Muon Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab Outline Muon Collider Concept Muon Accelerator.

Slides:



Advertisements
Similar presentations
The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
Advertisements

Beam Test of a High-Pressure GH 2 -Filled RF Cavity (for efficient muon beam cooling for a MC or NF, since the low-Z ionization energy-loss absorber and.
Kirk McDonald Monday, 28th May Report of the International Working Group on Muon Beamlines Bruno Autin, Roberto Cappi, Rob Edgecock, Kirk McDonald,
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
MUON COLLIDER R&D Steve Geer Accelerator Physics Center Fermi National Accelerator Laboratory Accelerator Seminar SLAC., March 24, 2011   Muon.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
MUON COLLIDER: R&D Status & Opportunities for Participation FNAL, February 24, 2011   1.Motivation & OverviewSteve Geer 2.Accelerator R&DVladimir.
MCTF Michael Lamm MUTAC 5-Year Plan Review 22 August Magnet R&D for Muon Accelerator R&D Program Goals Proposed Studies Preliminary Effort and Cost.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
Fast TOF for Muon Cooling Experiments Robert Abrams Muons, inc.
Muon Collider Experiments Overview of detector requirements and limitations R. Lipton, Fermilab Why contemplate a Muon Collider? Because of the reduced.
Institutional Logo Here Harold G. Kirk DOE Review of MAP (FNAL August 29-31, 2012)1 The Front End Harold Kirk Brookhaven National Lab August 30, 2012.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Future Accelerators at the energy frontier Peter Hansen february 2010 University of Copenhagen.
The EMMA Project Rob Edgecock STFC Rutherford Appleton Laboratory & Huddersfield University.
MAP Overview Steve Geer Accelerator Physics Center Fermi National Accelerator Laboratory MAP Winter Meeting JLab, February 28, 2011  
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
Particle Production in the MICE Beam Line Particle Accelerator Conference, May 2009, Vancouver, Canada Particle Production in the MICE Beam Line Jean-Sebastien.
Steve Geer OsC RAL 21 June, Muon Accelerator Program MUON COLLIDER & NEUTRINO FACTORY R&D in the U.S.  
1 Higgs : keV precision and CP violation W. J. Murray RAL.
Front-End Design Overview Diktys Stratakis Brookhaven National Laboratory February 19, 2014 D. Stratakis | DOE Review of MAP (FNAL, February 19-20, 2014)1.
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
1 Tunnel implementations (laser straight) Central Injector complex.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
1 Muon Collider Backgrounds Steve Geer Fermilab Steve Geer MC Detector & Physics DOE June 24, 2009.
March 2, 2011 TJRPhysics Processes Missing from our Current Simulation Tools 1 Tom Roberts Muons, Inc. This is the current list − Please help us to complete.
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
Muon Colliders: Progress and Plans Steve Geer 1.Introduction 2.Muon Collider Ingredients 3.Comaparison with Neutrino Factories 4.Cooling Channel Design.
MCTF Steve Geer AAC Meeting May MUON COLLIDER & NEUTRINO FACTORY R&D AT FERMILAB Overview of organization, budgets, and plans.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Institutional Logo Here July 11, 2012 Muon Accelerator Program Advisory Committee Review (FNAL July 11-13, 2012)1 The Front End.
LCWS11 – Tracking Performance at CLIC_ILD/SiD Michael Hauschild - CERN, 27-Sep-2011, page 1 Tracking Performance in CLIC_ILD and CLIC_SiD e + e –  H +
Muon Collider Pier Oddone, WIN09, Perugia September 15, 2009.
Muon Collider: Plans, Progress and Challenges Ronald Lipton, Fermilab Outline Muon Collider Concept Muon Accelerator Program Machine Detector Interface.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
Machine-Detector Interface Nikolai Mokhov Fermilab February 19, 2014.
Muon Collider Physics and Detectors You have heard about the muon collider accelerator initiatives – these need to be informed by the physics needs and.
Backgrounds in the Muon Collider Experiments Adam Para, Fermilab MAP Collaboration Meeting, SLAC, March 8, 2012.
Simulation Plan Discussion What are the priorities? – Higgs Factory? – 3-6 TeV energy frontier machine? What detector variants? – Basic detector would.
Katsuya Yonehara Accelerator Physics Center, Fermilab On behalf of the Muon Accelerator Program 5/22/121International Particle Accelerator Conference,
MCS meeting 20/11/2015 S. Guiducci. Introduction Yesterday meeting has shown an interest in a large physics community to incremental development of muon.
Ionization Cooling for Muon Accelerators Prepared by Robert Ryne Presented by Jean-Pierre Delahaye MICE Optics Review Jan, 2016 RAL.
Fermilab: Introduction Young-Kee Kim DOE KA12 (Electron Research)Review June 22-23, 2010.
Muon Accelerator Program: Overview & Directions Mark Palmer June 19, 2013.
Detector Prospects for the Muon Collider Tracking Ronald Lipton - Fermilab Can we perform experiments in the harsh background environment of the Muon Collider?
Muon Collider Physics and Detector Status Ronald Lipton, Fermilab Outline Physics with a Muon Collider Background rejection Detector tradeoffs Future Plans.
Muon Collider Higgs Factory Physics and Detector Studies R. Lipton, Fermilab A Muon Collider is uniquely capable of producing Higgs bosons in the s channel.
KA12 Marcel Demarteau Fermilab DOE Site Visit August 23,
Research and development toward a future Muon Collider Katsuya Yonehara Accelerator Physics Center, Fermilab On behalf of Muon Accelerator Program Draft.
FCC-ee Interaction Region design
Physics and Detectors for a Muon Collider
US strategy and plans for future Lepton Colliders
Future Muon Colliders: A Perspective
M. Migliorati, C. Vaccarezza INFN - LNF
m+ m- n MAP Overview Steve Geer Accelerator Physics Center
Physics and Detectors for a Muon Collider
Why Study Electron Clouds? Methods and Tools to Study Electron Clouds
Accelerator R&D for Future Neutrino Projects
Muon Accelerator Program - MAP
Physics Processes Missing from our Current Simulation Tools
m+ m- n Muon Collider R&D MUON COLLIDER & NEUTRINO FACTORY R&D
Machine-Detector Interface
Muon Collider Magnet Technologies/Challenges
Presentation transcript:

Muon Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab Outline Muon Collider Concept Muon Accelerator Program status Physics Environment Machine Detector Interface Studies Physics and detector studies Future plans and outlook

Muon Collider Motivation A muon collider is an attractive multi-TeV lepton collider option because muons don’t radiate as readily as electrons (m  / m e ~ 207): Compact Fits on laboratory site Multi-pass acceleration Cost effective operation & construction Multipass collisions in a ring (~1000 turns) Relaxed emittance requirements & hence relaxed tolerances A 4 TeV Muon Collider would fit on the Fermilab Site

Challenges Muons are produced as tertiary particles. To make enough of them we must start with a MW scale proton source & target facility. Muons decay  everything must be done fast and we must deal with the decay electrons. A 1.5 TeV muon travels 9,300 km in one lifetime (~2000 turns in MuCol ring). Muons are born within a large 6D phase-space. For a MC we must cool them by O(10 6 ) before they decay  New cooling techniques (ionization cooling) must be demonstrated, and it requires components with demanding performance (NCRF in magnetic channel, high field solenoids.) After cooling, beams still have relatively large emittance

Muon Collider Schematic Proton source: Example: upgraded PROJECT X (4 MW, 2±1 ns long bunches) muons per year that fit within the acceptance of an accelerator:   N =6000  m  //N =25 mm √s = 3 TeV Circumference = 4.5km L = 3×10 34 cm -2 s -1  /bunch = 2x10 12  (p)/p = 0.1%   N = 25  m,  //N =70 mm  * = 5mm Rep Rate = 12Hz

Neutrino Factory c.f. Muon Collider In present MC baseline design, Front End is same as for NF NEUTRINO FACTORY MUON COLLIDER

MAP Oct 1, 2009 letter from DOE-OHEP to FNAL Director: “Our office believes that it is timely to mount a concerted national R&D program that addresses the technical challenges and feasibility issues relevant to the capabilities needed for future Neutrino Factory and multi-TeV Muon Collider facilities....” Letter requested a new organization for a national Muon Collider & Neutrino Factory R&D program, hosted at FNAL. Muon Accelerator Program organization is now in place & functioning: >200 participants from 15 institutions:  ANL, BNL, FNAL, JLab, LBNL, ORNL, SLAC, Cornell, IIT, Princeton, UCB, UCLA, UCR, U-Miss, U. Chicago  MAP R&D proposal reviewed August 2010 … committee concluded that the “proposed work was very important to the field of high energy physics.”

Map Organization Level 0 Level 1

MAP Organization – L1 & L2 L2 assignments - FNAL; 5 people - Other Labs: 3 people - Universities: 3 people - SBIR Companies: 1 person “Level 1”

Fermilab Contributions Exploits Fermilab’s expertise and assets. Tackle the most critical and hardest problems. Exploit Fermilab’s unique testing capabilities Significant activities: Organization & leadership (Level 0, Level 1, Level 2) Front- end, cooling channel, & Collider Ring design studies. Machine –Detector Interface studies (interfacing to the Muon Collider physics/detector activities, including MARS background simulations). Ionization cooling channel component development and testing, including magnet and RF studies.

Muon Accelerator – Merit Merit-Proof-of-principle demonstration of a liquid Hg jet target in high-field solenoid CERN PS in Fall Demonstrated a 20m/s liquid Hg jet injected into a 15 T solenoid, & hit with a suitably intense beam (115 KJ / pulse !). Results suggest this technology OK for beam powers up to 8 MW with rep. rate of 70Hz ! Hg jet in a 15 T solenoid Measured disruption length = 28 cm 1 cm

Cooling Channel Design Perhaps the most challenging piece of MC design. Requires ideas & detailed design work to identify a set of hardware that can, if developed, do the job. Important FNAL contributors: Y. Alexahin, K. Yonehara, V. Balbekov

Muon Accelerator - Mucool MuCool Test Area Built at end of FNAL Linac for ionization cooling component testing 5 T magnet, RF power at 805 MHz & 201 MHz, clean room, LH 2 handling capability, 400 MeV beam from linac. Muon cooling channel requires NCRF operating in a magnetic channel. MTA measurements show max. RF gradient reduced in magnetic field. Several innovative ideas on how to mitigate this → critical R&D at MTA (FNAL contributors: A. Bross, A. Moretti, Y. Torun, K. Yonehara, M. Popovic, M. Jana, A. Tollestrup) First beam in MTA 28 February 2011 High Pressure RF Cavity (FNAL & Muons Inc.)

Muon Accelerator - MICE Muon Ionization Cooling Experiment (MICE) Tests short cooling section, in muon beam, measuring the muons before & after the cooling section. one at a time. Learn about cost, complexity, & engineering issues associated with cooling channels. Vary RF, solenoid & absorber parameters & demonstrate ability to simulate response of muons FNAL Contributors: A. Bross, Y. Torun, M. Popovic, V. Kashikhin To be completed ~2014 Spectro- meter Cooling section Spectro- meter

Muon Accelerator – Front end Design With a 4MW proton source, this will enable O(10 21 ) muons/year to be produced, bunched, cooled & fit within the acceptance of an accelerator. (Neuffler)

Muon Accelerator – Ring and Magnet Lattice design for 1.5 TeV Collider exists, & 3 TeV ring progressing (Y. Alexahin, E. Gianfelice-Wendt) Ring magnet design studies, including radiation & thermal management, progressing. Requires lattice, magnet & MARS simulation expertise Have studied open mid-plane magnet design (radiation & heat loads, field non-uniformity & affect on lattice performance) → looks OK. More engineering studies needed. (N. Mokhov, S. Striganov, Y. Alexahin, V.V. Kashikhin, I. Novitski, A. Zlobin) MARS energy deposition map for 1.5 TeV collider dipole

Physics and Detector Although there is a revived muon accelerator effort, there has been little corresponding detector effort which could study the large beam-related backgrounds with modern simulation tools and detector technologies Beginning such an effort is crucial to understanding the physics reach of such a device and beginning a program to explore detector development for the muon collider environment. It is also crucial for community buy-in We hope to commission this effort at the Muon Collider 2011 meeting in Telluride next week.

Physics Environment Narrow beam energy spread Precision scan Kinematic constraints 2 Detectors  T bunch ~ 10  s Lots of time for readout Backgrounds don’t pile up (m  /m e ) 2 = ~40000 Enhanced s-channel rates for Higgs-like particles Multi-TeV lepton collider cross sections dominated by fusion Beamstrahlung in any e+e- collider  E/E   2 (Eichten)

Luminosity Goals for High Energy Muon Collider L~10 34 at 3 TeV provides ~965 events/unit R Much of the yield is in fusion reactions Need to resolve W, Z jets Large missing energies Physics environment similar to CLIC with lower beamstrahlung, higher decay backgrounds, lower polarization and central 10 degrees obscured by “the nose” (Eichten)

It’s All About the Background Experiments at the Muon Collider will endure very harsh background environments. The first order of business in evaluating physics capabilities is to understand and simulate the machine backgrounds. 1.IP  +  - collisions – real physics: Production x-section 1.34 pb at √S = 1.5 TeV. 2.IP incoherent e + e - pair production: of 3×10 4 electron pairs per bunch crossing 3.Muon beam decays: For 0.75-TeV muon beam of 2x10 12, 4.28x10 5 dec/m per bunch crossing, or 1.28x10 10 dec/m/s for 2 beams; 0.5 kW/m. 4.Beam halo: Beam loss at limiting apertures; severe, can be taken care of by an appropriate collimation system far upstream of IP.

The Nose Ivan Yakovlevitch … glanced into the roll's middle. To his intense surprise he saw something glimmering there.. He stuck in his fingers, and pulled out — a nose!...A nose! Sure enough a nose! Yes, and one familiar to him, somehow! Oh, horror spread upon his features! - “The Nose” Gogol (from google) A 10 degree tungsten/borated poly “noise”surrounds the beam pipe to absorb the e-m backgrounds x background reduction.

MDI Model W  = 10 o 6 < z < 600 cm x:z = 1:17 BCH 2 Q1 There has been excellent progress in modeling the intense decay backgrounds. Large weights have been removed and accurate background simulations are available from MARS and G4beamline

Neutron Background Non-ionizing background ~ LHC

Energy Distributions 164 TeV5.8 TeV92 TeV 172 TeV12 TeV

Detector Simulation Status A small group from Lecce has been working on Muon Collider simulations in the ILCROOT framework for about a year First studies using full GEANT simulation of a detector with MARS backgrounds imbedded First studies of calorimeter and tracker background with timing cuts A detector simulation using LCSIM (SLAC) has been implemented and first studies are beginning. This is complementary to the ILCROOT studies – the detector is more “generic” and the simulation is more flexible. We have not yet simulated full background events in this framework

Detector Models based on ILC (SiD, ILD, 4 Th ) LCSIM Detector ModelILCROOT Detector Model

ILCROOT Background Studies (Dual Readout Calorimeter) Central barrel 4x4 cm em+had cell (DiBenedetto)

LCSIM Background Studies An example of background reduction utilizing timing ECal: Tungsten, 10 x 1cm layers 1x1x1cm cells Background 1ns timing cut No timing Cut 10 GeV e EM cal layer Reduction: EM – 23% of energy survives a 1 ns timing cut 6% of that energy is beyond 1 st EM cell Hadron- 0.95% of energy survives a 1 ns cut

Track Information (LCSIM) Tracking can benefit from precise timing, low occupancy in a pixelated silicon detector. Background Single Muon  T +/- 5 ns  E/  X  T +/- 5 ns TT  E/  X

ILCSIM Tracking Studies Dominated by neutrons and photons This is not energy weighted, many are soft tracks  E/  X and IP (3cm) Cut 2110 tracks TOF cut at 3 ns 41 tracks (Terentiev) (Mazzacane) Recently demonstrated track finding in a full background event Cuts on IP, DEDX, and TOF (3ns)

Accomplishments in the last Year Introduced an SiD-like Muon Collider detector into the LCSIM framework Provided LCSIM simulation infrastructure at Fermilab Incorporated MARS backgrounds into LCSIM Initiated physics studies by university and laboratory groups based on SiD/LCSIM model. Detailed background studies Hit rates in various regions of the tracker Energy deposit in various regions and depths in the calorimeter Time dependence of tracker and calorimeter hits Studies of single tracks with backgrounds Much of these studies were by the Lecce group in collaboration with the FNAL MDI group

Collaboration on Lepton Collider R&D Laboratory “White Paper” on Lepton Colliders last summer established the goals of future efforts: Establish the requirements of detector systems so the physics can be extracted, taking into account the very different operating conditions at each machine. Provide feedback to the machine design to further optimize the physics potential. Propose necessary detector and other R&D to verify detector technologies. Compare the physics potential of these machines and carry out a cost‐benefit analysis. Coordinate the detector and physics program. First joint effort was to submit a unified proposal to the “Collider Detector R&D” program (program not funded in FY2011) Included support for Muon Collider simulation at FNAL and SLAC Muon Collider detector R&D would come later

Plans Summer 2011 – Fall 2011 Parameterize backgrounds to enable faster physics simulation Initial physics study including full background simulation Physics studies using parameterized background Iterate both the shielding and detector designs based on results of simulation studies Define detector requirements, and identify needed detector R&D, begin studies to establish a long-term simulation and analysis environment Detector R&D + simulation studies to establish likely detector performance Define overall detector design, complete studies for the design feasibility report.

Muon Collider Workshop at Telluride next week We hope the workshop will provide a venue to introduce the community to the current state of physics and background simulations and serve as an entry point for more extensive university collaboration on Muon Collider Physics We hope to come out of the workshop with a specific set of short and long term goals for physics and detector studies. We aim for demonstration of the physics capability of the machine on the same time scale as the MAP accelerator program goals for accelerator feasibility studies (~FY16)

Manpower We had hoped to receive some funding for computing support through the KA15 detector R&D program. That has been delayed until next FY. The Lecce (ILCROOT) group has contributed a great deal, but are likely to dissipate without strong FNAL support. Work at NIU and FNAL is beginning using the LCSIM framework provided by SLAC. More work needs to be done to build up momentum for this effort. We hope to make significant progress at Telluride, but we will need an increased level of support to mount a sustained effort

Conclusions Muon Accelerator Project is up and running – making substantial progress We are beginning a renewed physics and detector program We now have a strong foundation – reliable MARS simulation of backgrounds integrated into GEANT-based detector models. We hope to build on that foundation at Telluride an beyond and provide studies comparable to those undertaken for CLIC and ILC that will provide the HEP community with a basis for informed decisions in the future.