Aerial photo of Sandy Beach Snow Farm Friday 2/27/15 Photo courtesy of Christian Cunnie/Chris Norton SNOW AND ICE UPDATE 3/3/2015.

Slides:



Advertisements
Similar presentations
Protecting Public Safety, Public Health, Public Assets and a Special Quality of Life FY08 Town of Sudbury Budget – Article 3.
Advertisements

Cambridge DPW: Technology & Snow Clearing Alice Yang, Nathalie Bloch, & Tyler Jaeckel.
Driveway Snow Windrow Removal Department of Public Works and Services Surface Operations Branch Transportation Committee February 15, 2006.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
INDIAN VALLEY COMMUNITY SERVICES DISTRICT. It is my goal to present to the Board, and Community, not only clear justification for this proposed acquisition,
Challenges and Consequences.  District was facing a projected $16,000,000 budget shortfall  Transportation was given 10 days to bring back $2,600,000.
Public Works Jack Petkus, Director Informational Overview.
Public Works Historical Staffing Levels  PWD Full-time and 5 Part-time  PWD – 22 Full-time and 4 Part-time 
Kirkway Homeowner ’ s Association 2008 Annual Meeting Welcome * Please pick up the ballot packet specific to your lot # September 25, 2008 at 7pm Kirkway.
Town of Franklin Department of Public Works Sidewalk Snow Removal Program January 6 th, 2009.
City of Peterborough Synergy of Trails and Sidewalks.
This booklet will be collected for a grade before the test. Algebra 1 Name: _____________________ Date: ______________ Pd: ____ Notes or Questions for.
Winter Road Treatments & Snow Removal Costs Outline.
“the process begins…” Disaster Planning Workshop Bristol, VT Prepared by: Tim Boutin Senior Planner Addison Regional Planning Commission WINTER STORM.
Multiple Performance Measures for Snow and Ice Control Rico Baroga Washington State Department of Transportation.
Whispering Meadows Home Owner Association 2015 Annual Meeting.
Winter Storm Response Presentation & Discussion. Winter Storm Response2 Storm Response – PW Mission “We strive for the safest roadways at a reasonable.
Public Hearing January 23, 2015 Top Kick Replacement.
Winter Gritting. Road Network in Barnet  Over 700 km of roads and 1400 km of footways in Barnet  Almost impossible to provide resources to deal with.
Confidential The Budget Presentation to the JCC By Eddie Teare MHK, Treasury Minister 18 February 2015.
New Visions Bicycle & Pedestrian Action Plan Bicycle and Pedestrian Transportation – Bicycle and pedestrian travel is vital to the region’s public health,
Blind Pass Project Update Bayous Preservation Assoc. February 9, 2011.
Executive Summary Snow and Ice Materials, equipment and labor were consumed to meet Department Target Regain Times for the five maintenance.
NAVIGATING THE STORM Disaster Debris Management March 2014 Ice Storm Chris Marriott Deputy Director – Field Operations Department.
MORAY COUNCIL - ROADS MAINTENANCE WINTER SERVICE ARRANGEMENTS WITH FARMERS & CONTRACTORS Bill Ross, Road Maintenance Manager, Moray Council.
INDIANA DEPARTMENT OF TRANSPORTATION Driving Indiana’s Economic Growth MDSS Implementation Team Maintenance Decision Support System (MDSS) Statewide Implementation:
1 Public Works Operations March 11, Streets – Street Sweeper Warranty repair in February resulted in about 5 weeks of downtime Streets are Dirty.
1 NTOC Talking Operations – Road Weather Management – September 30, 2008 Illinois DOT MDSS… a Smart Investment (Paul) Dean Kernan Illinois DOT Field Technician.
Decision Support Needs for Transportation Systems December 5, 2000 Emil Wolanin Montgomery County, Maryland.
The Science of a Blizzard By: Rian White and Jon Malloy T-5.
CAT Realignment and Reconstruction of Rt. 28A Town of Olive Ulster County, New York January 2009.
Snow Removal Information Robert “Brutus” Cantoreggi, Director Carlos Rebelo, Highway and Ground Superintendent.
If you fail to prepare, you are prepared to fail. Mark Spitz.
A World of Solutions North Topsail Beach Shoreline Protection Project Phase 1 – New River Inlet Channel Realignment & Beach Restoration NC Water Resources.
STA Safety Project PID #76439 December 12, 2006.
How do winter storms form? When cold air mixes with warm air A snow storm is usually very windy.
Allen County Sheriff’s Office -A Website Safety Tip – In conjunction with the Allen County Emergency Management Department of Homeland Security WINTER.
Olathe’s Snow Removal Program. Overview Snow Removal Policy Types of Routes Snow Route Information Site AVL units Complaint database.
NEP SUMMIT MINNESOTA CHLORIDE REDUCTION TRAINING Presented by: Andy Ronchak MPCA 5/10/07.
2014 Snow and Ice Program Kentucky Department of Highways.
McClain County Multi- Jurisdictional Multi-Hazard Mitigation Plan Update Image from
SNOW YEAR THRU  SNOW/ICE EVENTS 32  SALT RECEIVED TONS  SAND RECEIVED TONS  SALT AND SAND TOTAL TONS.
TOWN OF WESTON BOARD OF SELECTMEN’S BUDGET Fiscal year February 10, 2015.
Table Discussions 2015 SE Meeting. Scenario #1-Project Completion A $1 million bridge replacement project has a completion date of August 1 th. This date.
Public Works Overview of Winter Salt Usage. Our Equipment The City of Mankato's Public Works Department plows 432 lane miles and uses an average of 2,400.
Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Town Council Briefing Winter Storm Jonas: Jan
Alaska River Breakup 2016 Spring Outlook What we can expect? Crane Johnson, PE National Weather Service Welcome.
City of Joliet Anti – Icing/De-Icing Program MIKE EULITZ – ROADWAYS ENGINEER.
KY FEMA DEBRIS DOCUMENTATION Ice Storm extent.
Village of Fruitvale Financial Plan What is the Financial Plan? Financial Plan Background – To require planning for services – To maintain.
Department of Transportation Road Services Division Snow and Ice Response
State Route 342 Bypass and Realignment Solution Joint Effort of the Nevada Department of Transportation, Storey County, and Comstock Mining.
Public Works Roads Operations
Highway Safety in Winter Weather
With winter fast approaching, it’s time to start thinking about getting ready.  This year businesses across Scotland will be encouraged to consider if.
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Public Works Roads Operations
Green Energy and Green Spaces
COO Remarks September 19, 2016.
Date, location, department
Village of Shorewood Snow and De-icing Plan
Galt Court Water Main Replacement
Gunnerson Street Safety Project
Date, location, department
MESA COUNTY SNOW PLOW PROGRAM.
Department | Website | Phone Number
Name of Event Name of Event Date, location, department
NAME OF EVENT Name of Speaker Date, location, department
WINTER WEATHER EDUCATION
Presentation transcript:

Aerial photo of Sandy Beach Snow Farm Friday 2/27/15 Photo courtesy of Christian Cunnie/Chris Norton SNOW AND ICE UPDATE 3/3/2015

Sandy Beach Snow Farm as of Friday 2/27/15 DPW SNOWFARM STATS AS OF FRIDAY 2/27/15 DPW CREWS/CONTRACTORS TRANSPORTED OVER 2600 TRUCKLOADS OF SNOW FROM TOWN WAYS TO SANDY BEACH OVER 37,000 CUBIC YARDS WEIGHING OVER 10,000 TONS SNOW TRANSPORT OPERATIONS CONTINUE

Total January Overtime Hours per unit= 88 O.T. Hours Total February Overtime Hours per unit = 214 O.T. Hours Total Overtime Hours Between January 24 th and February 25 th = 302 O.T. Hours per man DPW has received 1000 tons of salt this winter Typical cap is 750 tons/ year

Phone Calls The Department of Public Works received just under 600 phone calls from residents requesting plowing, road widening and scraping, sanding, salting, and numerous other services between the dates of January 28 th – February 23rd There was a slight trend that private ways made more phone calls rather than public and accepted roads.

SCHOOL ROOF SNOW REMOVAL Engineering monitoring roofs since the first blizzard JANUARY 24 TH 2015 Week of Feb 2 nd received 3 snow removal quotes from vendors in the event action was necessary After 2 additional storms decided that the roofs were operating into the factor of safety for roof loading 2/10 – 2/18 - Contractors removed Approximately 840 Tons of Snow from areas of Schools roofs 560 Tons of snow from the Osgood School Roof 280 tons from the Middle School Roof Result was that NO school days were lost due to concerns over roof snow loads, and no damage was sustained MIAA giving insurance credit for pro-active roof snow removal

SNOW & ICE TOTALS TO DATE 3/3/2015 Expenditures ~ $440,000 to date Average winter expenditures ~ $250,000 Initial focus on widening main arteries and safe routes to schools Widening collector roads Major Intersections bank removal Left hand bank reduction Sidewalks Village business district snow removal Clearing paths to hydrants Clearing paths to catchbasins Spring is coming questions