Update False Floor and Roof Dennis Haasler EN-MEF-EBE.

Slides:



Advertisements
Similar presentations
© 2012 Pearson Education, Inc. Q4.1 v Motor Cable Elevator An elevator is being lifted at a constant speed by a steel cable attached to an electric motor.
Advertisements

Prof Awad S. Hanna Concrete Structures Concrete Structures.
Excel Environ Racks Simon Robinson. Ranges Sizes Features Environ v. formal surround; enclose.
Pt5 - RadWG meeting Presenting a concept Prepared by M Gastal & S Maridor
All ground where the feet of the N-Rack are to go must be levelled and concreted. This must be done in advance to allow the concrete to set. There are.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
DAQ&CM Infrastructure Paul Drumm. Issue Space is running out! Power supplies, RF system –Big kit, legislation dictates space requirements (not a clear.
Chapter 19 Floors.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Alarmline Linear Heat Sensor Typical Applications.
Umm Al-Qura University Department of Civil & Structural Engineering 1 Design of reinforced concrete II Design of one-way solid slabs Lecture (1)
EDMS Nr /02/ tons, Platform – Q = daN, aprox. length to cover 4 m Cabling Groove – Q = 500 daN, aprox.
Proposal of RP Control Area adapted to the evacuation campaign of radioactive waste from CERN radioactive storage Yann PIRA, Chris THEIS, Kurt WEISS 19/05/15,
Plain & Reinforced Concrete-1 CE-313
New Learning Goal Rate yourself… Where do you think you are at on the new learning goal?
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
Perimeter is the distance around the outside edge of a flat object. l = length w = width.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Positioning fork M. Ciappeti R. Vuillermet 29/09/20111.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
The four basic types of structures are :
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
Proposed Conventional Sextupole for Installation at A0 Introduction (Dean Still) Reasons for installation- Reduce I in S6 feeddown sextupole circuit at.
Area is the amount of surface space that a flat object has. Area is reported in the amount of square units.
LHCb Radiation Shielding Wall – Status Wall Description Front Part 1 Aprox. 6 m Front Part 2 Aprox. 6.6 m Labyrinth.
1 TT10 Remedial works What is happening. 2 Compression failure in crown (some cases) Tension/Shear failure in shoulders (typical) Compression Tension.
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
Calculations D. Smargianaki 29/04/2015 LBNF. Outline D. Smargianaki(CERN) 2 29/04/2015 Comparison between Single Beam & Beam with Spliced connections.
1 Cabling from sub-detectors Current thinking V.Bobillier L. Roy.
Modifications assembly zone CRAB Cavity SM18 View assembly zone with Cavitys LHC cryomodule/string CRAB + gantry/cryomodule SPL (plan: LHCACFGA_T0036)
Objective 39 Honors Geometry WP: Pythagorean Theorem.
ESS Bunker A concept for a common beamline interface. ISIS Engineering Group, February 2015 For illustration purposes a conceptual CAD model of the VOR.
Status of GIF++ Adrian Fabich, Dorothea Pfeiffer, EN-MEF-LE EATM, 27th August 2013.
GIF++ implementation Adrian Fabich, Sylvain Girod, Dorothea Pfeiffer, EN-MEF-LE GIF++ 3rd users’ meeting, 11th July 2013.
GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
Final Concept Lead Filter Movement System Dennis Haasler EN-MEF-EBE.
Pre-Calculus 2-6B: Page 161 #’s 27-38odd, 41,49
The Next Generation of a Gamma Irradiation Facility GIF++
Schedule CM SPS G.Vandoni.
SX1 manipulation VERSION 1 Version
Types of ground floors.
MICE Partial Return Yoke Mechanical Design
Introduction Used for covering spaces in the form of roof or floor
Container specifications
Area and Perimeter Dr. Beth McCulloch Vinson Athens State University PT3 Grant Funding, Summer 2000.
Area and Perimeter Dr. Beth McCulloch Vinson Athens State University PT3 Grant Funding, Summer 2000.
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
Area and Perimeter.
Area and Perimeter.
Minuteman Vocational Technical Regional High School Progress
Concrete Structures DR. Nabil Dmaidi.
PRESSURE Year 7 Science.
Area and Perimeter.
PRESSURE.
بسم الله الرحمن الرحيم An-Najah National University
STEEL PLATES.
Area and Perimeter.
Neutron guide Shielding Concept
Area and Perimeter.
Area and Perimeter.
Bunker Wall Design Wall
Bunker Wall Design Wall ESS
Chapter 13 Concrete Form Design.
Presentation transcript:

Update False Floor and Roof Dennis Haasler EN-MEF-EBE

GIF++ Bunker (updated) New chicane Modified chicane Space for racks 4.80m 16/01/2013Dennis Haasler - EN-MEF-EBE2

False Floor: GIF Implementation Design for a maximum weight of 8t Distributed to 4 feet (2t each) With a footprint of A=100x100mm per foot Distance between two feet equal or greater than 1m t=20mm HEA mm 1000mm 400mm 300mm Cable Tray Use of the support structure from the standard CERN false floor - But cover plates made of steel, with t=20mm 16/01/2013Dennis Haasler - EN-MEF-EBE3

Cable Trays at the Wall/Trigger 200mm 400mm U-beam 16/01/2013Dennis Haasler - EN-MEF-EBE4

False Floor: Top View Source Ground - Trigger Cable Trays 16/01/2013Dennis Haasler - EN-MEF-EBE5

False Floor: Cost Estimation - Costs of the structure: 4€/kg (includes material and installation) -Steel plate (2m^2): 320€ -Cover cable tray(0.2x0.5m): 35€ ZoneAreaStructureSteel PlatesCable TraysTotal Costs Big Radiation Zone50m^2€6,295.88€7,040.00€3,800.81€17, Small Radiation Zone28m^2€3,321.34€3,840.00€1,331.94€8, Preparation Area60m^2€6,209.17€9,600.00€0.00€15, In total: 41,000 € 16/01/2013Dennis Haasler - EN-MEF-EBE6

Roof 1: T-Shaped Blocks (Concrete) Quant.LenghtPrize eachSum 13x5m4,400€57,200€ 8x6m4,950€39,600€ 2x3.50m3,250€6,500€ Total:103,300€128,000CHF 16/01/2013Dennis Haasler - EN-MEF-EBE7

Roof 2: Plates + Beams Concrete Plates t=400mm 5m 4m4m 2m Steel Beams 200x200mm Concrete Beams m Quant.LengthPrize eachSum Concrete Plates6x5m4,650€27,900€ Concrete Plates4x6m5,300€21,200€ Concrete Plates1x3.50m3,450€ Steel Beams6x4.80m -0€ Concrete Beams9x4.80m1,300€11,700€ Total:64,250€79,500CHF 16/01/2013Dennis Haasler - EN-MEF-EBE8

Roof 2: Plates + Beams 16/01/2013 Dennis Haasler - EN-MEF-EBE 9