Repair/ Rehabilitation of School Buildings (Cluster 2)

Slides:



Advertisements
Similar presentations
Work Breakdown Structure WBS
Advertisements

1 Zero Tax Increase Referendum: Community Information Session.
The Student Handbook to T HE A PPRAISAL OF R EAL E STATE 1 Chapter 10 Improvement Analysis.
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
Copyright © by NCCER, Published by Pearson Education, Inc. Carpentry Fundamentals Level One Module National Center for Construction Education.
BUILDING MATERIALS. INDEX 1- Title Index Building materials
Harding Elementary School Exterior Repairs & Select Roofing Replacement 08/12/2014.
Update on FCPS Construction/Renovation Projects August 2009.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Newark CSD Phase II Capital Improvement Project Board of Education Report August 2013.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
FATALITY REPORT 10/01/03 – 09/30/04. FY - 04 Fatalities By Area Office 267 Total Atlanta East = 20 Atlanta West = 29 Birmingham = 27 Columbia = 2 Ft.
BUILDING PERMIT PROCESSING RATIONALE ( Lease Agreement, article on Miscellaneous – Improvements) “ The LESSEE shall not make any structural changes,
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
Build and Sell Home Building & Construction Townhouse & Apartment Construction Condominium & Commercial Building Housing & Subdivision Development Inclusive.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Er. Kashmir Dass M.E. (Hons.) Civil Sr. Lecturer in Civil Engineering, Sant Baba Attar Singh Govt. Polytechnic College, Badbar, Barnala Measurements in.
Educational qualifications and experience required from the technical staff of contracting activities # Activity code Activityeducational qualification.
PHOTO. NO.DATE: 06/11/13 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MAJOR MAINTENANCE FY 14.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
How to build a two storey house
The Student Handbook to T HE A PPRAISAL OF R EAL E STATE 1 Chapter 11 Improvement Analysis.
Choosing a building system 1. Physical limitations: Size of the land How heavy a building can the soil support How long a structural span is feasible What.
Introduction of the Building Sector in DPR Korea 9 th March, 2008.
© OnCourse Learning. All Rights Reserved. Basic House Construction Learning Objectives  List the primary styles of residential architecture  Describe.
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
General Contractors  Over 10 years of Service  Commercial  Military Institutions  Government Agencies  Female Owned and Operated Firm  Teamed with.
Click here for Game Rules & Instructions: Copyright © 2009, Steve Beutler, All rights.
Work Breakdown Structure WBS
HOME MODEL. P e r s p e c t i v e HOME MODEL 4.00m X 5.50m Floor Area = 22 sqm. Turn-over unit 4.00m 5.50m 1.4m 4.00m.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
SOME COMMON RELATIONS USED IN BUILDING ESTIMATES
© 2009 Nelson Education Ltd. Carpentry First Canadian Edition 1 Chapter 21 Floor Plans.
1 Report to Regional Coordinators of TAG Meeting Sept 22-24, 2004.
The IARC Complex Annual Upkeep Estimated Cost Window cleaningLabor costs for contractor to clean interior and exterior surfaces of glass at the OTE building.
TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4,
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD CHATSWORTH HSChatsworth.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
Christine Davis Tarryn Hardgrove Becky Kalla. Current Convocation Athletic Training Room.
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Lesson 5.  The carpentry trade covers many items. That is, it is not confined to a few specific items such a reinforcing steel, painting etc.  Common.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
FACTORS EFFECTING COST OF BUILDING ELEMENTS
1 Guinn School Restoration Update Presented by Transportation and Public Works Department February 17, 2009.
Stone Avenue Train Station Renovation Project Board Workshop June 7, 2010.
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
WBS Experiment Infrastructure: LArTF GPP Project Status Dixon Bogert Prepared for the MicroBooNE Collaboration Meeting 11/02/12.
TRIGON, INC ARDMORE CITY SCHOOLS 2013 BOND ISSUE PROJECTS.
What’s with Time Square West? No. of Floors 43 Retail 1st and 2nd floor Parking 5 floors(2 basement, 3rd to 5th floor) No. of units 738 No. of parking.
Construction prodecure of Building
QUANTITY AND COST ESTIMATION OF RESIDENTIAL BUILDING
Passive Solar Home Design Project
Table (3.1)- the averages of the 10 models costs
Building Structural Systems
Embodied Energy Analysis of a Pre-cast Building System
Minuteman Vocational Technical Regional High School Progress
10 The Cost Approach—Part I: Reproduction/Replacement Cost
House Construction Budget Plan
In-Class Scheduling Exercise
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Wbs, CONTRACTORS & GIVING A BID
Stoughton Public Library
“ Construction of a Hospital Building” Submitted by: Zuhaib Alam 15PWIND0402 Submitted To: Prof.Rashid Nawaz Department of Industrial Engineering University.
Presentation transcript:

Repair/ Rehabilitation of School Buildings (Cluster 2)

May 12, 2014 Date Prepared Estimated Cost by Item of Work (Materials/ Equipment and Labor Only)

Camp Aquino Elem. School Demolition/ Restoration 10, Tinsmithry Works 25, Window 152, Ceiling Works (Interior Only) 141, Project Billboard 5,000 TOTAL334,091.30

Lourdes Elem. School Demolition5, Roof Framing Works146, Tinsmithry Works103, Project Billboard5,000 TOTAL 259,941.90

Cut-Cut II Elem. School Demolition 5, Roof Framing Works 113, Tinsmithry Works 65, Window 70, Project Billboard 5, TOTAL 259,981.00

Mapalacsiao Elem. School Demolition/ Restoration 8, Excavation 1, Concrete Works 74, Form Works 12, Masonry Works 61, Roof Framing Works 57, Tinsmithry Works 40, Project Billboard 5, TOTAL 260,482.40

Atioc-Dela Paz Elem. School Demolition/ Restoration10, Windows 13, Ceiling Works90, Tile Works106, Electrical Works35, Project Billboard5, TOTAL 260,677.70

C.A.T. Elem. School Demolition 5, Roof Framing Works143, Tinsmithry Works 106, Project Billboard 5, TOTAL 259,922.40

Buenavista Elem. School Carpentry Works 178, Tinsmithry Works9, Painting Works 66, Project Billboard 5, TOTAL 259,884.00

San Carlos Elem. School Tinsmithry Works111, Ceiling Works 75, Miscellaneous (Steel Post/ Wood Beam) 21, Painting Works45, Project Billboard5, TOTAL 259,984.70

Paraiso Elem. School Demolition/ Restoration of Roof 7, Embankment1, Masonry Works 101, Roofing & Roof Framing Works 74, Doors & Windows 52, Painting Works 12, Form Works 5, Project Billboard 5, TOTAL 259,885.70

Total Material Cost 1,844, Total Labor Cost 570, Direct Cost 2,414, Mark-Ups 480, VAT 289, ENG’G SUPERVISION 65, COST OF PROJECT 3,250,000.00

SchoolTotal Amount Camp Aquino Elem. School 334, Lourdes Elem. School 259, Cut-Cut II Elem. School 259, Mapalacsiao Elem. School 260, Atioc-Dela Paz Elem. School 260, C.A.T. Elem. School 259, Buenavista Elem. School 259, San Carlos Elem. School 259, Paraiso Elem. School 259, TOTAL 2,414,851.10

Repair/ Rehabilitation of School Buildings (Cluster 1)

August 4, 2014 Date Prepared Estimated Cost by Item of Work (Materials/ Equipment and Labor Only)

Sapang Maragul Elem. School Demolition7, Concrete/Masonry Works/ Plastering 23, Doors & Windows121, Ceiling Works111, Painting Works25, Form works2, Project Billboard5, TOTAL297,084.80

Paradise Elem. School Demolition/ Restoration20, Masonry Works 2, Ceiling Works291, Windows90, Painting Works33, Roofing works1, Project Billboard5, TOTAL445,404.20

Suizo Resettlement Elem. School Excavation Concrete Works7, Masonry Works 17, Roof Framing Works 136, Tinsmithry Works 93, Project Billboard 5, TOTAL 260,404.10

Suizo Bliss Elem. School Demolition10, Anay Treatment 11, Masonry Works9, Doors & Windows24, Ceiling Works103, Tinsmithry66, Electrical Works9, Painting Works18, Project Billboard5, TOTAL259,939.80

Bacuit Elem. School Demolition10, Roof Framing Works 99, Tinsmithry70, Ceiling Works (Interior Only) 68, Electrical Works7, Project Billboard5, TOTAL260,233.30

Samberga Elem. School Demolition 4, Concrete Works 57, Ceiling Works 94, Electrical Works 47, Painting Works 51, Project Billboard 5, TOTAL260,247.30

San Pablo Elem. School Demolition 10, Roof Framing Works 99, Tinsmithry 70, Ceiling Works (Interior Only) 68, Electrical Works 7, Project Billboard 5, TOTAL260,233.30

SchoolTotal Amount Sapang Maragul E/S 297, Paradise E/S 445, Suizo Resettlement E/S 260, Suizo Bliss E/S 259, Bacuit E/S 260, Samberga E/S 260, San Pablo E/S 260, TOTAL 2,043,546.80

Total Material Cost 1,543, Total Labor Cost 500, Direct Cost 2,043, Mark-Ups 406, VAT 245, ENG’G SUPERVISION 55, COST OF PROJECT 2,750,000.00

Repair/ Rehabilitation of School Buildings (Cluster 3)

August 6, 2014 Date Prepared Estimated Cost by Item of Work (Materials/ Equipment and Labor Only)

Laoang Elem. School Demolition/ Excavation/ Restoration 20, Concrete/ Masonry Works 114, Roof Framing Works 89, Tinsmithry Works 67, Project Billboard 5, TOTAL 296,889.80

Baras-Baras Elem. School Demolition 10, Roof Framing Works 90, Tinsmithry Works 55, Ceiling Works 67, Tile Works 23, Painting Works 20, Electrical Works 24, Project Billboard 5, TOTAL 296,863.10

Sinait Elem. School Ceiling Works 148, Windows 132, Electrical Works 44, Roofing Works 3, Project Billboard 5, TOTAL 334,064.70

Tariji Elem. School Demolition 5, Roof Framing Works 112, Tinsmithry Works 69, Ceiling Works 67, Project Billboard 5, TOTAL 260,005.60

Capulong Elem. School Demolition/ restoration of Roof 30, Roof Framing Works 112, Ceiling Works 103, Electrical Works 9, Project Billboard 5, TOTAL 230,314.70

Balibago I Elem. School Demolition7, Concrete Works68, Masonry Works25, Doors and Window107, Painting Works46, Project Billboard5, TOTAL 260,205.50

SchoolTotal Amount Laoang Elem. SchooL 296, Baras-Baras Elem. School 296, Sinait Elem. School 334, Tariji Elem. School 260, Capulong Elem. School 230, Balibago I Elem. School 260, TOTAL 1,708,343.40

Total Material Cost 1,282,808,00 Total Labor Cost 425, Direct Cost 1,708, Mark-Ups 340, VAT 204, ENG’G SUPERVISION 46, COST OF PROJECT 2,300,000.00

Repair/ Rehabilitation of School Buildings (Cluster 4)

August 7, 2014 Date Prepared Estimated Cost by Item of Work (Materials/ Equipment and Labor Only)

Matatalaib-Bato Elem. School Demolition/ Restoration 20, Concrete/ Masonry Works & Partition Wall 40, Doors & Window 138, Painting Works 56, Project Billboard 5, TOTAL 260,167.20

San Juan Bautista Elem. School Anay Treatment 4, Concrete Works 99, Ceiling Works 121, Form Works 10, Painting Works 19, Project Billboard 5, TOTAL 260,171.80

SchoolTotal Amount Matatalaib-Bato Elem. School 260, San Juan Bautista Elem. School 260, TOTAL 520,339.00

Total Material Cost 388, Total Labor Cost 131, Direct Cost 520, Mark-Ups 103, VAT 62, ENG’G SUPERVISION 14, COST OF PROJECT 700,000.00