Group Members:Ajanthan Asokan William Barkhouse Matthew Browne Stephen Handrigan February 4, 2014 Client: Dr. Michael Hinchey.

Slides:



Advertisements
Similar presentations
(The Artist Formerly Known As LEAP) Informational Session.
Advertisements

Senior Design Project TCU Computer Science Department © Computer Science Department, Texas Christian University.
Stepper Motors. Motors coils of conductive wire magnetic fields rotational motion –except for linear induction motor everywhere from the very large (LRT)
CUTTHROAT ENERGY Preliminary Design Review. Sponsored by:
EDGE™ MAV Control System - P Management Review (MSD I) Erik Bellandi – Project Manager Ben Wager – Lead Engineer Garrett Argenna – Mechanical Engineering.
11/28/06Preliminary Design1 Automated Excel Grading System Welcome Ms. Jami Cotler and Dr. Scott Hunter And Guests.
ME Project: Air Conditioner Lab Team: 10 Members: Sean M. Gallagher, Brian Davison, Prathana Vannarath, Pam McDowell Customer: University of Delaware Mechanical.
P ROMETHEUS 5 System Overview.
EDGE™ Final Project Plan P09701 – Corning Tropel LightGage™ Metrology System Matthew Bradley (ME) Images Courtesy of Corning Tropel.
MSD P07302Design Review1 Motor Controller Subsystem MSD P07302 Project Sponsor: KGCOE Project Members: D. ShenoyProject Manager S. TallauSoftware Design.
April 1, 2014 Client: Dr. Michael Hinchey Group Name: LifeSub Engineering Group Number:M14 Group Members:Ajanthan Asokan William Barkhouse Matthew Browne.
Lecture 4: Phases of Engineering Design
1 Systems Design Review Group P14345 Team Lead: William Sender Jeffrey Auclair Bryan Beatrez Michael Ferry.
Travel Website Enhancement Project Project Update First Name Last Name.
Kick-off Meeting Kick-off Meeting Presented By:.  Project/s overview and Scope  Project Organization Structure  Client Overview  Project Profitability.
Introduction to the Major Design Project (MDP) University of Western Ontario Faculty of Engineering Science Introduction to Engineering Design, ES 1050.
1 The KlutchCrew AHC2.0 INTEGRITY CONSULTING Chris Coraggio Asmi Joshi Estefi Medina Amanda Schreier.
GROUP 9: SENIOR DESIGN DEANNA MCKENZIE MICHAEL D. BROWN WILLIAM THORNTON Gunnery Control Handle 1.
Senior Design Laboratory Design Dec 05-01
Project Status Report Presenter Name Presentation Date.
Facility Integration Project Update Chelsea Smith – Project Manager Lake Shore Solutions.
Petals SAP Point of Sale System M.Tech. Team SE 15 (Saturday) Team Aug-2008.
Guangzhao Mao Department of Chemical Engineering and Materials Science College of Engineering Institute for Manufacturing Research.
BIOLOCH 10 th month Meeting BIO-mimetic structures for LOComotion in the Human body Heraklion, Crete, March 7-8, 2003 Institute of Computer Science Foundation.
CS-EE 481 Spring January, 2007 University of Portland School of Engineering Project Enterprise Biggerfoot Textbook Exchange Team Andrew Elliott Robert.
Knowledge Bowl System Team Fire on the Mountain: Jennifer Bond, Rob Cagan, Michael Patterson, & Jonathan Smith Faculty Advisor: Dr. Joseph Hoffbeck Dr.
1 National Wind Technology Center Wind Turbine Design According to IEC (Onshore) and -3 (Offshore) Standards Overview for NWTC November 8, 2005.
Sandy Butterfield 2006 Wind Program Peer Review May 10, 2006 Overview of the Technology & Opportunities.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
Design of a Vertical-Axis Wind Turbine
EE/CS 480 Spring February 2008 University of Portland School of Engineering Team Matthew Gridley Tim Morris Nathan Oliver Advisor Dr. Rylander Industry.
THROUGH NERANJAN DHARMADASA JAMES BROWN P09451: Thermo-Electric Module for Large Scale Systems.
Sponsored By: Freescale Sponsor: Kevin Kemp Faculty Advisor: William Stapleton Project # 1.3.
November 6, 2002Aging Mechanical Systems Program FAA Aging Mechanical Systems Program Program Overview Robert McGuire November 6, 2002.
Wind Tunnel Wave Tank Team members: Kirk Hansen Devin Knowles
Client Senior Design Electrical and Computer Engineering Iowa State University Introduction Abstract Architectural plans are currently being developed.
Solar Probe Plus FIELDS Team Meeting Management 7/07/2015.
EE/CS 480 Spring February 2008 University of Portland School of Engineering Team Matthew Gridley Tim Morris Nathan Oliver Advisor Dr. Rylander Industry.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
UNDERWATER SALVAGE ROBOT PROPOSAL HydroBotics Inc. O CTOBER Luke Karr Erin Fogle Dan Sowa Corbin Kruczek Kyle Zimmerman Will Huddleston Dr. Firas.
CHANGE MANAGEMENT - PART 2 MODULE 7
March 6, 2014 Client: Dr. Michael Hinchey Group Name: LifeSub Engineering Group Number:M14 Group Members:Ajanthan Asokan William Barkhouse Matthew Browne.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
P16512 – 3D Printing Ink Development Test Rig
Endotracheal Tube Pressure Monitor
DAG CH 3 Figure 11: Weapon System Development Life Cycle
Risk Reduction Strategies Funct. & NF Requirements Summaries
DAG CH 3 Figure 17: Weapon System Development Life Cycle
DAG CH 3 Figure 23: Weapon System Development Life Cycle
DAG CH 3 Figure 13: Weapon System Development Life Cycle
February 12 – 19, 2018.
DAG CH 3 Figure 19: Weapon System Development Life Cycle
DAG CH 3 Figure 18: Weapon System Development Life Cycle
DAG CH 3 Figure 28: Weapon System Development Life Cycle
DAG CH 3 Figure 15: Weapon System Development Life Cycle
Team member1 Team member2 Team member3 Team member4 October 2016
<Project Name> Milestone Summary Report
Xoserve IX Refresh Customer Update 03/01/2019.
Technology Maturation & Manufacturing Development Phase
Use of Real-Time Simulation in the Caithness-Moray HVDC Transmission Project Dr. Oluwole Daniel Adeuyi 10th April 2019 Keynote Presentation at the 4th.
General Assembly Meeting
National Centre Transformation Programme
The Design Process.
Project Progress: The Floating Dutchmen
Wave and tidal demonstration projects - Technology risk “Insurance”
DAG CH 3 Figure 21: Weapon System Development Life Cycle
DAG CH 3 Figure 27: Weapon System Development Life Cycle
DAG CH 3 Figure 22: Weapon System Development Life Cycle
DAG CH 3 Figure 25: Weapon System Development Life Cycle
Presentation transcript:

Group Members:Ajanthan Asokan William Barkhouse Matthew Browne Stephen Handrigan February 4, 2014 Client: Dr. Michael Hinchey

Agenda Project Overview Problem Statement Strategy Current Progress Upcoming Milestones Presentation 2 Deliverables Questions February 4, 20142

Project Overview February 4, Previous Incidents Current Solutions Outstanding Risks Fire Ice Waves Wind

Problem Statement To provide a solution for evacuation of an offshore structure through the development of a fully-submersible vessel deployable from the topsides of an offshore structure February 4, 20144

Strategy Phase 1 Prototype Development Deployment Strategies Phase 2 Submarine Fabrication Prototype Commissioning Deployment Testing Phase 3 Option A: Preliminary Full-scale Design Option B: Revisit Prototype Design February 4, 20145

Current Progress – Phase 1 February 4, Design of the prototype model Structural Design Mechanical Design Electrical Design Motion analysis – In Progress Circuit BoardThruster Stepper MotorBatteryBallast Tank

Deployment Strategies February 4, 20147

Upcoming Development- Phase Submarine Fabrication Dave Snook – Tech Services Andrew Bazeley – Tecnadyne Paul Sirois – Clark Solutions Brian Pretty – Manufacturing Technology Centre 02. Prototype Verification Michael Hinchey – Client 03. Deployment Method Testing Leonard Lye – DOE Specialist February 4, 20148

Presentation 2 Deliverables Test analysis completed Phase 3 Project Direction Finalized February 4, 20149

Questions? February 4, Thank-you