SUBSAFE Approved for Public Release

Slides:



Advertisements
Similar presentations
AS9102 First Article Inspection Report
Advertisements

FASTENER TIPS: TESTING, TEST REPORTS, SUPPLIER OVERSIGHT
MAJOR REPAIRS AND ALTERATIONS
Transition from Q1- 8th to Q1- 9th edition
1 HYDROSTATIC TESTING Approved for Public Release.
Final/Shipout Inspection Approved for Public Release.
Copy Exact Training For SMC Suppliers
Global Supplier Quality Manual PPAP Requirements
PPAP Requirements Training
EQUIPMENT VALIDATION.
© 2003 Swagelok Company Third-Party Product Inspection Saving Time and Money by Shifting Inspection to the Supplier.
First Article Inspection Report
EPSON STAMPING ISO REV 1 2/10/2000.
SUBSAFE and the NASA / Navy Benchmarking Exchange
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Quality Management System
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
ISO 9000 Certification ISO 9001 and ISO
DSS-SOC (Deep Submergence Systems Scope of Certification) Program
Amusement Ride Presentation Designed for Amusement Ride Owners and Operators * Hyperlinks are available throughout the presentation. Click on the blue.
First Article Inspection
1 Inspection and Testing Approved for Public Release.
Bodil Mose Pedersen, DHI Status for implementering af ”Quality Manual”
1 RPS Critical Planning Preparation & Delivery of Critical Parts Goodrich Aerostructures Group.
Introduction to Software Quality Assurance (SQA)
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Safety-Critical Systems 6 Safety and Quality Management and Certification T
From Research Prototype to Production
1 Quality Assurance In moving information from statistical programs into the hands of users we have to guard against the introduction of error. Quality.
PRESENTS.
1 International Aerospace Standard for for First Article Inspection(FAI) First Article Inspection(FAI) Dick Pocock VP, Quality Assurance Honeywell Engines.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
This file contains the PowerPoint presentation for the significant changes to the JFMM applicable to all Volumes with the exception of the Nuclear Addendum.
20/10/ Paul Webb, Stewart Millar MARINE DIVISION – OVERSEAS SUPPLY ISSUES.
1 Package Marking, Packing List and Invoice Data Requirements for EB Receiving & Invoicing Approved for Public Release.
What Documentation Needs to be Submitted With an Approval Application?
06/27/100 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 Philippe Removille SNECMA Moteurs 5.
1 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 AS9102, EN 9102, SJAC 9102 Dick Pocock VP, Quality.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
06/27/100 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 Chetan Date, Ph.D., P.E. Director of Design.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
Supplier Quality Improvement
Controlled Storage Training Presented by Marcie Dickson Honeywell Quality Engineer NASA Safety and Mission Assurance
Duties and Responsibilities
Quality Standards ISO:9000 ISO:9000 Quality Systems Under ISO:9000 Quality Systems Under ISO:9000 ISO:14000 ISO:14000 ISO Certification Process ISO Certification.
FEDIAF Guide to Good Practice for the Manufacture of Safe Pet Food TRAINING PACKAGE Module VII Purchasing and delivery for the Manufacture of Safe Pet.
Safety and Mission Assurance Lockheed Martin Space Operations (LMSO) Science, Engineering, Analysis, and Test Operation Safety and Mission Assurance Activity.
Lifting Gear TDI-Brooks Policies & Procedures Nov 2015.
Inspection & Test Plan (ITP) / Manufacturing Process Quality Plan (MPQP) - training of suppliers to FMC Technologies, Norway QRL FMC Standard.
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – CowesDate:13/5/16.
External Provider Control
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
World Health Organization
Introduction CSWIP (Certification Scheme for Welding and Inspection Personnel) is administered by The Welding Institute. The CSWIP certification process.
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – Cowes Date: 13/5/16.
Auditing Information Technology
First Article Inspection
Traceability of Gas Pipeline Materials Research & Materials Manager
PRODUCT EVALUATION & TESTING BRANCH SUPPLIER SUPPORT DIVISION II
Inspection and Testing
SQA01 Guidance Material: FAI Review
First Article Inspection
CUSTOMER (Requirements) CUSTOMER (Satisfaction)
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
First Article Inspection (Per AS9102)
Supplier Briefing Pack
DOE Review of the LCLS Project October 2006
Presentation transcript:

SUBSAFE Approved for Public Release On April 10, 1963, while engaged in a deep test dive, the nuclear submarine USS THRESHER (SSN 593) was lost at sea with all persons aboard. Based on the findings of a Court of Inquiry and the subsequent Joint Congressional Committee on Atomic Energy hearings into the loss of the THRESHER, it was concluded that a flooding casualty in the engine room, resulting from a piping failure in one of the sea water systems, was the most probable cause of the loss. Approved for Public Release

Lives Lost Aboard the U.S.S. Thresher The following men were lost while serving on USS Thresher (SSN-593). SUBSAFE Approved for Public Release

SUBMARINE SAFETY (SUBSAFE) PROGRAM NAVSEA 0924-062-0010 Revision C SUBSAFE Approved for Public Release

SUBSAFE Requirements Current requirements for the SUBSAFE Program are invoked in the Submarine Safety (SUBSAFE) Certification Manual, NAVSEA 0924-062-0010, Revision C. SUBSAFE Approved for Public Release

SUBSAFE Requirements The SUBSAFE Program provides a maximum reasonable assurance of the integrity of submarine design, systems and materials via Design Review, Shipboard System Testing and Objective Quality Evidence (OQE) that all materials and components meet drawing and specification requirements. SUBSAFE Approved for Public Release

Objective Quality Evidence (OQE) OQE is a statement of fact, either quantitative or qualitative, pertaining to the quality of a product or service based on observations, measurements, or tests that can be verified. SUBSAFE Approved for Public Release

Identification of SUBSAFE Items SUBSAFE Certification requirements are incorporated into Electric Boat Purchase Orders. Identification of SUBSAFE material on the Electric Boat Purchase Order is by way of the “EB REF ONLY SMC CAT:” field of the part description. A “1” in this field signifies that the part is a SUBSAFE or “Hull Integrity” (HI) certification item. SUBSAFE Approved for Public Release

Identification of SUBSAFE Items Approved for Public Release

SUBSAFE Requirements SUBSAFE Certification is accomplished by the Shipbuilder after installation of material or components onto the ship. Certification uses the OQE provided by the supplier which is then entered into the Electric Boat Material Quality System (MQS), after acceptance of the material by Electric Boat Supplier Quality Assurance. SUBSAFE Approved for Public Release

SUBSAFE Certification/Inspection Attributes Electric Boat certification/inspection attributes invoked in the Purchase Order include the following: Verification of Material (Chemical and Mechanical Test results along with all Metallurgical Tests required by the applicable Military Specification of Drawing). NDT required by the applicable specification or drawing. Hydrostatic Testing required by specification or drawing. SUBSAFE Approved for Public Release

SUBSAFE Effects… Production or Operation Testing required by specification or drawing. Torque certification for installed fasteners, when required by the drawing and specified in the Purchase Order. Traceability of all Level I or SUBSAFE parts for the raw materials used. Inspection of the hardware includes a complete verification of all visible traceability markings. Inspection of the hardware also confirms compliance dimensional attributes required by the drawing. SUBSAFE Approved for Public Release

SUBSAFE Affects… Visual inspection of the hardware is also performed to ensure compliance with all visual and surface finish requirements. All Welding, NDT and Testing (when required) Procedures are verified to be previously approved by Electric Boat on a Vendor Procedure Approval Request (VPAR) Form. SUBSAFE Approved for Public Release

SUBSAFE Certification Requirements for Suppliers Obtain and Review Raw Material Chemical and Mechanical Test Reports. Maintain Traceability from hardware to the Test Reports through all phases of processing and manufacture. Perform all required NDT and provide Test Reports of the NDT. Insure that all Special Processes (NDT, Welding, etc.) has been accomplished in accordance with Electric Boat approved procedures. Insure welding is accomplished in accordance with weld procedures and Drawing requirements and provide all weld records, as required by the process specification. SUBSAFE Approved for Public Release

SUBSAFE Certification Requirements for Suppliers Perform all Testing required by the Specification, Drawing and Purchase Order and provide Test Reports for the Testing. Insure that all documentation meets the requirements of Electric Boat Specification 2678 H, Appendix A. Assemble the Documentation Package, including an Assembly Record, when required. Visually and Dimensionally inspect hardware to verify compliance with Specification, Drawing and Purchase Order requirements. Insure all Traceability Marking is on the hardware and is legible. Insure adequate protection is provided during shipment and all shipping containers are properly identified. SUBSAFE Approved for Public Release

Typical Certification Errors Identified During NAVSEA Audits: Incorrect traceability data entered on the OQE. Incorrect VPAR referenced for NDT or Welding Procedure used. Torque Record indicates an incorrect torque or incorrect lubricant was used. Raw material is in an incorrect heat treatment condition. SUBSAFE Approved for Public Release

Who is Responsible for Submarine Safety? Submarine Safety is the responsibility of all parties involved, from the manufacturer of the raw material, through installation and test onboard a nuclear submarine. The lives of the US Navy sailors depend upon compliance to the strict guidelines of the Submarine Safety (SUBSAFE) Program. SUBSAFE Approved for Public Release

Submarine Safety (SUBSAFE) Program USS VIRGINIA heading out on initial sea trials SUBSAFE Approved for Public Release