AB/ATB-EA ML, le 30/03/071 MERIT INSTALLATION. AB/ATB-EA ML, le 30/03/072 MERIT INSTALLATION Total supported weight Solenoid: 5500 kg (12000 lbs) Hg System.

Slides:



Advertisements
Similar presentations
STI Test Facility: Photos Taken in Test Area and Two Labs: 18 May 2006.
Advertisements

MERIT Hg System Design V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Review Meeting Brookhaven National Laboratory Dec 12, 2005.
NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
MERIT Hg System Final Design Review Hg Target System Design Interfaces V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma.
Target System Transportation and Decommissioning P.T. Spampinato V.B. Graves Hg System Safety Review CERN June 19-20, 2006.
Managed by UT-Battelle for the Department of Energy Neutrino Factory Mercury Containment Concepts V.B. Graves 2 nd Oxford-Princeton High- Powered Target.
Harold G. Kirk Brookhaven National Laboratory MERIT Experiment Status NFMCC Collaboration Meeting FNAL March 17-20, 2008.
MERcury Intense Target (MERIT) Experiment – or nTOF-11 Pre-installation Safety Review Ilias Efthymiopoulos Adrian Fabich (CERN - AB-ATB-EA) Pre-installation.
VRVS, Jan. 2006CERN AB-ATB1 MERIT layout in TT2/TT2A/TT10 CERN AB-ATB VRVS session, Jan
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.
Harold G. Kirk Brookhaven National Laboratory The MERIT High-Power Target Experiment Muon Collider Design Workshop BNL December 3-7, 2007.
VRVS session, 8th March 2006CERN AB-ATB-EA1 Layout of Passages between TT2 and TT2A Adrian Fabich, CERN AB-ATB-EA VRVS session, 8.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
MERcury Intense Target (MERIT) Overview Van Graves, ORNL Syringe Procurement Kickoff Meeting Airline Hydraulics Bensalem, PA Oct 28, 2005.
Hg System Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting October 20, 2006.
NFMCC Meeting - 13 March 2006 I.Efthymiopoulos, A.Fabich, CERN AB-ATB-EA1 MERcury Intense Target (MERIT) Experiment Installation Issues I. Efthymiopoulos.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
MERcury Intense Target (MERIT) Experiment – or nTOF-11 Mercury System Safety Review Ilias Efthymiopoulos Adrian Fabich (CERN - AB-ATB-EA) Hg-system Safety.
The MERIT High-Power Target Experiment H. Kirk (BNL) CERN November 1, 2007.
MERIT Experiment Status MERcury Intense Target K. McDonald for the MERIT Collaboration August 30, 2007 TT2/TT2A: MERIT Build.272: Offices & Control Room.
Hg System Decommissioning V.B. Graves P.T. Spampinato CERN Feb 7-8, 2008.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
Target System Operations and Hg Handling P.T. Spampinato V.B. Graves MERIT Hg System Safety Review CERN June 19-20, 2006.
Videoconference, 3rd May 2005A.Fabich, CERN1 Nitrogen release from the TT2A cryogenic solenoid systems A.Fabich CERN AB-ATB, Switzerland Videoconference,
MERIT pre-installation review: Preliminary conclusions A.Fabich.
Managed by UT-Battelle for the Department of Energy Follow-on MERIT Testing at ORNL Van Graves NFMCC Friday Meeting Feb 29, 2008.
High Power Hg Target Conceptual Design Review Equipment Installation at CERN V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
NTOF11 Collaboration Meeting Non-Design Issues for the Mercury Jet Target P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University April 29-30, 2005.
MERIT Hg System Final Design Review Hg Target System Operations V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science.
Managed by UT-Battelle for the Department of Energy Hg System Decommissioning Activities V.B. Graves NFMCC Friday Meeting Feb 29, 2008.
Summary of Hg System Review at CERN Van Graves 13 Sep 2005.
1.Sep.2004A.Fabich, CERN AB/ATBORNL target workshop Workshop on high power targets at ORNL A.Fabich CERN AB/ATB 1. August 2004 message from the research.
Phone 9.Sept.2004A.Fabich, CERN1 modifying beam line TT2A A.Fabich Phone conference 9.Sept.2004 All information available on
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
Transport and Handling (T&H) considerations for HL-LHC
Transport & Handling of Detectors TAN Workshop S. Prodon –
Transport need for SPS external dump to the new dump cavern area LIU-SPS external beam dump JL GRENARD EN-HE
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
M M M M 5. Not Listed
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.

L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
Logo area Handling Engineering Requirements EN-HE Group Bruno Feral – EN/HE EDMS HL-LHC CE Consultant Kick-Off Meeting – 31/05/2016.
MERIT status A.Fabich CERN VRVS 9 th Oct A. Fabich, CERN, VRVS 9th Oct 2007.
CLIC Handling Engineering Update
Schedule CM SPS G.Vandoni.
SX1 manipulation VERSION 1 Version
1. 2..
MERcury Intense Experiment Experiment Layout
Optical Diagnostics Networking at CERN
Hg System Decommissioning Activities
Unit 1 Review Measurements.
A very first look at siting issues
V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004
Dump Transport from Dump Hall to XSE (updated Version)
Mercury Catcher Status
Status on the PS/SPS  MERIT (nTOF11) interface
MERIT pre-installation review: Preliminary conclusions
Present and Future test facilities for High-intensity Targetry CERN
Measurements and Calculations
Nitrogen release from the TT2A cryogenic solenoid systems
MERIT – status and schedule
Group 1 Group 2 Group 3 Group 4 61 m 35 m 52 m 35 m 63 m 40 m 54 m
Group 1 Group 2 Group 3 Group 4 61 m 35 m 52 m 35 m 63 m 40 m 54 m
Presentation transcript:

AB/ATB-EA ML, le 30/03/071 MERIT INSTALLATION

AB/ATB-EA ML, le 30/03/072 MERIT INSTALLATION Total supported weight Solenoid: 5500 kg (12000 lbs) Hg System with 23liter Hg: 1800 kg (4000 lbs) Baseplate: 450 kg (1000 lbs) Maximum width of 1.3m (51") to meet CERN facility constraints

AB/ATB-EA ML, le 30/03/073 MERIT INSTALLATION Layout

AB/ATB-EA ML, le 30/03/074 MERIT INSTALLATION Cranes and shaft…

AB/ATB-EA ML, le 30/03/075 MERIT INSTALLATION Solenoid handling with “yellow” cross-bar

AB/ATB-EA ML, le 30/03/076 MERIT INSTALLATION Mercury loop

AB/ATB-EA ML, le 30/03/077 MERIT INSTALLATION Mercury loop handling

AB/ATB-EA ML, le 30/03/078 MERIT INSTALLATION Placing solenoid on the baseplate 1. Baseplate on wedge 2. Solenoid on baseplate 3. Baseplate towed up slope with tractor “VOLK” 4. Wedge removed, traverse down TT2

AB/ATB-EA ML, le 30/03/079 MERIT INSTALLATION Handling with “VOLK” (testing with a dummy in TT2)

AB/ATB-EA ML, le 30/03/0710 MERIT INSTALLATION TT2 to TT2A

AB/ATB-EA ML, le 30/03/0711 MERIT INSTALLATION Same handling procedure for mercury loop…

AB/ATB-EA ML, le 30/03/0712 MERIT INSTALLATION Transport Hg SystemRemove RollersTransport Baseplate Remove Rollers, Level MagnetRoll Hg System into MagnetAdd Rollers

AB/ATB-EA ML, le 30/03/0713 MERIT INSTALLATION Roll System into Beam LineRemove Rollers Elevate & Tilt