Mauna Loa, Hawaii (MLO) At MLO, the sampling stack is cantilevered away from the tower so that the stack can go through the building roof while the tower.

Slides:



Advertisements
Similar presentations
Framing.
Advertisements

Closed Area Construction
Analyzer flow (30 lpm) Carbon vane pump Exhaust filter System vacuum gauge Spare#1 (30 lpm) Spare#2 (30 lpm) Spare#3 (30 lpm) Spare#4 (30 lpm) Blower#1.
What is Cornice?.
Optical Manufacturing Solutions 1 Probe Assembly.
Installation. Indoor Unit Installation Typical Installation.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Wine Cellar Split System Basics. Definitions Split System – A cooling unit that “splits” the cooling coil and the condenser apart into two remote pieces.
Potential Pathways for Coliform Contamination. Fixing Positive Coliform Results.
Reservoirs Covered in Ch. 5 of Vickers Text
Birdcage Dome On A Mesa Chicken wire stretched over an interwoven hemispherical matrix of painted steel rebar forms a dome home. Between the chicken wire.
THE COLOSSEUM. HISTORY OF THE COLOSSEUM it was originally called the Flavian amphitheatre after the family of Emperors who built it. it was originally.
Math-8 NOTES DATE: ______/_______/_______ What: applying surface area... Why: To investigate a variety of different types of surface area applications,
Unit 3 House and Home. Objectives: To learn to describe both interior and exterior of houses ; To help students learn to read advertisements for housing.
Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd.
Green Building Design Scott Lowe Professor Civil and Environmental Engineering Department Manhattan College.
Competency: Draw roof plans
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
Installation. Indoor Unit Installation Typical Installation.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Energy & Its Impact on Global Society Jerome K. Williams, Ph.D. Saint Leo University Dept. Mathematics & Sciences.
Building Types.
Roof Types, Components & Terminology
Three Lines of Defense Presented by the Arapahoe County Sheriff’s Office.
Industrial Acoustic Sound Enclosures FanAir Company designs and builds Acoustic Sound Enclosures Engineered to each specific application to control noise.
APPLICATIONS OF TECHNOLOGY
Constructing Homes and Other Buildings
Windows Do not open or close all windows and doors at the same time. Optimise the ventilation by experimenting with opening different windows instead.
SOLAR CHILL SOUTHWEST SOLAR PUMP POWER IN FAN MOTOR PAD MEDIA PUMP BOARD.
APPROVED TRAINING MANUAL’S LESSON PLANS AND COURSEWARE STAR MARIANAS AIR, INC. Recurrent – Flight Crew Part III – Aircraft Ground Training Section 2 –
Balloon Frame North-American invention, 1833
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate.
1 Building Types. 2 Building Use and Size Buildings are available in many types and sizes. Large, specialized buildings should be planned and built by.
The Puerto Rican landscape. Puerto Rico Can you name of Puerto Rico’s natural landscapes? landscape is the features of a given area of land. Natural.
Residential Construction Mr. Todzia
Structural Parts. Structural Parts Greenhouse Types Even Span: Self-supporting commercial greenhouse and is the most common type of greenhouse Ridge-and-furrow:
Parts list 1 – 8’ 2” OD stainless steel pipe, chamfered at both ends 1 –7’ 4” PVC pipe 2 – 4” PVC end caps, with appropriate holes 1 – heater (model#=Omegalux.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Wood Construction CTC-375.
LRR – Mechanical Alphonso Stewart Judy Brannen David Steinfeld Ilene Sokolsky Eric Jenkins.
Detailed Operation: Model 1130 and Model 1135 Rev: 1.11 November 3, 2003.
THIS IS WITH CARLIN BRIGHT Miscellaneous Orthographic Views Which Drawing Is It? Which Drawing Is It? II Past Units
Electrical Plans.
Chinese Landmarks By Jackson McDonald. Introduction Do you know all the big landmarks in China? There’s the great wall, Mount Everest, the forbidden city.
Dr. Dominique Derome 1 If a portion of the cavity is left empty to provide an air space (with a min. width of two inches), the wall works as a Rain screen:
Objective 39 Honors Geometry WP: Pythagorean Theorem.
INTERIOR DESIGN Ms. Cromartie Spring 2015 Mod
Unit 209: Drainage systems
New Support Structure 4x4 Beams Existing Stairs per Mr Walter Kellner Cherenkov 32 deg shifted back 4.0 inches to clear existing structure Cherenkov 40.
APPLICATIONS OF TECHNOLOGY
Competency: Draw roof plans
Maria’s Restaurant Appendix A Section 16 HVAC Building Loads
House Styles Architecture one.
The PV Cell Cell, Module & Array.
Competency: Draw roof plans
Disclaimer: Please note and abide by copyright laws. Some items contained in these presentations are taken from copyrighted material without express permission.
Angle of Elevation and Angle of Depression
International Building Materials and components
Components of Construction
Tube Heater, 3,000 Watt 240V Top + Back Front 1”Hole For Mixer Shaft
AtmosphericVortexTower LLC
Surface Area and Volume Review
Chapter 11 Lesson 3 Engine Top End.
Furnaces (also called Fired Heaters)
Competency: Draw roof plans
Competency: Draw roof plans
© OnCourse Learning.
Shield volcanoes by Sadie and Ashton
Presentation transcript:

Mauna Loa, Hawaii (MLO) At MLO, the sampling stack is cantilevered away from the tower so that the stack can go through the building roof while the tower attaches to the ground. The access port is 4-5 feet above the roof and can be reached w/o climbing the tower. The heater section of the sampling stack goes through the roof of the lab at MLO to the interior. The Vaisala T/RH probe is circled. Better view of what comes through the ceiling to the flow splitter. Waterproofing is the key for roof penetration installations. Excess stack flow tube going to pump box outside building. Tower base bolted to concrete pad.

Southern Great Plains, Oklahoma (SGP) At SGP, the sampling stack is built of stainless steel and breaks in the middle. The top half can be raised/lowered with a winch. The access port is easily accessible from the work platform. This is much nicer than a basic installation, but is also much more expensive. Excess stack flow tube. Air goes to blower in pump shed outside trailer. Insulated sampling lines.

Bondville, Illinois (BND) At BND, the sampling stack is cantilevered as at MLO and enters the trailer roof. The access port is easily accessible from the top of the trailer w/o climbing the tower. Excess stack flow is routed to the external pump box. Pump exhaust filter, one of several styles we use.

Trinidad Head, California (THD) At THD, the sampling stack is attached directly to the triangular met tower. The access port is ~18 inches above the level of the trailer roof. The sampling lines at THD enter the trailer from below, and the excess stack flow line goes to the pump box which is below the trailer. Met tower base bolted to concrete pad. Roof mounts are available. Note that the tower base has hinges so that it can be tipped if necessary.

Cape San Juan, Puerto Rico (CPR) CPR is one of our most basic installations, with the lab a 6 ft x 8 ft wooden shack. The sampling stack is attached directly to the tower and the sampling lines enter the building from the flow splitter through the side wall. The access port is easily accessible from the work platform. Stack rain cover with stainless steel insect mesh.

Mt. Waliguan, China (WLG) At WLG, the sampling stack was built by the Chinese and penetrates the roof. The access port is just above roof level. The unique thing about the WLG installation is that they have a double exterior wall on their building, which means that the stack can be serviced from a weatherproof corridor. Pumps are also located in this corridor outside the lab. Sampling lines exit the flow splitter and go through the lab wall to the instrument rack.

Cape Point, South Africa (CPT) At CPT, the sampling stack is attached to a very tall (60m) tower. The stack has been tilted slightly for an easier entrance into the roof of the laboratory. The access port is easily accessible from the ground (the laboratory was built into the mountain). The end of the heater section, with the flow splitter, is all that shows on the inside of the laboratory. Spare sampling lines and pump box.