Response to Pandemic Influenza: A Clinician's Perspective Mary M. Klote, MD Walter Reed Army Medical Center.
4900 S ROUTE 31 CRYSTAL LAKE 1. AERIAL 2 PROPERTY HISTORY 3 Constructed by Sherman Hospital in 1978 Now Owned by Advocate Group.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Strength Training and Conditioning Facilities Day 27 Reference: Earle and Baechle - Chapter 24.
Humidity in Anesthetizing Locations Where Mechanical Systems and Compliance Collide Daniel Swanson | Project Director Healthcare | McKinstry Currently.
Component 2: The Culture of Health Care Unit 3: Health Care Settings— The Places Where Care Is Delivered Lecture 3 This material was developed by Oregon.
1 Long-term Care Vermont’s Approach Individual Supports Unit Division of Disability and Aging Services Department of Disabilities, Aging & Independent.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
. Traffic Flow Management System Benefits Flexibility for Future Growth: TFMS provides a modern software architecture to meet future growth and support.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Hospital Facility Managers Association of Delaware Valley.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
Alkek Expansion Pre-Submittal Conference October 5, 2006.
Planning for Successful Simulation Simulation Planning Guide - A Guided Discussion.
Hospital Operational Standards Jennie Hall, Chief Nurse Dr Ros Given-Wilson, Medical Director Martin Wilson, Director of Delivery and Improvement.
Design Question 6 What will I do to establish and maintain classroom rules and procedures? Page 199.
  Provide a library link at an existing campus crossroads and a new face for the combined Deering Library/ University Library complex  Strengthen the.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
AIA Guidelines for Design and Construction of Hospital and Healthcare Facilities Presented By: Michael A. Rogers, PE
Course of Study 5. Maintenance Management Assessing Maintenance Needs
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
Sydney (02) Melbourne (03) Brisbane (07) Carlo Biaro Capital Insight Conference 2013 – Tools and.
1 Symbols Signage Educational Series Part 2: Destination Criteria and Naming.
AHS+Associates Final Project Name Here Final Project Architect – Your Name Put your favorite drawing, sketch, photo, etc. of your project here.
Management Briefing FY15. Environmental Management Service (EMS) provides a variety of support throughout the Medical Center:  Interior Design:  A professional.
1 SDQD Study Substructure, Science Center, and Pool Building Demolition and Quadrangle Development SDQD.
Copyright © 2016 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
Sheikh Zayed Tower.
2 TEXAS CHILDREN’S HOSPITAL. TCH Conversion $6.6M – Initial Construction Budget (10% Contingency Included) $6.6M – Actual Construction Budget $13 M –
SDQD Study Substructure, Science Center, and Pool Building Demolition and Quadrangle Development SDQD.
BizForceOne by MegaSolutionCenter (MSC), USA BIZFORCEONE OPERATING SYSTEM BEST FIT IMPLEMENTATION.
Planning Facilities for Flexibility. Planning Facilities for Flexibility l 2 What is… FLEXIBILITY The Ability to Expand or Adapt.
The answer to all your cleaning needs. Versatex is an established cleaning company since 2002 with active participation from our director F. Clarke. We.
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
Overview of ASME P Planning for Load Handling Activities
Alpine County Government Center Board of Supervisors Presentation June 26, 2013.
1 Update on Off-Campus Development in South County: Update to FPP CAC – August 25, 2015 Siteman Cancer Center Expansion Phase II Development.
White Pigeon Community Schools
Four Winds Condominium Association August 2, 2017
Water Works.
Layout Strategies UNESCO-UNITWIN UUOOI-2015 Prepared by
Healthcare Systems Engineering at MD Anderson Cancer Center.
Penn Medicine Chester County Hospital
“Driving Down Construction and Operational Costs: How a GPO Does It”
Facilities Report to the Buffalo State College Senate May 6, 2016
Prince Frederic Hall Tech One Lauren Kandt PSU AE Construction Sowers
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Enron Energy Services Energy Management Outsourcing Overview
Floor Plan A horizontal section view of a structure taken about 4’ from floor level, It shows all exterior and interior walls, doors, windows, patios,
AHCL Surgery/Maternity/ICU Extension Activities / Highlights
DBIA Manual of Practice
Recent Bond Accomplishments
Mike Hogan - Biography Biography / Highlights
Presentation transcript:

The Pavilion Pre-Submittal Conference April 1, 2010

M. D. Anderson Team Leaders Jim Waters, Project Director, Shell and Core Janet Sisolak, Project Director, Interior Build-out Pam Redden, Project Director, Clinical Operations Dan Butterwick, Chief Architect Greg Hudgins, Project Manager Rich Fitzgerald, Design Facilitator Eve Avivi, Interior Planner Mary Mueller, Sourcing & Contract Management

Project Organization

Project Objectives Enhance the front door of M.D. Anderson Cancer Center Add horizontal expansion space to levels 3, 5 and 7 to support Diagnostic Imaging and Perioperative Enterprise, respectively. Provide expansion space for sterile processing and Perioperative clean supply (basement)

Project Objectives (continued) Free up space on the Alkek floor plate to provide more operating rooms and diagnostic imaging suites Ensure new operating rooms are programmed to optimum size based on procedures to be performed and equipment needed

Project Goals Minimize closure of the front door; stage project to facilitate early opening of drive and new lobby Maintain continuous connectivity between the Alkek Hospital and Lutheran Pavilion on all floors Provide future planning flexibility –Long term strategy for Lutheran Pavilion replacement –Programmatic changes –Future bridge to TMC Garage 2

Site Overview

Design Criteria Package

Basement Level Expansion Block Plan

Level 1 & 2 Expansion Block Plan

Level 3 Diagnostic Imaging Expansion Block Plan Level 3 Diagnostic Imaging Expansion Block Plan

Level 4 Interstitial Expansion Block Plan

Level 5 Existing Alkek POE Level 5 Perioperative Enterprise Expansion Block Plan

Level 6 Interstitial Expansion Block Plan Existing Alkek POE Interstitial

Level 7 Perioperative Enterprise Expansion Block Plan Level 7 Existing Alkek I.C.U.

Existing Alkek Mechanical Level 8 P.O.E. Interstitial/ Mechanical Expansion Block Plan

Key Project Considerations Construction Impacts Design Impacts Operational Concerns Downstream Impacts

Construction Impacts Site Logistics/Staging Construction Access Construction Supply - Bates and Bertner Crane Placement & Removal Vibration/Noise Infection Control - dust Safety-dropped loads

Design Impacts Optimizing the site and creating the right front door image –Confirm both the interior and exterior aesthetic design objectives –Confirm impact to both budget and schedule to optimizing the site MEP Issues –Confirm whether capacity in main building will support the addition. Structural Issues –Rotunda bridges can stand alone, to allow Rotunda to be removed –Design to support future bridge to TMC Garage 2

Operational Concerns Keeping the Rotunda drive closed for extended duration Further closure of Rotunda to pedestrian traffic Visitors - Garage 2 Traffic flow (pedestrian & vehicular) along Bates and Bertner Valet Operations – currently operating out of Clark Clinic Patient Discharges – Currently using Emergency Center PT/OT – Continued closure of gardens used for gait training and pet therapy Flooding Exposure

Questions?