ROOF MATE Step-By-Step Application Over BOARD-STOCK INSULATION

Slides:



Advertisements
Similar presentations
Wetsuit Roofing and Waterproofing
Advertisements

FRIGI-TECH REFLECTIVE ROOF COATINGS. MAIN BENIFITS INSULATES – Outperforms 7 of fiberglass insulation. Keeps interiors cooler and more comfortable. CUTS.
Presentation Overview
Copyright , Facade Works Inc - Drained/Back-Ventilated Rain Screen System.
Unit 55 Roof Finish Roof Overhangs and Cornices • Open Cornices • Closed Cornices • Cornice Soffit Systems • Covering Roofs • Asphalt Shingles • Wood Shingles.
ENERGY CONSERVATION: HOME WRAP, INSULATION, AND STOPPING AIR LEAKS.
ENERGY STAR Qualified Homes
NGfL CYMRU GCaD FLOOR COVERINGS.
DAY ONE - STEP ONE - Preparation Pure Crete is added to a water truck with a spray bar located at the rear of the truck at a ratio of one gallon to 2000.
Chapter 16 Roofing. First line of defense against the weather Precipitation (Rain, snow) Sun Thermal Transmission Subjected to extreme heat and cold Surface.
Background Surface Treatments
Showroom and Design Center 5300 E Arrowhead Parkway Sioux Falls, SD
SHOTCRETING K.V.SUBBA RAO.
2313 W Sam Houston Parkway N Suite 105 Houston, Texas ROK Shield Application Instructions ROK Shield is a non-toxic,
NERI TORCH TRAINING PART VII PRACTICAL EXAM PREPARATION.
Ground-Supported Slabs • Exterior Flatwork
Common problems you will find in roofing systems Common problems you will find in roofing systems.
Building Code – Flashing Changes & Challenges Builder Breakfast and Luncheon Series Presented by:
CHAPTER 9 Thermal & Moisture Protection
Building Owners Roofing System Inspection and Maintenance.
Fibered Asphalt Emulsion- 10-Year Warranty System.
Foundations of Real Estate Management
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
Concrete Specifications
Unit 3 Clothing Care and Laundry
What Is EIFS Exterior Insulation and Finish Systems (EIFS) is a multi-layered exterior wall system that is composed of foam board insulation that.
Foundation Systems.
Condensation Piping and Installation Drain Pans
INSTALLATION INSTRUCTIONS FOR GERARD METAL SHINGLES
Module INS-01Module TAP01 COMMERCIAL ROOFING Tapered Insulation Systems.
Firestone Building Products EPDM Training. Membrane Attachment.
 Complete failure of the roof membrane, as stated by GAF consultant from Trinity ERD  Elastomeric roof material did not completely adhere.
ROOF MATE Step-By-Step Application Over MODIFIED BITUMEN ROOFING Master Guide Specifications List of materials: ROOF MATE WHITE ROOF MATE BASECOAT ROOF.
EXISTING ROOF TOP UNIT. PROVIDE NEW FLASHING AROUND STRUCTURAL PIPE SUPPORTS. 4 2 EXISTING ACCESS LADDER. RE-ADHERE EXISTING BOOT AND SEAM SEAL OVER FLAT.
Tie-Off Points and Anchors Presented by Scott Pipicelli – HC&A.
SPECIFICATIONS FOR ROOFING ROOF DRAINAGE Adequate drainage fall should be specified at no less than the industry minimum requirement or at least 1.5% without.
CONSTRUCTING A FIVE CABIN LATRINE
ROOF MATE Step-By-Step Application Over METAL ROOFING Master Guide Specifications List of Materials: ROOF MATE WHITE ROOF MATE BASECOAT ROOF MATE BUTTER.
The sand filter has to be moved from this location. The embankment cross section used in the slope stability analysis did not include the sand filter.
Fluid/Liquid Applied Roofing Richard Tran. Session Outline 1.Effective Uses and Advantages → 2.Construction Sequence/Environmental Installation and Storage.
ROOF MATE Step-By-Step Application Over EPDM ROOFING Master Guide Specifications List of Materials: ROOF MATE WHITE ROOF MATE LIGHT GRAY ROOF MATE BUTTER.
Master Guide Specifications List of materials: ROOF MATE WHITE ROOF MATE BASECOAT ROOF MATE BUTTER GRADE ROOF MATE MESH Optional materials: UCC (United.
Products & Accessories Details System Highlights Hands On
ROOF MATE Step-By-Step Application Over CONCRETE ROOFING
CON 4003 Construction Estimating Prof R. V. Locurcio.
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
TRENTON Casing Filler Presentation
TPO Membrane attachment and Base Tie-In Adhered System System Design Adapts Easily To Unusual Roof Profiles or Slopes System Design Is Easy To "Beef.
Firestone Building Products
Edward Colligon Doug Watson Brett Reisker Opeyemi Ositelu Hong Jie Chen.
TABS II Contractor Installation CD. TABS II Before getting started, please read & familiarize yourself with the Tabs Wall Systems Estimating & Installation.
Firestone Building Products EPDM Training – Termination and Miscellaneous.
1. 2 Routinely used by athletic trainers Used to minimize swelling, provide support to injured areas and prevent injury While techniques are not difficult.
Steep Slope Roofing Systems. Based on the 2007 C.B.C. Presented by Oscar Davalos.
TOTAL PROTECTION. TOTAL CONFIDENCE. Owens Corning ® Total Protection Roofing System ®^
COMPACT SHEETING ETERNAL MARBLE. INTRODUCTION  Eternal is a compact heterogeneous vinyl floor covering with a calendared backing in 2m wide sheeting.
COMPACT SHEETING SURESTEP STAR. INTRODUCTION  Surestep is a 2m wide glass fibre-mat reinforced compact antistatic vinyl floor covering, featuring a 0.7mm.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Leads Institute of Technology & Engineering
Roof Insulation Adhesives: Garland’s Insul-Lock® II, Insul-Lock HR & Insul-Lock E HR Systems
Foundation – jay Desai.
Garland’s White-Knight® Plus/ White-Stallion® Plus System
Linoleum Installation System
The Elastizell Advantage For Quality Low Density
Liquid Flashing: Garland’s Tuff-Flash™ System
CPR™ System.
HOTEL BUILDINGS INTRODUCTION ● Buildings are structures that serve as shelter for man, his properties and activities. ● They must be properly planned,
II REVIEW.
TRENTON Casing Filler Presentation
Application Issues & Solutions
Presentation transcript:

ROOF MATE Step-By-Step Application Over BOARD-STOCK INSULATION List of Materials: ROOF MATE WHITE ROOF MATE BASECOAT ROOF MATE BUTTER GRADE ROOF MATE MESH ROOF MATE FABRIC Optional Materials: UCC (United Cleaning Concentrate) WALL-BOND RHINO TOP ACRYSHEEN Master Guide Specification <BACK MAIN MENU NEXT> EXIT

<BACK MAIN MENU NEXT> EXIT ROOF MATE Step-By-Step Over BOARD-STOCK INSULATION STEP 1 – Cleaning All roof surfaces must be clean, dry, structurally sound, stable, well secured and free of excessive ponding water. Inspect condition of flashing details, penetrations, roof mounted equipment, curbs, walls, parapets, drains and roof edges to ensure that they are sound. Ensure that the roof deck has positive slope to drain and that moisture content of the existing substrate, insulation and deck does not exceed 15%. <BACK MAIN MENU NEXT> EXIT

<BACK MAIN MENU NEXT> EXIT ROOF MATE Step-By-Step Over BOARD-STOCK INSULATION STEP 2 – Preparation Remove all loose gravel, dirt and debris to smooth the surface prior to application of the board-stock insulation. Care should be taken to preserve the integrity of the existing roof substrate whenever possible. Any unsound areas in the roof deck, insulation or flashings must be repaired or replaced. All blisters, delaminations, wrinkles and loose areas must either be cut away to sound substrate and removed, or cut open and nailed flat to the deck. <BACK MAIN MENU NEXT> EXIT

<BACK MAIN MENU NEXT> EXIT ROOF MATE Step-By-Step Over BOARD-STOCK INSULATION STEP 3 – Board-Stock Installation Mechanically fasten or adhere the board-stock insulation (EPS, urethane or polyisocyanurate) to the roof deck following the manufacturer’s instructions. Wall-Bond 70 or 90, Instra-Stik or equivalent may be used for adhering the panels to the substrate. Taper the insulation panels around drains and scuppers, and add crickets or additional insulation as necessary to facilitate proper drainage of water from the roof. <BACK MAIN MENU NEXT> EXIT

<BACK MAIN MENU NEXT> EXIT ROOF MATE Step-By-Step Over BOARD-STOCK INSULATION 1 2 STEP 4 – Details Reinforce around drains, scuppers, flashings, protrusions, vents, openings, etc., using ROOF MATE Mesh embedded into ROOF MATE Butter Grade or ROOF MATE Basecoat. Apply ROOF MATE Butter Grade or ROOF MATE Basecoat liberally around the area to be reinforced. While the material is still wet, embed a strip of ROOF MATE Mesh, centered over the detail, applying additional material to totally encapsulate the reinforcement fabric. Reinforce all seams in the insulation board, vertical/horizontal interfaces, roof termination points and transitions with ROOF MATE Mesh embedded into ROOF MATE Basecoat or ROOF MATE Butter Grade as described above. 3 4 <BACK MAIN MENU NEXT> EXIT

<BACK MAIN MENU NEXT> EXIT ROOF MATE Step-By-Step Over BOARD-STOCK INSULATION STEP 6 – Full Reinforcement Fabric Reinforce entire surface of the board-stock insulation panels by embedding 40” (102 cm) wide rolls of ROOF MATE Fabric into ROOF MATE Basecoat or Unibase. Sandwich the fabric between two coats of ROOF MATE Basecoat, each applied at the rate of 1 to 1½ gallons per 100 sq. ft. (.4 to .6 l/m²). If using Unibase, roll out a 4’ to 10’ (1.2 to 2.5 m) length of fabric and either spray apply or pour Unibase evenly over the top side at the rate of approximately 2 gallons per 100 sq. ft. (.8 l/m²). Work the coating evenly throughout the fabric using a broom or roller so that it is totally encapsulated, eliminating any air pockets, wrinkles or gaps, and allowing the fabric to conform to the surface contours. Overlap consecutive passes of ROOF MATE Fabric a minimum of 2” (5 cm) on each side, taking extra care to ensure that all edges are thoroughly encapsulated, tight and secure. <BACK MAIN MENU NEXT> EXIT

<BACK MAIN MENU NEXT> EXIT ROOF MATE Step-By-Step Over BOARD-STOCK INSULATION STEP 7 – Coating Application Apply 1 to 3 separate coats of ROOF MATE, using airless spray or roller, at the total rate of 1.5 to 4.5 gallons per 100 sq. ft. (.6 to 1.8 l/m²), depending on warranty and/or specification requirements. Create a self-terminating flashing by extending the topcoat a minimum of 3” (7.5 cm) above all protrusions, parapet walls, etc. <BACK MAIN MENU NEXT> EXIT

<BACK MAIN MENU NEXT> EXIT ROOF MATE Step-By-Step Over BOARD-STOCK INSULATION STEP 8 – Options Apply walk pads, ceramic roofing granules or Rhino Top as required to demarcate walkways and service areas, and/or provide non-skid characteristics. To enhance dirt release characteristics in problem areas, apply a coat of Acrysheen, which imparts a slick, semi-gloss finish that aids in maintaining a clean surface. *Rhino Top is a tough acrylic coating that is available in both smooth and textured formulations. It is ideally suited for horizontal surfaces that receive regular foot traffic. <BACK MAIN MENU NEXT> EXIT

Thank you for choosing quality ROOF MATE products from UNITED COATINGS <BACK MAIN MENU NEXT> EXIT