Nick Walker KEK-DESY meeting 7 th March 2005.

Slides:



Advertisements
Similar presentations
ASTeC Linear Collider Activities Susan Smith. ASTeC Aims To contribute to LC accelerator R&D, positioning the UK to take a lead in delivery of significant.
Advertisements

Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Global Design Effort 1 Summary of Technical and Collaboration Related Issues for the ILC Damping Rings N. Walker (for the Project Managers) INFN Frascati.
Accelerator and Beam Delivery The LC-ABD (Linear Collider: Accelerator and Beam Delivery) consortium is a group of UK institutes aiming to develop new.
June 15, 2005Marc Ross (ILC) – Instrumentation Development ILC Instrumentation Development Marc Ross, SLAC.
Philip Burrows LCABD Meeting, RHUL 12/04/07 WP7: Beam feedback and control systems Philip Burrows John Adams Institute Oxford University.
Status of International Linear Collider Global Design Effort Barry Barish (by telecon) HEPAP Washington DC 18-May-05.
The Path Toward a Linear Collider Barry Barish HEP 2005 Lisbon, Portugal 23-July-05.
ILC Accelerator Technical Issues Nick Walker LCWS 2005 Stanford University
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
Accelerator activities Brian Foster (Uni Hamburg/DESY) 1 B. Foster - Hamburg/DESY - Orsay 11/13.
The ILC and DESY 5th Workshop on Scientific Cooperation JINR, Dubna January 2005 R.-D. Heuer, DESY and Hamburg Univ.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding DESY and the ILC Funding from the European Union KEK/DESY Collaboration.
Global Design Effort ILC: From RDR to EDR or “How to Spend the Money” Nick Walker GDE.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
European Design Study Towards a Global TeV Linear Collider Susan L Smith.
1 HiGrade Kick-off Welcome to DESY Hamburg Zeuthen.
Operations, Test facilities, CF&S Tom Himel SLAC.
ATF-II Review by GDE Marc Ross, (SLAC) For GDE Project Managers: Nick Walker and Akira Yamamoto 24 January, th ATF2 Collaboration Meeting.
EUROTeV and the ILC Global Context Nick Walker (DESY) EUROTeV Annual Meeting INFN Frascati 24 January 2008.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
6-7 April 06 MAC Review Global Design Effort 1 European Regional Program Brian Foster GDE University of Oxford.
FALC Technology Benefits study P. Grannis Beijing GDE meeting Feb. 7, 2007 FALC = Funding Agencies for Large Colliders is composed of representatives from.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
DESY Photon Science XFEL official start of project: 5 June 2007 FLASH upgrade to 1 GeV done, cool down started PETRA III construction started 2 July 2007.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
ILC-GDE ILC-Americas 9/21/05ILC-Americas Regional Efforts1 G. Dugan ILC/GDE and Cornell University International Linear Collider Industrial Forums Fermilab.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
GG3 Operations & Reliability (Availability) Eckhard Elsen Tom Himel
F. Richard LAL/Orsay 1 ELAN in 2006 Annual Meeting.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
April 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE Paris April 2006.
Introduction D. Schulte for K. Kubo and P. Tenenbaum.
E.Elsen GDE Meeting, Beijing, Feb 2007 Perspectives and Planning for European LC R&D.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
DESY. Status and Perspectives in Particle Physics Albrecht Wagner Chair of the DESY Directorate.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
FP7: EuCARD after a year of preparation… A.Jeremie.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
P5 Potential US Accelerator Collaboration with the ILC-in-Japan Mike Harrison Mike Harrison.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
25 October 2004O. Napoly, EU-GDE meeting in Oxford 1 French Funding Agencies CNRS/IN2P3 : National research Institute on Nuclear Physics and Particle Physics.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Thomas Schoerner-Sadenius DESY Hamburg, Germany
J. Alexander + Cornell accelerator group Cornell University
What Should We Do?.
CLIC-ILC BDS & MDI work.
Accelerator Physics Technical System Group Review
ILC Global Design Effort
Progress towards nanometre level beam stabilisation
Nick Walker (DESY) EU GDE Meeting Oxford
INFN and the ILC S. Bertolucci, INFN.
Barry Barish Paris ICHEP 24-July-10
Laser Und XFEL.EU Experiment
Presentation transcript:

Nick Walker KEK-DESY meeting 7 th March 2005

N. WalkerKEK-DESY Meeting Project Group Accelerator – EUROTeV – Experimentation Behnke, Elsen, Walker (chair) High Gradient Cavities WP 6 Cryomodules Operability, Reliability, Controls Stabilisation, Vibration LLRF Diagnostics GAN & Communications Accelerator Physics and Design WP 4,5 WP 7 WP 15, 16 WP 8 Computing Detector Scientific Program WP 11 WP 4-7 WP 28,29 XFEL Detector

N. WalkerKEK-DESY Meeting DESYs contributions to the ILC SCRF Linac Technology Development TTF2 - currently a unique facility in the world XFEL -major effort to consolidate TTF technology -industrialisation -reliability -value engineering SRF R&D (FP6 CARE) Major collaboration between EU institutes towards improving SCRF - high-gradient programme (electropolishing)

N. WalkerKEK-DESY Meeting Most Visible ILC R&D at DESY TESLA Test Facility ITRP ‘cold’ decision means TTF and XFEL R&D will continue to be DESY’s major contribution to ILC R&D Most important thing TTF2 can do for ILC is to work!

N. WalkerKEK-DESY Meeting XFEL Synergy WP structure for XFEL project

N. WalkerKEK-DESY Meeting XFEL Synergy Direct 1-1 synergy with ILC

N. WalkerKEK-DESY Meeting XFEL Synergy Significant overlap with ILC

N. WalkerKEK-DESY Meeting XFEL Synergy Potential relevance to ILC

N. WalkerKEK-DESY Meeting Areas of ILC R&D Not Related to SCRF Beam Dynamics Simulations - damping ring low-emittance tuning - electron cloud and other instabilities -main linac / BDS / IP beam stabilisation studies - luminosity performance simulations -beam halo collimation / detector backgrounds Undulator-based Polarised Positron Source Development Simulations of source performance / yield Radiation damage (neutron) estimates spin transport & tuning studies (for polarised source) mostly part of EU-FP6 EUROTeV funding

N. WalkerKEK-DESY Meeting Areas of ILC R&D Not Related to SCRF Diagnostics -PETRA laser wire project (  ATF2 laserwire) -cold BPM (test station in TTF) -TTF-VUV / XFEL: (  z measurement e.g. LOLA) -Fast luminosity monitoring (pair monitor) -Precision polarimetry (low- and high-energy) -Precision spectrometry mostly part of EU-FP6 EUROTeV funding

N. WalkerKEK-DESY Meeting Areas of ILC R&D Not Related to SCRF Fast Kicker Development -R&D needed for XFEL -applicable for DR (depends on final DR bunch spacing) -  ATF2 Fast Intra-train Feedback Development Digital feedback system installed in TTF-VUV Needed for XFEL mostly part of EU-FP6 EUROTeV funding

N. WalkerKEK-DESY Meeting Areas of ILC R&D Not Related to SCRF Reliability & operability -(Clearly) very important for XFEL -Continued studies using Himel code (SLAC) -Benchmarking against existing machines (TTF and HERA – ongoing) Ground motion, vibration & stabilisation -Measurement of spectra at potential ILC sites (on-going) -Characterisation / modelling of ‘cultural noise’ -Investigation of cold linac quad vibration -Passive and active techniques for stabilisation mostly part of EU-FP6 EUROTeV funding

N. WalkerKEK-DESY Meeting Areas of ILC R&D Not Related to SCRF GAN -Understanding the challenges of remote operation (user needs) -Development of Mobile Virtual Laboratory (MVL) as test bed for remote operations -  ATF2? & Communications -Defining required collaboration tools for a global project -Developing & supporting central project management services -Understanding how best to ‘work together’ mostly part of EU-FP6 EUROTeV funding special talk by Ferdi Willeke after coffee

N. WalkerKEK-DESY Meeting DESY, Europe, and the World DESY’s major contribution is the on-going activities related to the preparation for the XFEL TESLA SCRF Linac Technology However, direction and scope of R&D is locked to the XFEL timescale Do not have much flexibility If ILC linac R&D moves away from the basic TESLA concept, synergy with XFEL (and DESY!) will become weaker. For other areas of ILC research, there is more flexibility But for EU funded projects we need to deliver what we promised Major changes in scope and planning maybe problematic (but not impossible). DESY expects to contribute to, but not necessarily lead in these areas.

N. WalkerKEK-DESY Meeting DESY, Europe, and the World DESY can play a central role within Europe for the GDE Leading laboratory for the TESLA Collaboration Coordinating Laboratory for the EU FP6 EUROTeV project (together with CERN) Coordinating laboratory for SRF part of the CARE EU FP6 project. DESY + UK Institutes probably strongest ILC advocates within Europe but hopefully this will change. We strongly believe the best way forward towards realisation of the ILC is a ‘strong collaboration of equal partners’