Part I January 26, 2014. Income Pledges $150,000 47% Offering $33,200 10% Total$183,200 57% Endowment $75,452 24% Other funds $48,542 15% Total$123,994.

Slides:



Advertisements
Similar presentations
WBS-Construction of House (Example) WBS Dictionary
Advertisements

Why we need a new Building We are now a 1,000 member club. The current structure was designed to accommodate 200 (on its best day) The current.
Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
Or... What happens when Sponge Bob meets Bob the Builder??? 1.
Harding Elementary School Exterior Repairs & Select Roofing Replacement 08/12/2014.
With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen.
Update on FCPS Construction/Renovation Projects August 2009.
LEARN HOW TO SELL USING 203(k) LOANS With Tim Pascarella.
FHA 203K Streamline. Why FHA 203K Streamline? Through the FHA 203K Streamline program, borrowers can purchase or refinance their home and include the.
Cleaning out the stable for the girls. Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Church Renovation/ Expansion Proposals Willowdale.
Nick Bealo Proposed Eagle Scout Project.  Eagle Project from Plaistow Troop 18  Proposed 10’ by 10’ observatory  Cost for the school district $0.00.
The Dirt Lot Initiative This proposed project was part of last year’s Capital Project Improvement Plan There has been an obvious risk associated with its.
Inverters. What is an inverter? Inverters change Direct Current (DC) to Alternating Current (AC). Stand-Alone inverters can be used to convert DC from.
House Design Project Overview What each student must accomplish – 10 journals: date, time, weather, and what was accomplished or learned – Bubble drawings.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
ASSIGNMENT Begin on page 197 “The Foundation”.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
Maintaining Structural Integrity. Structural Integrity Before we can understand how to maintain structural integrity, we need to understand how homes.
Hinckley Baptist Church Sanctuary Refurbishment Proposals 2010.
Manistee County Library Master Space Plan December 2013 Quinn Evans Architects & GMB Architecture and Engineering.
Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Mt. Lebanon Public Works Facility Master Planning March 11, 2014 Update.
Framing the House. Platform Framing Platform framing.
Khulanathi “grow with us” Children’s home Khulanathi “ Grow with us”
Emmaus House of Saginaw 733 S. 14 th Street, Saginaw, MI The name “Emmaus” is from the Bible, Luke 24: In the Bible, it designates the.
Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014.
Access for All – The WMI Elevator Project What started as a dream several years ago is now becoming a reality. By the fall of 2010, the WMI will have a.
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Learning Objectives After studying this chapter, you should be able to: [1] Describe how the historical cost principle applies to plant assets.
F ACILITIES, P LANNING, AND C ONSTRUCTION December 14, 2015 – Monthly Construction Report.
Building. Goals Stay Downtown Keep Costs the Same Increase our Space.
Slide 23/ CH-NGO DRR Standard Shelter: Technical Requirements: Typhoon Resistance Resistance250 km/h sustained wind speed.
Chapter 38 Alternative Layout Techniques. Introduction Basic methods for drawing a section with a concrete slab and truss roof –Will not meet needs of.
House Construction.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Neutrino 1 Assembly Process. Neutrino 2 Assembly Process Step 1: Basement I beams positionned and fixed on the ground. Flatness checked.
Understanding the FHA 203K STREAMLINE AfterBefore.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
South Greenville Recreation Center and Park Master Plan.
Palisades Middle School: Fitness Center Board Presentation April 20, 2016.
CITY COUNCIL OCTOBER 18, 2011 Central Park Gazebo Replacement.
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
Pier Partial GMP Proposal for Marine Structural June 1, 2017
LenderSelect Mortgage Group Education for Renovation
Foundations of Technology Construction
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
HAMANASI Truss Installation Graphics February 2014
Partnership Gathering
Update on 440 Oakland Avenue Note Sale
Lecture on Plant Assets, Natural Resources and Intangible Assets
Partnership Gathering
Southern Lehigh School District
SJVRWRF Dewatering Building Corrosion Remediation
Objective 6.02 part 1: Recognize components of construction
14 High Leys Drive, Ravenshead, NG15 9HQ
Framing the House                                                                                                                   
Construction Management Option
Facilities Projects Update
Capital Appeal Pledges and Contributions
Foundations of Technology Construction
Capital Outlay Workshop
At ridge height for family room
Neutron guide Shielding Concept
Stoughton Public Library
Harp Place & Grindstone Pavilion Options
Presentation transcript:

Part I January 26, 2014

Income Pledges $150,000 47% Offering $33,200 10% Total$183,200 57% Endowment $75,452 24% Other funds $48,542 15% Total$123,994 39% Other income $13,325 4% Total Income$322, %

Pledge Analysis To date, we have 118 pledges for a total of: $135, of these are new pledges, for a total of: $ 9, of these increased compared to 2013, for a total of: $ 8,772 Total increase: $18, of these decreased compared to 2013, including one who moved, for a total of: $16,892 Net increase $ 1, pledges received last year are not yet in, for a total of: $30,165 If all 33 of these pledges are received the total would be: $165,165

Pledge Comparison: Breakdown of pledges by amount: Amount NumberNumberNew of Pledge of Pledgesof Pledges Pledges $0-$ $500-$ $1000-$ Sub-Total 111 ($66,068) 100 ($64,200)16 $2000-$ $ Sub-Total 22 ($95,292) 19 ($70,800) 2 Total 133 ($161, 360) 118 ($135,000)

Building Issues 1. Sag in floor of 2 nd level

Second Floor Repair Install two sets of posts and beam in sanctuary: one set where temporary posts and beams are one set midway between temporary posts and beam and wall behind the altar Install six concrete pillars in basement

Building Issues 1. Sag in floor of 2 nd level 2. Warped roof trusses 3. Side walls bowing out

Roof Repair Options Option 1 Repair roof by “sistering” rafters Build new walls next to current side walls Option 2 Remove roof and side walls Rebuild roof and walls

Building Issues 1. Sag in floor of 2 nd level 2. Warped roof trusses 3. Side walls bowing out 4. Outdated electrical wiring

Estimated Costs Option 1$124,000 - $128,000 Contingency $12,400 - $12,800 Total Option 1$136,400 - $140,00 Option 2$179,000 – $185,000 Contingency $17,900 - $18,500 Total Option 2 $196,900 – 203,500 Rewiring12,560; 18,000-$23,000; $50,000 ( Note: There is a $14,000 allowance built into Shea’s estimate for electrical ) Engineer fees$7,600 Architect fees$5,000 - $10,000 Total$156,600 - $257, Sidewalks$4500 Kitchen$10,000 - $130,000

Master Plan for Building What to do about the kitchen? We have a plan from several years ago. The cost of implementing it now is estimated at $130,000 Or we could just update appliances What else is needed?