LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.

Slides:



Advertisements
Similar presentations
AUDITS 29 th November 2011 Marriott Hotel, Leeds Presentation by Robert Jopling BEng, CEng, MICE Member of Scottish Registration Board.
Advertisements

COMPANY MAINTENANCE MANUAL
Managing the Health and Safety of Contractors
Hussey Fraser Solicitors
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
2/27/2013DSA - PROJECT CERTIFICATION1 STREAMLINING PROJECT CERTIFICATION CHANGING CULTURE AND CHANGING PROCESSES DSA: CHANGING CULTURE & CHANGING PROCESSES.
IAEA International Atomic Energy Agency Responsibility for Radiation Safety Day 8 – Lecture 4.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
1 Certification Chapter 14, Storey. 2 Topics  What is certification?  Various forms of certification  The process of system certification (the planning.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
Future Defence Aviation Safety Regulation Module 3 EMAR Part M – Continuing Airworthiness Requirements May 2015.
Maureen O’Sullivan Registrar Companies Registration office
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
SER Organisation and Governance Dr Sue Doran Company Secretary and Head of Certification.
SELECT Scheme Provider Certification of Construction (Electrical Installations to BS 7671)
1 OVERVIEW PRESENTATION FREEDOM OF INFORMATION (SCOTLAND) ACT 2002.
About ACE Purpose of ACE ACE exists to represent its members’ interests to clients, both government and private sector, and stakeholder organisations,
1 Licensing Scheme for Drug Dependent Persons Treatment and Rehabilitation Centres.
Finance Directors Forum SETTING THE STANDARDS Crawford Temple Professional Passport.
Consumer Code for Home Builders Noel Hunter Chairman 1.
Partners in Compliance Local Authority Building Standards Scotland Bob Renton FRICS Consultant to LABSS Honorary President LABSS.
New Zealand Building Code What is it?. The New Zealand Building Code is the first schedule to the Building Regulations All building work must comply.
Part of the BRE Trust Approved Certifiers of Design: Section 6 (Energy) BRE Scotland.
Railway Transport Equipment (RTE) Certification Railway Transport Equipment Certification Procedure Application for railway transport equipment certification.
2008 New York - Member Forum Council for Responsible Jewellery Practices, Ltd. Overview of CRJP.
The New Building Standards System Completion certificates.
1 Asia Singapore Building and Construction Authority (Building Engineering Division) Managing Geotechnical Risks – are we learning from our failures 29.
Prime Responsibility for Radiation Safety
Openscotland Information Age Framework Craig Russell 21st Century Government Unit, Scottish Executive 29th October 2004.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Approximation of legislation to the internal market acquis An EU funded project managed by European Agency for Reconstruction Directive 89/106/EEC on Construction.
New COP for WLTP André Rijnders Senior advisor vehicle emissions and fuels Vehicle Standards Development RDW, The Netherlands 1 Conformity of production.
Building Industry Authority Determination 2003/3 Commentary Paul Clements.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
EN EUROPEAN COMMISSION Budgetary Control Committee of European Parliament Budgetary Control Committee of European Parliament Brian Gray DG BUDGET Workshop.
Robustdetails Feedback from Robust Details Technical Advisors.
Building Regulations & The Building Control System 4A7 Design & the Built Environment John O’Connor.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
PROJECT CONCEPTION AND MONITORING PRESENTED BY: OLOJEDE SAMSON OLUSOLA DEPUTY BURSAR UNIVERSITY OF IBADAN 5 TH APRIL, 2016.
Health and Safety Executive Health and Safety Executive MANAGING CONTRACTORS Alec Ferguson HSE.
Introductory presentation for schools Academies.
ICAO COSCAP - SA May AERODROME CERTIFICATION COURSE How can aerodrome certification be achieved? Establish an appropriate regulatory system within.
The Repairing Standard ELECTRICAL INSTALLATIONS AND APPLIANCES.
Introductory presentation for schools Academies.
Pat Nestor MSCSI MRICS Head of Building Control Dublin City Council
Transnational training seminar for potential Lead Partners and Partners to INTEREGG IIIB-CADSES procedures for 3° call for proposal CADSES implementation.
Sustainable new homes and sound insulation 2006
Administration of a FIDIC Contract - Project Control
Particular Conditions of Contract & Appendix to Tender
The Public Sector Equality Duty (PSED) & Integration Joint Boards
Auditor Training Module 1 – Audit Concepts and Definitions
RIBA Plan of Work 2013.
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
UNR116 splitting Informal document GRSG
TERMS OF REFERENCE - FINANCE COMMITTEE
Particular Conditions of Contract & Appendix to Tender
Temporary Works Co-ordination
Project Development and Managing your Build Agenda
People Responsible For Health and Safety
The Construction (Design and Management) Regulations 2015
Work Placements 2018/19.
Effective Building Control System
Operationalizing Export Certification and Regionalization Programmes
Management Verifications & Sampling Methods
Commission Regulation (EC)
About ACE Purpose of ACE Values
BCAR & The Technical Guidance Documents Conference 2019 Part E: Sound
RIBA Plan of Work 2013.
Presentation transcript:

LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd

“ the structural engineer is acknowledged by all parties as the one specialist who can ensure the structure is safe. However the engineer often finds that these same parties are not giving him the leeway and opportunities to make their expectations a reality….” Dutch Inspectorate of Housing, Spatial Planning and Environment April 2009

The contractual arrangements used by clients to procure a building can have important consequences for the reliability of the design and the adequacy of the construction. Frequently, building design procurement will involve the appointment of a number of designers who may be employed by more than one organisation. Detailed design of individual structural details and components can be passed to specialist contractors. In these circumstances the client should appoint a lead designer or other appropriately experienced and qualified person to oversee the design process. Technical Handbook 2010 Guidance on Procurement

………Such schemes are approved on the basis that the procedures adopted by the scheme will take account of the need to co- ordinate the work of various designers and specialist contractors………. Technical handbook Certification Schemes

Technical handbook S1.1.1 Fixings The SCOSS committee has expressed concern that safety critical fixings do not always receive the attention that they deserve……. ….. Designers must be satisfied that fixings receive the same consideration as other aspects of the design …….

Information To Be Supplied With a Warrant Application The Building Procedure) (Scotland) Regulations; Schedule 2 to Regulation 4(2) Plus S4(3) Any further information or additional plans that the verifier requires

STAGED WARRANTS  Commencement before all design information is known – One Warrant Application with staged amendments (Freedom to Agree stages with Verifier)  Conditional grant of Warrant  Separate design certificates for each staged amendment  One completion certificate & One Q Form

PRE - WARRANT DESIGN CHANGES  No Warrant Amendment Required therefore no amendment certificate - but  Verifier may request new design certificate – or  Contact SER to have certificate redated Care required to ensure that warrant plans relate to certified design (guidance note 8)

POST WARRANT DESIGN CHANGES Type of Change Change to certified work Change affecting certified work Change not affecting certified work Certifier Action Redesign and issue new certificate Verifier may request confirmation letter

METHODS OF DESIGN COMPLIANCE  Eurocode design deemed compliance (2010 Standards) Technical Handbooks S1.1.3 Reference to Assumptions in BS EN 1990 and “Those responsible for procuring the design …. based on Structural Eurocodes ….. should ensure that they have employed individuals with the necessary ….. experience and that appropriate procedures for checking designs have been adopted.”

S1.0.5 Technical handbooks Alternative Approached British standards BBA Agrément Certificates Small Buildings Structural Guidance

Sections On : Stability Foundations Masonry walls Timber Frame Walls Timber floors & Roof Members

Completion Certificates & Form Q Building Scotland Act 2003 Section 17 (1) After the completion of the work or conversion in respect of which a building warrant has been granted, the relevant person must submit to the verifier a completion certificate certifying: (a) that the work was carried out …… in accordance with the building warrant, and (b) …….the building as constructed complies with building regulations (c) … the building as converted complies with building regulations.

MULTIPLE PLOT COMPLETIONS Dwellings - separate completion for each unit –Separate form Q for each unit Or –Letter confirming schedule 1 items that relate to that unit Other Building Types may only require single completion certificate

SCOTTISH TYPE APPROVAL SCHEME (STAS)  Operated By Local Authorities  Provides Standard System Design Approvals  Two Stage Certification  Stage 1- STAS Certificate  Stage 2 – Confirmation Certificate  No Form Q Procedure  Plans & Certificates to be lodged electronically with SER