ASHRAE Guideline 0-2005 The Commissioning Process Building Commissioning Association Northeast Chapter Thomas Anderson, CCP.

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

Commissioning Standards CSA Z320 CSA Z318 ASHRAE 202
Software Quality Assurance Plan
SBA Unit 8B: Building Commissioning Prepared By: David J Ellner, PE.
Commissioning Changes & Requirements for LEED v4
Commissioning. What is Commissioning? And the word Authority?
What Constitutes a Quality Commissioning Job?. Agenda Preconstruction Services –Brian Toevs, PE Construction Services –Rusty Ross, PE, LEED TM, CxA Client.
1100 Superior Ave., Suite Wolf Ledges Parkway, Suite West Third Avenue Cleveland, OH 44114Akron, OH 44311Columbus, OH
Commissioning: The Most Important Component of LEED ® by Rick Miller, PE, LEED AP RNM Engineering, Inc. San Luis Obispo, CA.
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
Building Enclosure Commissioning (BECx): Practical Project Implementation.
Building Commissioning
Project Work and Administration
WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto.
Project Delivery Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
Lab 08: AEV Design Analysis Tool Advanced Energy Vehicle (AEV)
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
Commissioning Presentation For Society of American Military Engineers (SAME) George Washington University Chapter February 25, 2011.
PMI Bluegrass May 2012 Lunch Presentation: Commissioning Building Systems Commissioning for Project Managers.
Implementing Commissioning and the CxP for DOE Super ESPC Projects Draft Guideline Review Chuck Dorgan, P.E., Ph.D., CxAP Roger Johnson.
The Future of Commissioning for Sustained Building Performance Birmingham, AL SERBCA Fall Conference Proposed LEED Requirements for Commissioning.
INFORMATION SYSTEM APPLICATIONS System Development Life Cycle.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Building Commissioning: It’s a Process For a Reason Presented by Rick Scivally CHFM, CHSP, CBCP, LEED AP.
The 5 th Annual Conference on Total Building Commissioning 2009 Commissioning Changes in LEED 2009 Paul McCown, PE, CxA, LEED AP, CEM SSRCx, LLC.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Commissioning for Sustained Building Performance Building Performance Birmingham, AL Marriott 9/29/11 Introduction to Commissioning and Retro-Commissioning.
Kristin Heinemeier, Ph.D., P.E. Technical Director Brooks Energy & Sustainability Lab Texas Engineering Experiment Station Texas A&M University System.
THE COMMISSIONING PROCESS AND ASHRAE STANDARD 202
Dan Frasier, PE, CCP Successful Turnover of New and Renovation Construction Projects Successful Turnover of New and Renovation Construction.
High Performance Building Standard Regulations An Introduction.
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
2 of 45 WELCOME TO BUILDING COMMISSIONING 101 Building Commissioning Association.
UDOT I-15 The Point Design-Build Project
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
Hydro Oil & Energy TEMADAG NSP 18 FEBRUAR Fleksibilitet i prosjektgjennomføring.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
Building Commissioning: Cx 101 Brock Graham, Gilbane Building Co. Michael Gannon, BVH Integrated Services November 15, 2010.
Birmingham, AL SERBCA Fall Conference Presented by: Gary Sweatt, CxA, QCxP.
Chapter 15 Introduction to Systems Development. Learning Objectives Learn how information systems are developed Understand importance of managing SD process.
Lab 07: AEV Design Analysis Tool Advanced Energy Vehicle (AEV)
Systems Analysis and Design in a Changing World, Fourth Edition
Halcom Consulting llc Sustainability Consulting & Commissioning 2917 Carlisle NE Suite 109 Albuquerque, New Mexico p f
How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Fundamentals of LEED v4 for
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.
Implementing the CxP for ESPC Projects – Maximizing Benefits Chuck Dorgan, P.E., Ph.D. Roger Johnson.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Commissioning HVAC Systems: Lessons learned throughout
the Basic Commissioning (Cx) Process
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
CxA at Georgia Tech TRAINING OUTLINE Epsten Group, Darren Draper
Introduction to LEED Building Commissioning
UW T2O = Transition to (Sustainable) Occupancies
Software Verification and Validation
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
AABC Commissioning Group - CxA Workshop Las Vegas, Nevada – MGM Grand
LEED BD+C – Integrative Process
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
Controlling Project Cost and Schedule
Creating Communications with a Team
Presentation transcript:

ASHRAE Guideline The Commissioning Process Building Commissioning Association Northeast Chapter Thomas Anderson, CCP

Purpose of Guideline  Describe the Cx Process to verify a facility meets the Owner’s Project Requirements

Utilization  Guideline Describes the “Process”  Technical Guidelines Detail Technical Requirements

Guideline The Cx Process  ASHRAE Guideline 1-200X HVACR Cx Process (Tech Requirements)  NIBS Guidelines 2-200X through X Requirements Other Technical Cx Volumes Roofing, Lighting, Plumbing, Life Safety, Etc.

Pre Design Phase  Develop Owner’s Project Requirements (OPR)  Cx Scope & Budget  Develop Initial Cx Plan

Owner’s Project Requirements  Forms the basis from which all decisions are made… Design Construction Acceptance Operational Decisions

Owner’s Project Requirements  Primary Tool for Benchmarking Success and Quality At all Phases of Project Delivery Throughout the Life of Facility

Owner’s Project Requirements  Owner’s Objectives for a New Facility  Guidance for Design Team & Others Not developed by Design Team

OPR Should Include…  Schedule & Budget  Cx Scope & Budget  User Requirements  Energy Efficiency Goals  Applicable Codes & Standards  Etc.

An OPR is Dynamic…  Evolves through each Phase  Updated to Reflect Current Project Requirements Feasibility Budget Limitations

Design Phase Cx Tasks  Verify Basis of Design (BoD) with OPR  Update Cx Plan  Defining Training Requirements  Perform Focused Design Reviews Developed by Design Team CxA Verifies BoD Conforms to OPR Systems Manual

Basis of Design  Basis of Design (BoD) Conveys Design Assumptions that Fulfill OPR Intent Developed by Design Team Updated throughout Design Phase

Basis of Design Includes  System Selection Reasoning  Assumptions Narrative of System Selection & Reasoning Environmental Conditions Load Calcs & Sizing Codes Operations

Systems Manual  Information Needed to… Understand Systems Operate Maintain

Systems Manual Includes  Index of Systems Manual  Executive Summary  OPR  BoD  O&M Manuals  Cx Process Report

Construction Phase  Verify Systems & Assemblies Conform to OPR  Submittal Review (Spot Check)  Develop Test Docs  Witness Tests  Verify Training  Update Systems Manual (OPR, BoD, Etc.)

Occupancy & Operations Phase  Begins at Substantial Completion  Continue through end of Contractual/Warranty Period  Ideally, Continues through Life of the Facility

Occupancy & Operations Phase  CxA Assists in Problem Solving  Guidance on O&M to Achieve OPR  Seasonal Testing  Verify Training  Systems Manual Update  Cx Report