1 Roof Top Units Saving Energy and Improving Occupant Comfort Presented by Ethan Bellavance and Mary Jane Poynter.

Slides:



Advertisements
Similar presentations
Trane Voyager™ rooftop units
Advertisements

ENERGY SAVING Product Offering COMPRESSOR MARKETING OPPORTUNITIES.
Your Company’s Maintenance Program NAPPS Heating, Air Conditioning and Plumbing 2012 The Comfortable Choice In East Texas Since 1957.
By: R.M. Chitranshi. ECBC With the background of high energy saving potential and its benefits bridging the gap between demand and supply, reducing environmental.
Program Overview Alan Shedd, Touchstone Energy 9/28/10.
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
Small Commercial Building Energy Retrofit Solution The Intelligent Application of Technologies to Achieve Permanent Load Reduction Presented by: Erik Ahrens.
Emerging Technology Field Test 1 February 5, 2015 Brown Bag Mira Vowles, BPA Wesley Saway, BPA.
Variable Frequency Drives VFD Basics
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
Advanced Direct Evaporative Pre-Cooling for Air Cooled Condensers (DEPACC) Program Overview Technology Overview Energy Savings Customer Benefits 1.
City of Boulder Meeting Kyoto -- Carbon Emissions Reduction: Commercial Lighting.
Advanced Rooftop-Unit Control – Retrofit Savings Analysis Overview 1 February 13, 2015 RTF Commercial Rooftop-Unit Working Group Mira Vowles, BPA.
LIMESTONE CRUSHING PLANT LOAD MANAGEMENT Jaco Snyman
Patent-pending upgrade solution that reduces Constant Volume HVAC System overall energy consumption by 25% to 40%. Patent-pending upgrade solution that.
Habitat for Humanity Design Review April 2, 2002.
Habitat for Humanity Final Presentation May 3, 2002.
If You Don’t Measure It, You Can’t Manage It! Enterprise Energy Management (EEM) also known as Monitoring and Targeting (M&T) is the key to measuring.
Dillard’s Energy Management
SUSTAINABILITY ANALYSIS OF RESIDENTIAL BUILDINGS Ashok Kumar Abhilash Vijayan Department of Civil Engineering.
Active Solar Heating By: Atif Mian. The objective is to teach everyone more about active solar heating systems and what its advantages are.
Study of Motor Control and Protection Effect of Under Voltage Transients in Commercial Buildings John Kueck, Dan James (PNNL)
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
MAXIMIZING DORM ENERGY SAVINGS WITH INTELLIGENT HVAC CONTROLS AASHE CONFERENCE, OCTOBER 11, 2011 AASHE CONFERENCE, OCTOBER 11, 2011.
Premium Rooftop Unit (RTU) Retrofit Overview August 20, 2012 RTF RTU Working Group Mira Vowles, BPA 1.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Emerging Technology Update Presented To Conservation Resources Advisory Committee June 4, 2014.
DNV GL © 2014 SAFER, SMARTER, GREENER DNV GL © 2014 HVAC_3 Quality Maintenance 1 Research Plan.
Building Technologies Energy and Infrastructure Upgrade Program Utilizing National Grid Incentives Rensselaer County Office Building.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Energy Efficiency – it makes sense! Ken Curry Energy Efficiency Manager
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Smartcool Systems Inc. Providing effective and reliable energy efficiency solutions for HVAC-R customers around the globe.
Name of Building(s) or Project Speaker(s) Organization(s)
Energy Trust of Oregon Small Commercial HVAC Pilot Program Stellar Processes December 15, 2009.
International Newspaper Group 2008 Gannett’s Green Campaign.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 22, 2012 Mira Vowles, P.E., CEM.
1. Maintenance Alignment with District ‘s Mission and Board and Superintendent’s Goal 2. Impacts of recent budget reductions 3. Review Energy Grant 4.
Evaluation of the RTF Standard Protocol Fan and Cooling Savings from Commercial-Sector Heat Pump Units Rooftop Unit Working Group (RTUG) August 20, 2012.
RTU Savings Research Project RTU Savings Research Project: Findings and Recommendations Regional Technical Forum February 3, 2009 Mark Cherniack Howard.
Learning, our way Daikin Europe, Consulting sales section1 Understanding Client’s Needs and best Daikin solution.
Standard Protocol Development for Advanced RTU Control Retrofit August 15, 2013 Presentation to: Regional Technical Forum RTUG Subcommittee Sponsored by:
Northwest Power and Conservation Council New Commercial Building Program Quest Presentation, Discussion and Decision of Proposed Approach to Estimating.
Roof Top Unit Overview (MAGNUM) Visit us at Revision- 12/17/2015.
Grocery VSD Measure Deemed Savings Reid Hart, PE & Ken Anderson September 28, 2010.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
PNW RoofTop Unit Working Group - RTUG – RTU Savings Research Project Phase 3 December 15, 2009.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
Water is the Natural Choice Hydronic Comfort Systems Increase and Maintain Building Efficiency For the Life of Your Building
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump Sub-Committee Road-Mapping Session BPA Energy Efficiency.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Performance Tested HVAC Presentation to the RTF January 5, 2010.
Metering Americas April 24, 2006 Advanced Metering.
Page 1 IceCold Pilot Study. Page 2 Pilot Candidate: Siemens 501 Fountain Parkway 32 RTUs provide cooling to 170,000 SF of Office and Production Spaces.
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Incorporating Energy Conservation Strategies into University Research.
Data Analytics – A Cost Effective Approach to Reducing Operating Costs Automatically “find what matters” in the data from building equipment systems and.
Transitioning to more Comprehensive Lighting Program Approaches Background, Program Drivers and Current Efforts Kate Baldacci, CEE Commercial Program Manager.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Performance Tested HVAC Presentation to the RTUG January 19, 2010.
© INTECHNICA Energy efficiency assessment Systematic Approach to Green Production Energy Efficiency Assessment Supported by: The sole responsibility.
ENERGY STAR OVERVIEW November Overview What is ENERGY STAR? History Accomplishments Key Strategies –Labeling –Superior Energy Management Building.
Fort Stanwix National Monument Energy Audit Contract
SNS COLLEGE OF ENGINEERING Coimbatore-107 Subject: Thermal Engineering
SNS COLLEGE OF ENGINEERING Coimbatore-107 Subject: Thermal Engineering
Transitioning to more Comprehensive Lighting Program Approaches
Energy Efficiency Saves Your Business Money
Variable Frequency Drive (VFD)
Coleman Commercial Product
ENERGY SAVING Product Offering
VITALITY Large Splits Johnson Controls PowerPoint Guidelines | July 21, 2009.
Enhanced Unitary HVAC Maintenance Tune-Up Program
WELCOME WELCOME.
Presentation transcript:

1 Roof Top Units Saving Energy and Improving Occupant Comfort Presented by Ethan Bellavance and Mary Jane Poynter

2 Presentation Outline Roof Top Unit (RTU) Overview- how do they work, key components Why are RTU’s so prevalent? What are problems with RTU’s How to improve reliability and reduce energy usage. Good, Better, Best Approach Results of Efficiency Vermont RTU pilot Conclusion

3

4 Roof Top Unit Components

5 Key Energy Components 1.) Compressors 2.) Supply fans, condenser fans 3.) Heat Source 4.) Economizer 5.) Crankcase heaters

6 Why are they everywhere? Simplicity – you can get it all (heating, cooling, ventilation) Readily Available Great option for leased space Low first cost option

7 University mall

8 Barnes and Noble

9 RTU Problems Out of sight out of mind Lack of maintenance Limp along attitude False sense of efficiency NBI - REVIEW OF RECENT COMMERCIAL ROOF TOP UNIT FIELD STUDIES IN THE PACIFIC NORTHWEST AND CALIFORNIA, 2004”; pg. 6

10 What can be done to improve them? We propose three options to fit numerous budget situations. 1.Good - Maintenance 2.Better – Advanced Controls 3.Best – New “Best of the Best” Unit

Average Costs of Approach 10 Ton RTU

12 Age Based Approach Applicability

13 The Good Approach Overhauling and maintaining your existing RTU Quarterly and yearly preventive maintenance Planning for failures and replacements What do you need to be looking for? Education

14 The Better Approach Add advanced controls to existing RTU Definition of advanced controls: VFD control of supply fan and compressor or supply fan only Advanced Economizer functions Fault diagnostics and web based interface We’ve worked with Digi RTU and Catalyst

15 How do Controllers Work? Note: You need a properly functioning RTU before a controller is installed.

16 The Best Approach: DOE Challenge Qualifying Units Install new “high efficiency” >18IEER unit Not cost effective if existing RTU is functioning properly and is well maintained. Best when replacing failed units or scheduled replacement due to end of life R22 phase-out will have an impact on the market take-up

17 Potential Energy Savings Compared to a code compliant 10 ton RTU 5,000 KWH savings/Year 30 MMBTU savings/Year $ /year operating cost savings Conservative Incremental Cost $8,000 Return on Investment 5-7 years

18 Efficiency Vermont RTU Pilot Results

19 Pilot Scope LocationSpace TypeRTU Size Range RTU Age Range Number of RTU’s Metered Vermont Country Store Mixed Use, Mainly Warehouse, some Office 8 to 2013 to 216 Vishay Light Manufacturing 10 to 151 to 125 Vermont Energy Investment Corporation Office8 to 302 to 103

20 What did we Find?

21 Inoperable Compressors

22 Compacted Coils

23 Corroded Contactors

24 Worn Belts

25 Things to Watch out For Services.jpg

26 What was the energy impact of the tune-up?

27 Controller Energy Savings per Ton

28 The Better Approach: Controller % Savings

29 Pilot Status Data will continue to be collected at phase 1 sites in Identification and metering of Phase 2 clients will begin in spring Installation of up to another 8 controllers in phase 2 Published results of all pilot locations

30 Conclusion Options for existing RTU Cost effective solutions Path to energy savings

31