Connecticut River Habitat Restoration: A Significant Population of Rare Mussel Species? and Paul. Boison Northeast Utilities Service Company James W. Athey.

Slides:



Advertisements
Similar presentations
Action Effectiveness Monitoring in the Upper Columbia (Chapter 4) Karl M. Polivka, Pacific Northwest Research Station, USDA Forest Service.
Advertisements

McNary Dam The Dalles DamBonneville Dam John Day Dam Evaluate Spawning of Fall Chinook and Chum Salmon Below the Four Lower-most Columbia River Mainstem.
DISTRIBUTION, STATUS & GENTICS Recovering Freshwater Mussels 2002 Provincial Project Review Characterize Distribution, Status & Genetic Differences in.
UMATILLA RIVER FISH PASSAGE OPERATIONS
Evaluate Spawning of Fall Chinook and Chum Salmon Just Below the Four Lowermost Columbia River Mainstem Dams Project PNNL.
BPA Christina Luzier USFWS
MIKMAQ ECOLOGICAL KNOWLEDGE STUDIES (MEKS) Presentation by - Membertou Geomatics Solutions Mikmaq Ecological Knowledge Studies.
Transport Canada Submission to the Nunavut Impact Review Board Respecting the Meadowbank Gold Project March 2006.
1 Placer County Water Agency Middle Fork American River Project AQ 3 – Aquatic Mollusk Technical Study Report – 2008 March 3, 2009.
Removal of the Marvel Slab reopens section of the Cahaba River Photos Courtesy of Paul Freeman, The Nature Conservancy BEFORE (October 15, 2004) AFTER.
Barge MM-53 Evening Report Highlights: 30 January 2006 Met with one of the two state trustees for Indiana (IDNR, John Davis) and offered briefings to the.
Development and Implementation of Freshwater Species Recovery Efforts in Alabama Paul D. Johnson, Ph.D. Alabama Department of Conservation and Natural.
November 14, 2012 Presented By Jill Winton. BACKGROUND.
Characteristics of Channel Darter Habitat in the Winooski River, Vermont Douglas E. Facey and Shannon M. O ‘Brien Department of Biology Saint Michael’s.
Right Whales and Ships: Can They Coexist? Gerald Leape Vice President for Marine Conservation National Environmental Trust.
2014 Dan River Ash Release-Summary and Update NC Water Resources Congress October 30, 2014.
“Insert” then choose “Picture” – select your picture. Right click your picture and “Send to back”. The world’s leading sustainability consultancy Legislation.
Diadema antillarum populations in Little Cayman Amanda Mortillaro and Allison Farrar.
* Population ageing, few young fish (juveniles) * Endangered as per the Species at Risk Act (SARA) * Now fully protected, it is against the law to have.
The introduction of zebra mussels (ZM) into the Great Lakes and subsequently waters of the Ohio and Mississippi River Valleys, and numerous other waters.
Fecundity Management Strategies. Why Talk About This? As managers, we utilize various methods in managing broodstock collection – we never want to be.
Habitat Use and Substrate Preference of Eastern Sand Darters in Vermont Shannon O’Brien and Douglas E. Facey Department of Biology, Saint Michael’s College.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Saskatchewan River Sturgeon Management Board (SRSMB) What is the SRSMB? It is a group of stakeholders working together with communities to prevent further.
Columbia River salmon : Who (or what) will save them? John Williams Klarälven meeting in Karlstad 9 May 2011.
Integrating Research in the Regular Biology Classroom.
Creating a Large Marine Reserve in the Dry Tortugas Florida: The Role of Science, People, Process, & Persistence Tayrona.org John H. Hunt & William C.
Integrated Status & Trend (ISTM) Project: An overview of establishing, evaluating and modifying monitoring priorities for LCR Steelhead Jeff Rodgers (ODFW)
Watershed assessment, management and restoration of Little Kern golden trout in the Little Kern River, California Acknowledgements Assess the current status.
Jenna Forsyth 12/07/09 Chester Morse Lake, Cedar River Watershed, WA Photo Courtesy of
Name of presenter Date of presentation.  To help preserve and protect Wisconsin’s over 15,000 lakes and 86,000 miles of rivers.
North Cape Scallop Restoration Project Lessons learned from the restoration efforts in Rhode Island’s south county salt ponds Boze Hancock 1, James Turek.
Acoustic Tag Monitoring for Napa River Steelhead at the Napa Plant Site Year One Preliminary Results Presented to Napa Sonoma Marsh Restoration Group.
Results of the 2009 Survey for Inland Heron Colonies in New Jersey & Survey Plans for 2011 Christina Kisiel NJ Division of Fish and Wildlife Endangered.
Steelhead Stock Status Review and ESA Oregon Rhine Messmer ODFW District Staff Oregon Department of Fish and Wildlife Pacific Coast Steelhead Management.
Hydroelectric, Holyoke MA. Hadley Falls Power Station is operated by the Holyoke Gas and Electric Company. The first dam was built across the Connecticut.
Shortnose Sturgeon By: Hackney Deans AP Biology Description of the Shortnose Sturgeon The Shortnose Sturgeon is one of the smallest species of sturgeons,
Claytor Lake Debris Study. Hydro Environmental Services of Kleinschmidt Associates  Shoreline Management Plans (SMP)  Aquatic & Terrestrial Habitat.
Environmental Dredging of Perfluorochemical-Impacted Sediment from a Sensitive Wetland Mark A. Gaetz (3M) Paul Lear (WRScompass)
Timeline Impaired for turbidity on Minnesota’s list of impaired waters (2004) MPCA must complete a study to determine the total maximum daily load (TMDL)
Fish Assemblages of the Wabash River Mark Pyron. Wabash River Fishes 1.Large river 2.High diversity 3.History of human impact 4.Fish assemblages respond.
STATUS UPDATE: FRESHWATER MUSSEL RECONNAISSANCE SURVEY Freshwater Mussel/Benthic Macroinvertebrate TWC Meeting July 26, 2006 Shane Boring, Kleinschmidt.
Lake Maracaibo.
Aquatic Resources Assessment Study Claytor Hydroelectric Project FERC No. 739.
CONSTRUCTION UPDATE Napa Plant Site Central Unit.
Are Kootenai River White Sturgeon Bad Parents or Have We Just Messed Up Their Habitat?
Population Dynamics Population dynamics - the study of the long term changes in population sizes and the factors that cause a change Current focus is.
San Diego’s Watershed and and Examination of Land Cover in Relation to Pollution Tamera Ashcraft 30 November 2000.
Estimating the Volume of Fine-Grained Sediments Behind Four Low-Head Dams, Kalamazoo River, Michigan. In cooperation with the Michigan Department of Environmental.
Reconnecting Fluvial Westslope in Skalkaho Creek Is this working and how do we tell?
Population Ecology. What is a Population? Population - A group of individuals of the same species that live together and interbreed Populations: o Share.
Water Quality Certification for hydropower licensing in Wisconsin.
Results of James Spinymussel Surveys in Central Virginia Anne C. Chazal Field Zoologist VA Dept. Conservation and Recreation – Division of Natural Heritage.
Impact Analysis. Impact Analysis (204) ODOT attempts to avoid, and minimize impacts to the natural environment throughout the PDP process Despite these.
Chelan County Lead Entity Presentation SRFB 2005 Salmon Habitat Grant Cycle.
BC MoE Burbot Recovery Progress 2007 Kootenai Burbot Conservation Strategy.
1 Historic DoD Ocean Disposal Operations, Requirements, and Research Hawaii Robotics Initiative for Underwater Military Munitions Oahu, Hawaii October.
Habitat suitability and availability for rainbow trout Oncorhynchus mykiss in the Canyon Reservoir tailrace Greg Cummings.
Initial Assessment of Habitat Use by Stocked Lake Sturgeon in the Genesee River D. E. DITTMAN 1 and E. C. ZOLLWEG 2 1 Tunison Laboratory of Aquatic Science,
Some Wildlife Census Techniques
Carpenter Environmental Associates, Inc. Ralph E. Huddleston, Jr.
Pallid Sturgeon (Scaphirhynchus Albus)
North Cape Scallop Restoration Project
Using TIF to Support Primary Employers
Age at ocean entry of Snake River Basin fall Chinook and its significance to adult returns prior to summer spill at LGR, LGS, and LMN dams.
Invasive Species Zebra mussels were found at 5 locations in Lake Winnipeg in October Zebra Mussel Dispersal Most likely by Overland transport via.
2.3 Measuring Biotic Components of the system
Study Update Tailrace Slough Use by Anadromous Salmonids
SEPTEMBER 28, 2016 BIOLOGY 10 DM MRS. HAUGHTON
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Presentation transcript:

Connecticut River Habitat Restoration: A Significant Population of Rare Mussel Species? and Paul. Boison Northeast Utilities Service Company James W. Athey Jr., Nathan Henderson, Jennifer Doyle-Breen Metcalf & Eddy Inc.

2 Northeast Utilities Service Company Acting as agent for Holyoke Water Power Company Project Support

3 Presentation Outline Holyoke Coal Tar Project Background Coal Tar Excavation Methods Project Mitigation Measures Methods Results Rare Mussel Species Conclusions

4 Project Background 1990: coal tar leachate was observed discharging into the Hadley Falls tailrace Suspected source: Holyoke Gas Works, an historic manufactured gas plant ( ) Habitat for federally endangered shortnose sturgeon and protected mussel species

5 Coal Tar Remediation 9 coal tar patch locations in Site Portion 1 (north) 2 coal tar patch locations in Site Portion 2 (south) NOAA, MA DEP mandated remediation Remediation plan developed by Metcalf & Eddy in 2001 Removal work conducted in 2002, 2003, and 2005 Dry and wet excavation methods

6 Wet Excavation Excavator transported to site on a barge Containment area enclosed with siltation boom Excavated material loaded onto skiff and transported to shore for off-site disposal

7 Dry Excavation Containment area enclosed with portable cofferdam Work area dewatered Excavated material transported off site for disposal

8 Limited time frame for construction Silt curtains and portable cofferdam structures Water quality sampling program Removal of fish and mussels within containment areas Construction Mitigation Measures

9 Methods Subsurface exploration for juvenile rare mussels Mark mussels prior to relocation Relocate mussels to relocation areas Recapture surveys Establish relocation areas (outside of work areas) Mussel removal by SCUBA diving and snorkeling

10 Buffers and Mussel Relocation Areas Establish buffer areas –2002: 100 feet on all sides –2003: 100 feet downstream / 20 feet elsewhere –2005: 50 feet downstream / 20 feet elsewhere Establish relocation areas –Surveyed opposite side of river for suitable habitat –Six relocation areas identified

11 Mussel Removal After work areas were identified (60 feet from coal tar edge), buffer areas marked with anchored buoys Mussel removal between weighted transect lines – : All mussels –2005: All rare species and common 1.5” and greater (NHESP requested) Collected, counted and identified all mussel species

12 Subsurface Exploration Additional requirement by NHESP Attempt to collect juvenile rare mussels 6 mm screen Dedicated areas Randomly selected areas

13 Mark-Recapture Survey All Mussels –Krylon paint mark –2-part epoxy –One/two year recapture survey Goal: Determine the general success of the relocation effort 2005 Only Rare Mussels –Numbered tags –One week and one month recapture surveys

14 Mussel Relocation Results Four species collected in study area (From left to right) –Tidewater mucket (Ligumia ochracea)- MA Species of Special Concern –Yellow lampmussel (Lampsilis cariosa)- MA Endangered –Eastern Elliptio (Elliptio complanata)- Common –Alewife floater (Anodonta implicata) (bottom)

15 Mussel Relocation Results (Cont.) 2005 subsurface exploration: -No juvenile rare mussel species collected -1 Adult Tidewater mucket -415 Adult Elliptio/526 Juvenile Elliptio

16 Example of Rare Mussel Distribution

17 Mark-Recapture Survey 2002 – 2003 Results: Over 15,000 mussels marked 868 recaptured in 2004 Up to 88% survival for Elliptio No rare mussels recaptured 2005 Results: One week survey – approx 38% mussels found One month survey – approx 10% mussels found Two mortalities discovered (one tidewater mucket and one yellow lampmussel) – cause undetermined

18 Rare Mussel Species Well-established populations of yellow lampmussels and tidewater muckets Density of rare mussel species is encouraging –Sandy bottom habitat (0.09/100m 2 ) –Cobble bottom habitat (0.02/100m 2 ) Extrapolated population over 4-mile stretch of river 87 to 4,000 lampmussels Previously only two known sighting of lampmussels below Holyoke Dam

19 Rare Mussel Species Populations are reproducing Documented reproductive behavior Water quality and habitat improving in Connecticut River Due to immense size of Connecticut River and potential available habitat, likely substantial populations along other sections of the river Recently documented populations above the Holyoke Dam and further downriver

20 Conclusions Mussel relocation was successful at removing 26,000 mussels from 2002 to 2005 Documented significant populations of rare mussel species Mussel densities are variable but rare mussel densities generally higher in coarse sandy substrate Despite short-term disruption from coal tar excavation, mitigation measures successful, which furthers the overall project goal of long-term aquatic habitat restoration

21 Comments and Questions