Harnessing Solar Energy by Utilizing Rooftop Space of Railway Buildings Solar Energy Corporation of India 4 th Floor, Tower 1, NBCC plaza Sector V, Pushp.

Slides:



Advertisements
Similar presentations
Any Industrial Need Under One Roof. India has one of the largest manufacturing base in the world, supporting a strong engineering and capital goods sector.
Advertisements

Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Nexus Energytech Pvt. Ltd. Arvind Karandikar
By Sudhir K. Saxena Exe.Engg.Elect.Engg. Mgt/RB. Electricity consumption over Indian Railways for traction & non-traction.
MNRE Scheme on Grid-connected Rooftop PV Systems
GRID PARALLELED kWp ROOF TOP SOLAR PV SYSTEM AT AVANT-GARDE AVANT-GARDE.
Ministry of Urban Development Government of India C K Khaitan JS (Urban Transport) 29th Jan Inputs on Urban Infrastructure Development in India.
NHB RESIDEX- Status, Challenges and Way Forward Presentation on NEW DELHI MAY 31, 2013.
REC Mechanism: Opportunity for Investment in Wind Power Dr. Govind Bhagwatikar Siemens Limited: Wind Power Renewable Energy 2012 Wind Conference Pune,
SOLAR POWER A SUSTAINABLE ENERGY SOURCE DMRC’s INTITATIVES Delhi Metro Rail Corporation.
Madhav Solar (Vadodara Rooftop) Private Limited Be a partner of Madhav Group to develop Vadodara into Solar city.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
Harnessing Renewable Energy & Solar Mission of Indian Railways.
Initiatives on Solar Energy on Northern Railway By A. K. Singhal CEGE/NR 10th January’2015.
Meeting Engineering Demands - Precisely Through Our Plants In: United Kingdom Poland India (from late 2007)
Best Practices in Building Energy Code Implementation 1 NRDC India Initiative.
1 Renewable Energy Options for the Indian Railways Amit Kumar TERI, New Delhi December 21, 2011.
You currently have no control over ever rising electricity prices Electricity costs have doubled over the last 10 years* What will your electricity bill.
CONFERENCE ON A3: AVAILABILITY, ACCESSIBILITY AND AFFORDABILITY OF POWER IN INDIA The Roadmap to Ensuring Power For All on 06 May 2015, CII-Sohrabji.
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
© 2012 Firstgreen Consulting Corporate Credentials Oct 2012.
SOLAR POWER SOLUTION FOR TELECOM APPLICATIONS
RENEWABLE ENERGY POLICY. Renewable energy is energy that comes from resources which are continually replenished such as sunlight, wind, rain, tides, waves.
Renewable Energy Scenario in Gujarat R. N. Pandya, Sr. Project Executive Gujarat Energy Development Agency Gandhinagar.
SOLAR POWER DEVELOPMENT – VGF OPTION UNDER JNNSM 1 Dr. Ashvini Kumar Director (Solar) Solar Energy Corporation of India.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
Energy Storage Need & Relevance under Climate Change mitigation efforts for India 1 1 Rajsekhar Budhavarapu (Head – Wind Business & CTO- Renewable Investments)
Solar Rooftop. The HERO GROUP - OVERVIEW The HERO GROUP - OVERVIEW  Top 10 widely recognized brand in India  Members among the leaders in business:
Financing Challenges For Large Ground Mounted Solar Projects 15 September, 2015.
Sudhir Garg Executive Director Min. of Railway 15 Sep., 2015 Reducing Energy Consumption on Indian Railways : Key Initiatives and Opportunities.
SOLAR ENERGY USE: THE GAME CHANGER FOR RAILWAYS Pradeep Chaturvedi Vice President (Energy Committee) World Federation of Engineering Organisations Paper.
The World Bank Group Ashish Khanna India Energy Team Leader South Asia Sustainable Development.
Solar Markets in India 2013 Seminar Keynote Address Pranav R. Mehta Chairman Solar Energy Association of Gujarat 7 th May, 2013 Hotel Crowne Plaza, New.
Sanjay Garg General Manager PGCIL/ Ministry of Power
Electricity is one of the major input for the operation of Metro Rail. The electricity demand of Delhi Metro is 150 MW Monthly expenditure on electricity.
SOLAR ROOF-TOP is A necessity for DELHI METRO DR. MANGU SINGH Managing Director, DMRC.
Indian Railways: Greening the tracks Achieving the 1 GW solar PV target Aditya Ramji Junior Research Associate Council on Energy, Environment and Water.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
Presentation on solar rooftop Abhilakh Singh General Manager 9 th October, 2015.
Solar energy at Uniworld Gardens 400kW to provide back up power
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
Ministry of New and Renewable Energy Government of India 1 11th January, 2016.
RENEWABLE ENERGY POTENTIAL IN INDIA
Where India Stands - Energy Demand (mtoe) India is the Fourth Largest Energy Consumer Source:BP Stat 2010 Low per capita energy consumption (toe)
MERC (Net Metering for Rooftop Solar Systems) Regulations, 2015 One Day Workshop on Grid Connected Solar Roof-top Projects in Maharashtra by MEDA.
SOLAR EPC CONTRACTOR COMPANY PROFILE SURYA INTERNATIONAL.
INDIAN RAILWAYS  I. Rly. Vision for Next 10 Years  Opportunities for International Partners A Presentation by – Mr. Arbind Kumar Director (Projects)
Grid - Connected Rooftop PV Systems भारतीय सौर ऊर्जा निगम ( भारत सरकार का उपक्रम ) 1 st Floor, Religare Building D-3 District Centre, Saket, New Delhi
1 Implementation of Off-Grid Policy in the state of Maharashtra By H M Kulkarni General Manager (R.E) Maharashtra Energy Development Agency Date 17 th.
Support for the SDDX Program: Training for Renewable Energy Service Companies Beijing JKD Renewable Energy Development Center 8 th June, 2005.
Incentives For Use Of Renewables
About CleanMax Solar Largest rooftop solar developer in India with ~25% all India market share All India presence with 5 offices and solar plants across.
India, The macroeconomic context
SOLAR EPC CONTRACTOR COMPANY PROFILE
EQ Cleantech Finance and Tech Summit
Hartek Group is one of India’s fastest growing company with offerings that span across Engineering, Renewables, Technology , Construction , Fuel and Manufacturing.
Solar ROOFTOP- Challenges & INNOVATIONS TO ACHIEVE 40 GW
Solar Rooftop : Challenges and Innovations to Achieve 40 GW
Rooftop Solar PV Systems for Metro
Growth of Renewable Energy in India
SOLAR POWER A SUSTAINABLE ENERGY SOURCE DMRC’s INTITATIVES
Financing of Solar power plants
Rajib Das Dy GM, Planning November 5, 2017 Transition of India’s
Rooftop Solar Net Metering: Regulatory Impact Dr
Indian Grid Code and Commissioning Test Procedure Dr
Training on Dr. Sudhir Kumar Grid Connected Rooftop PV Systems
A Study on ‘Mechanisms for Coping with Power Outages’
COMPANY PROFILE. 150 MW Fully Automatic Line LIMITED WARRANTIES 5 Years product warranty 90% of the specified minimum output of the module for a 10 years.
Harnessing Renewable Energy Solar Mission of Indian Railways
bihar electricity regulatory commission
Presentation transcript:

Harnessing Solar Energy by Utilizing Rooftop Space of Railway Buildings Solar Energy Corporation of India 4 th Floor, Tower 1, NBCC plaza Sector V, Pushp Vihar Saket, New Delhi

SECI- Inception and Objectives 17-May-15SOLAR ENERGY CORPORATION OF INDIA2 A Government of India Enterprise under the administrative control of MNRE Incorporated on 20th September, 2011 as a “Not for profit” Company under Section 8 of the Companies Act, 2013 Authorised capital INR 2,000 Crores; Paid up capital INR 42 Crores as on FY OUR MANDATE:  To be the implementing agency for meeting the National Solar Mission objectives  To plan and execute an integrated programme on development and deployment of solar energy technologies to achieve commercialization;  To own, operate and manage, both grid-connected & off-grid power stations;  To promote R&D in Solar OUR MANDATE:  To be the implementing agency for meeting the National Solar Mission objectives  To plan and execute an integrated programme on development and deployment of solar energy technologies to achieve commercialization;  To own, operate and manage, both grid-connected & off-grid power stations;  To promote R&D in Solar

SECI Activities : Ongoing As part of the Mission activities SECI has taken up the following projects/ activities.  750 MW Grid connected solar power plants under JNNSM Phase II  4000 MW Ultra Mega Solar Power Plant in Sambhar, Rajasthan  Pilot CSP Projects of around 100 MW  Implementation of Grid Connected Solar Roof-Top scheme  Development and dissemination of solar home lighting systems/ solar lanterns  Solar Thermal installations for water/air heating  Solar Mini/Micro Grids/street lights etc.  R&D Projects Broad mandate: Implementation & Facilitate various activities of the JNNSM. 17 May SECI

Growth of Solar Capacity (MW) StateMWp % Gujarat % Rajasthan % Maharashtra % Madhya Pradesh % Andhra Pradesh % Uttar Pradesh % Tamil Nadu % Jharkhand16 0.8% Karnataka24 1.1% Orissa % Punjab % Haryana % West Bengal % A & N Island % Uttarakhand % Chhattisgarh7 0.3% Delhi % Lakshadweep %

Roof top PV-Towards grid parity Source:KPMG By 2017 roof top solar power cost will reach the grid parity.

Benefits of Roof top PV On national level, reduces requirement of land for addition of solar capacities. For consumers, it – Reduces the dependency on grid power. – Mitigates diesel generator dependency. – Long term reliable power source. For Discoms, it reduces – Day Peak load Demand – T&D and conversion losses as power is consumed at the point of generation. Most suitable for commercial establishments – Max generation during peak usage time. – Solar power cost is close to the commercial power cost.

SECI’s Grid Connected Rooftop Scheme Salient Features MNRE launched a pilot scheme in year 2013 for grid connected rooftop PV power projects –being implemented by SECI The scheme allows system size from 100 kW to 500 kW – Aggregation of capacity from smaller roofs is allowed. 30% of the cost would be provided as subsidy and 70% to be met by the consumer Systems are to be grid connected and without battery back up Mostly in-house/captive consumption and to replace diesel generation Surplus solar power to be fed to the grid Cities across India being covered under the scheme for wider participation/promotion Developers selected through a competitive process

Implementation Under the scheme SECI – Allocates capacity for each city/State in consultation with MNRE/SNAs – Verify project proposals w.r.t. technical specifications and release the sanction for subsidy which is linked to performance up to 2 years – Release initial subsidy on successful commissions as per technical specifications (20%) – Release 5 % subsidy each at the end of 1 st and 2 nd year of successful maintenance of the project – Help developers for identification of projects through dissemination workshops and to discuss any issues with concern authorities

9 Palatana (1) Kolkata (2) Bhubaneswar (1) Chennai (6) Coimbatore (1.5) Bangalore (3) Mumbai (1) Pune (3) Gwalior (1) Chandigarh (1) Jaipur (3.75) New Delhi (5) Gurgaon (2.5) Noida/Greater Noida (3.5) Raipur (2.05) Hyderabad (4) Implementing Rooftop projects with 30% subsidy from MNRE kW capacity projects being set up in select cities Phase I: 5.5 MW (4 cities) Phase II: 11.3 MW (6 cities) Phase III: 10 MW (9 cities) SECI’s Ongoing Scheme of Rooftop PV (Covering 37 Cities of India) 17-May-15 SOLAR ENERGY CORPORATION OF INDIA 11 Legend Phase I Phase II Phase III Phase IV Multiple phases Capacity in MW () Madurai (0.5) Vijaywada (0.5) Tirupati (0.5) Nagpur (0.5) Nasik (0.5) Bhopal (1) Panchkula (1) Patna (2) Ranchi (2) Mohali (1) Amritsar (0.5) Ludhiana (0.5) Gandhinagar (1) Vadodara (0.5) Surat (0.5) Mysore (1) Durgapur (1) Faridabad(0.5)

Grid Connected Rooftop Scheme of SECI So far 27 MW is allotted under three Phases of the Scheme Around 40 MW will be allotted in Phase IV of the scheme – Benchmark cost is Rs. 90/ Wp for PPP model (RESCO) ; on which 30% capital subsidy will be available from MNRE – Tariff based competitive bidding is experimented for RESCO model in Phase IV of the scheme which lead to solar tariff in general in range of Rs. 6.0 to Rs (Cap at Rs.6.75/kWh) – In Capex model Average price is Rs. 75/Wp; Breakeven 5 to 6 years

Indian Railways - Rooftop Solar PV Potential Roofs of Railway Stations (On going discussions for rooftop SPV systems at New Delhi, Anand Vihar, Katra Railway Stations etc) Railway Workshops, Loco sheds, Coach factories, Residential Railway Colonies, Office buildings, Hospitals etc.

Energy Utilization Pattern In Indian Railways Electricity consumption: 16.6 billion units (14.16 billion units Traction, 2.46 billion unit for non traction) ~`~ 2500MW ~~ 3800 MW (peak), (22 billion unit, 5000 MW XII Plan projected) Electricity consumption(Non Traction) - workshop 25%, station and service building 35%, pumping 10%, domestic 30% Share in total energy Consumption (NATIONAL) - 2 % Share in total energy consumption of transport sector - 5 % ( 77 % diesel, 23 % electricity) Share of energy in total operating cost of IR – 24% (18,000 Cr, 8700 Cr for Electricity) (87 % traction, 13 % non- traction)

Energy Usage FOR Rolling stock manufacture, maintenance and disposal Train operation. Infrastructure construction and maintenance Administration of transport business. Energy production and trade. TIME 24 X 7 X 365THROUGH GRID Power+ DG Set + Renewable (very Low)

Why Solar in Railways Railway sector growth 8-9% Progressive shift of freight traffic to railway 80% of rail freight and 60% passenger traffic on electric energy by 2030 Electricity demand to go 100 billion kWh by 2030 for railway sector alone in India The current trends indicates constraints in indigenous availability of conventional energy resources World trend to achieve min. 25% through RE by 2020 in transport sector leader Germany, Sweden, USA Fuel diversity No space constraint

Railways Initiatives Indian Railways Vision 2020-At least 10% of its total energy to come from renewable sources such as solar power, wind, and biomass etc.” (500MW) Policy of solar based system for D and E class station, emergency light for all class of station(sep,12) Achievement so far MW Wind 4.50 MW solar 4.69 MW solar PV Plant in progress

Railways Initiatives Solarization of unmanned Railway Crossings – For Optical fiber and Integrated Battery bank system – The system size ranges from 1400 Wp to 3500 Wp – More than 150 systems have been installed nation wide – The zone covered are Eastern, Nothern railway, Western railway and West central

Installation of 500 kWp size Rooftop at Katra Railway station in J&K within 3 to 4 months Decided to take up rooftop PV projects at railway stations, workshops, loco sheds, hospitals,offices and residential colonies etc Under Phase I of 500 MW across the country Railways to share the details of rooftop space SECI and IR may work together on a special scheme dedicated to Railways (in consultation with MNRE for CFA) and implemented through various business models including PPP mode

Major consumption by IR at respective locations and excess power only to flow to grid Activity start up locations are New Delhi Railway station, Katra Railway Station, workshops at Dahod, Bhusaval, Chittaranjan locomotive works and Kanchanpara, Innovative Pilot project of providing rooftop PV on one Non- AC railway coach with thin film technology SECI shall provide complete solution from Conceptualization, estimation, tendering, Implementation, monitoring, handholding and initial O&M support for these Solar Power Projects and activities for Indian Railways

Criterion for Roof Selection for SPV Systems In the ideal case SPV system should be mounted facing towards South direction Roofs should have longer life and better load-bearing capacity Structure should be strong enough to bear the load of the PV panels and the associate mounting systems Roofs may be identified in the initial phase where commercial tariff is high and there is better promotional prospect

Key Challenges Roof Assessment Detailed structural analysis and wind load assessment is required to be carried out for realistic SPV design and engineering It has been seen that most of the roofs comprise Asbestos Cement Sheets which are brittle in nature and not generally recommended for SPV systems SPV systems should be installed on the roofs with metallic tops for longer life and better load-bearing capacity

THANK YOU