Loss of Configuration Management at Millstone Millstone Refueling Floor Arrangement.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Module N° 4 – ICAO SSP framework
Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
Radiopharmaceutical Production
Rate Plan. Value Story When asked, our customers identify the following topics as ways MidAmerican Energy provides value – Emergency Response.
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
1 Continuing Evolution of U.S. Nuclear Quality Assurance Principles, Practices and Requirements PART II - A Tutorial August 2005 This document.
Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
NRC Perspective of Recent Configuration Management Issues Tom Farnholtz Chief, Engineering Branch 1 Division of Reactor Safety, Region IV June 2014 CMBG.
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
Environmental Management Systems An Overview With Practical Applications.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
TELLEFSEN AND COMPANY, L.L.C. SEC Regulation SCI and Automation Review Policy Compliance March 2013 Proprietary and Confidential.
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Protection Against Occupational Exposure
Control environment and control activities. Day II Session III and IV.
Federal Emergency Management Agency Radiological Emergency Preparedness Program Region I, Boston September 10, 2012.
© 2014 Institute of Nuclear Power Operations Institute of Nuclear Power Operations Industry Shaping Event 1996 Millstone Loss of Configuration Management.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Design Bases From 1957 to 2003 June 18, 2007 Chuck Casto Region II NRC.
GSI-191 Status and Lessons Learned Presented by: Donnie Harrison Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Presented at:
1 “Lessons Learned - Construction of the National Enrichment Facility” Stephen Cowne Director, Quality & Regulatory Affairs Louisiana Energy Services (LES)
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
Nov Readiness Review Course Implementation Plan - Mod 8 Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Configuration Management Fundamentals including Margin.
NHUG - Boston - 08/04/20101 Considerations for Operability of Chillers and Chilled Water Systems NHUG Summer Meeting August 4, 2010 Tim Mitchell Component.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Health and Safety Policy
ACADs (08-006) Covered Keywords CFR policy, CFR violation, CFR enforcement Description Supporting Material
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Hazards Identification and Risk Assessment
Doug Stephens Program Manager USW TMC Grant Programs (Mobile) (Office)
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Configuration Management Fundamentals including Margin Management Bill Kline FirstEnergy Nuclear Operating Company (FENOC) June 2, 2008 Shell Beach, CA.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
ISO Registration Common Areas of Nonconformances.
Elementary School Administration and Management GADS 671 Section 55 and 56.
Practice of HOF regulatory oversight E.G. Kudryavtsev Department of Safety Regulation of Nuclear Fuel Cycle Facilities, Marine Nuclear Power Installations.
1 Public Meeting with ASME to Discuss Pump Inservice Testing Issues NRC Headquarters OWFN Room 1F22 June 4, 2007.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
CMBG Conference 2013 Atlanta GA June 3, 2013 ANSI/NIRMA Standard CM Year History.
OHSAS Occupational health and safety management system.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Planning for Succession
Status and Prospect of Korean Korea Electric Power Research Institute
(Additional materials)
Flooding Walkdown Guidance
CR3 and Crystal River Energy Complex
NRC Cyber Security Regulatory Overview
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Regulatory Oversight of HOF in Finland
TRTR Briefing September 2013
System Safety Regulation
Radiopharmaceutical Production
Presentation transcript:

Loss of Configuration Management at Millstone

Millstone Refueling Floor Arrangement

Loss of Configuration Management at Millstone Time © Article, March 6, 1996, condemning Millstone management was released This article alleged that Millstone Unit 1 had routinely violated safety rules during refueling operations This article further criticized the Nuclear Regulatory Commission (NRC) for having knowledge of the problem while turning a blind eye to it

Loss of Configuration Management at Millstone CM Issues alleged in Time Magazine: No heat-load calculations for Spent Fuel Pool The plant had been routinely operating "beyond design basis," putting 23 million BTUs into a pool analyzed for 8 million Some Spent Fuel Pool pipes weren't designed to withstand an earthquake, as they were required to do. The Utility had conducted improper full-core off-loads for 20 years. Did not wait the requisite 150-hours to move fuel. In one case, fuel was moved after 65-hours.

Loss of Configuration Management at Millstone A key root cause of the problems at Millstone proved to be the organizational culture Employees with safety issues were routinely ignored by middle and upper management at Millstone The culture at Millstone rewarded cost cutting to the point where unreasonable and unsafe methods were overlooked if significant money was saved

Loss of Configuration Management at Millstone Northeast Utilities quickly reacted to the Time Magazine article by cleaning house at Millstone All top management, and many middle managers, were either fired relocated or took early retirement Bruce Kenyon was hired to fill the position of President and Chief Executive Officer Northeast Nuclear Energy Company

Loss of Configuration Management at Millstone Bruce persuaded three utilities with highly respected nuclear programs to help with the Millstone restart –Philadelphia Electric Power Company (PECO) –Carolina Power and Light (CP&L) –Virginia Power The most important task of the recovery effort was addressing the cultural problems

Loss of Configuration Management at Millstone The Northeast Utilities stock price dropped from about 25 dollars per share to about 7 dollars per share Northeast Utilities pleaded guilty in 1999 to twenty-five felony violations of environmental and safety regulations at its Millstone power plants between 1994 and 1996 and paid a fine of $10 million. Of the total, $5 million was related directly to nuclear operations, the largest fine in the history of the Nuclear Regulatory Commission's regulation of commercial nuclear power facilities.

Loss of Configuration Management at Millstone Northeast Utilities Stock - 10-year Period Sale Agreement Time Magazine Article

Loss of Configuration Management at Millstone 31 violations involving substantial and longstanding failures to meet design control requirements and to maintain the licensing bases, 18 violations involving longstanding unsatisfactory performance in identification and correction of significant conditions adverse to quality, 8 violations of technical specifications involving inoperable equipment and degraded conditions, and 11 failures in implementing various aspects of the quality assurance program. Millstone, Units 1,2 &3 EA , , , & Supplement I A Notice of Violation and Proposed Imposition of Civil Penalties in the amount of $2,100,000 was issued on December 10, The action was based on three Severity Level II and one Severity Level III problems consisting of: In assessing the penalty in this case, consideration was given to the varying degrees of significance and duration of the violations as well as the number of examples of the violations. The penalty was comprised of $500,000 for the violations related to inadequate engineering; $1,000,000 for the violations related to inadequate corrective actions; $500,000 for the violations related to violations of technical specifications; and $100,000 for the violations of quality assurance. In arriving at the cumulative amount of the civil penalties, the staff to exercised enforcement discretion in accordance with section VII.A of the Enforcement Policy.

Loss of Configuration Management at Millstone The culture had to change to restore the confidence of the NRC, the public, and plant employees. How does culture impact configuration management? – The entire organization must understand configuration management – The entire organization must embrace the importance of configuration management – Configuration management is a team effort that requires the support of all station workers

Loss of Configuration Management at Millstone Physical Configuration What is there Design Requirements What is required to be there Inaccurate or Missing Facility Configuration Information What is said to be there CM Equilibrium Diagram as Applied to Millstone Pre-1997

Loss of Configuration Management at Millstone Configuration management training and configuration management process improvements were needed All station workers, both utility and contractors, received the training

Loss of Configuration Management at Millstone NORTHEAST UTILITIES CONFIGURATION MANAGEMENT TRAINING OPENING STATEMENTS Why we are here Where NU Management Stands Regarding Configuration Management (CM) How CM Fits into Millstone’s Future Ownership of CM

Loss of Configuration Management at Millstone NU Training on Ownership of Configuration Management PREVIOUSLY –no assigned ownership of CM –no responsibilities –no accountabilities NOW YOU Play the Key Role for implementing effective, day- to-day CM on your unit Programs & Engineering Standards will define the standards and help to make them more accessible Unit Configuration Management Teams (UCMT) will help the Line implement and integrate CM

Loss of Configuration Management at Millstone Elements of the Licensing Basis (LB) From RAC 01 ): Regulatory Commitments Plant-Specific Design Basis & Other Plant Information Documented in the FSAR Plant-Specific NRC Requirements NRC Regulations ( e.g., orders, license conditions, exemptions, and Technical Specs, Quality Assurance Topical Reports etc.) ( e.g., 10CFR Parts 2, 19, 20, 21, 26, 30, 40, 50, 51, 54, 55, 70, 72, 73, 100 and 10CFR appendices) that are docketed and in effect While design basis information is generally located in the FSAR, it can also be found in other documents, including the TRM and docketed correspondence. Defining CM

Loss of Configuration Management at Millstone Design Bases (DB) Per 10CFR50.2 Information that identifies specific functions to be performed by a Structure, System, or Component (SSC) of a facility, and the... specific values or ranges of values chosen for controlling parameters as reference bounds for design. These values or ranges may be: 1.) restraints derived from generally accepted “state of the art” practices for achieving functional goals, or 2.) requirements derived from analysis (based on calculation and/or experiments) of the effects of a postulated accident for which a SSC must meet its functional goals. Defining CM

Loss of Configuration Management at Millstone Engineering Design Bases ( per NUREG 1397 ): The entire set of design constraints that are implemented, including those that are.... (1) part of the current licensing bases and form the bases for the staff’s safety judgment and (2) those that are not included in the current licensing bases but are implemented to achieve certain economies of operation, maintenance, procurement, installation, or construction. Defining CM

Loss of Configuration Management at Millstone Defining CM Relationships Between LB, DB, & Engineering DB LB EDB DB

Loss of Configuration Management at Millstone REQUIREMENTS Tech Specs FSAR Design Basis PHYSICAL PLANT/ SIMULATOR INFORMATION = = = CM PEOPLE PROCESSES PROGRAMS PROCEDURES Defining CM

Loss of Configuration Management at Millstone Introducing Change REQUIREMENTS Tech Specs FSAR Design Basis PHYSICAL PLANT/ SIMULATOR INFORMATION = = = CM PEOPLE PROCESSES PROGRAMS PROCEDURES Change

Loss of Configuration Management at Millstone  Modifications (Temp. and Permanent)  Replacements  Design Change Record/Notice  FSAR Change Requests  Automated Work Orders  Procedure Changes  Technical Specification Changes  Regulatory Changes Typical Sources of Change

Loss of Configuration Management at Millstone PEOPLE PROCEDURES PROCESSES PROGRAMS Configuration Management Is:

Loss of Configuration Management at Millstone The impact to the Utility from this event? –Unit 1 shut down permanently –Unit 2 and 3 were shut down over two and a half years –Billions of dollars in lost revenues and recovery costs –Utility eventually sold units to Dominion Scream (1893) by Edvard Munch

Loss of Configuration Management at Millstone The impact to the US Industry from this event? On October 9, 1996 the Nuclear Regulatory Commission issued a letter to every Nuclear Utility in the US entitled, "Request For Information Pursuant To 10 CFR ( F ) Regarding Adequacy And Availability Of Design Bases Information"

Loss of Configuration Management at Millstone a) Description of engineering design and configuration control processes, including those that implement 10 CFR 50.59, 10 CFR 50.71(e), and Appendix B to 10 CFR Part 50; (b) Rationale for concluding that design bases requirements are translated into operating, maintenance, and testing procedures; (c) Rationale for concluding that system, structure, and component configuration and performance are consistent with the design bases; (d) Processes for identification of problems and implementation of corrective actions, including actions to determine the extent of problems, action to prevent recurrence, and reporting to NRC; and (e) The overall effectiveness of your current processes and programs in concluding that the configuration of your plant(s) is consistent with the design bases. The NRC requested that each Utility provide:

Loss of Configuration Management at Millstone Dominion response to NRC 50.54(f) Letter: Preparation of design basis documents (DBD). The DBD program, in conjunction with other configuration management activities, establishes the design bases for the plants and serves as a means for maintaining and controlling changes to the plant's design basis. The DBDs will be issued by June 30,1999. Improving the Updated Final Safety Analysis Reports. The content of the Surry and North Anna UFSARs will be validated by October 1998 for consistency with design and operating information. The activity is directly responsive to the incentive offered by the NRC in its October 18, 1996 enforcement policy on departures from the UFSAR. Various format and content enhancements will also be implemented, as appropriate. Improving the Technical Specifications. License amendments will be prepared and submitted in February and April 1999 to convert, respectively, the current North Anna and Surry Technical Specifications from their current form to that of the Improved Technical Specifications (NUREG 1431).

Loss of Configuration Management at Millstone Integrated reviews of design and licensing bases information. Extensive design, licensing, and operating information will be assembled and evaluated by expert, knowledge-based, multi-disciplinary teams utilizing detailed work instructions and robust information systems to demonstrate compliance with each station's design and licensing bases. The integrated reviews are also the primary means by which the project demonstrates that the design and operation of Surry and North Anna are consistent with their UFSARs. Developing information systems. Information systems needed to support the overall project, and to improve the accessibility of design and licensing bases information will be developed and maintained. Improving configuration management. The root cause of departures from the UFSAR will be identified to ensure that the project's corrective actions are effective and comprehensive. Existing change processes will be reviewed to ensure the integrity of the design and licensing bases information is maintained. Independent assessments of project activities will be conducted. Appropriate process-oriented training will be implemented. The Integrated Configuration Management Project is a substantial undertaking initiated by Virginia Power. A new project organization has been established with adequate staffing and resources to accomplish the above tasks in the timeframes required Dominion response to NRC 50.54(f) Letter:

Loss of Configuration Management at Millstone

Impact on the Industry: Dominion response to the NRC Letter cost an estimated $50- million DC Cook Plants shutdown for over 2 years Clinton Plant shutdown for over 2 years Configuration Management improved in the industry