Nick Bealo Proposed Eagle Scout Project.  Eagle Project from Plaistow Troop 18  Proposed 10’ by 10’ observatory  Cost for the school district $0.00.

Slides:



Advertisements
Similar presentations
Framing.
Advertisements

Construction Method, Material Selection & Building Services
AG BUILDING CONSTRUCTION. Unskilled / Semi-skilled Labor Skilled Trade / Craftsman Technicians Design & Management.
An Overview of the Production Process. -Stable Workforce -Controlled Environment -Less Waste -Repetitive Tasks -Lean Manufacturing Principles -Just-in-time.
Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
ICRA Panel System Installation Instructions
Architectural Drawing
Cleaning out the stable for the girls. Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them.
Eagle Scout Project 2014 Robert McKinney. The purpose of this Eagle Scout project is to give the Wood Ducks a safe nesting home away from predators and.
Part I January 26, Income Pledges $150,000 47% Offering $33,200 10% Total$183,200 57% Endowment $75,452 24% Other funds $48,542 15% Total$123,994.
Contec 10 Construction Technology Mr Shreenan TERM #1 Lockview high School.
This 12 part PowerPoint series is taken directly from Energy Savers Booklet, Tips on Saving Energy & Money at Home, U.S. Department of Energy.
Carl the construction worker has a problem. Carl needs to build a house for a family moving into the neighborhood. Carl’s boss gave him lots of tools.
Chapter 19 Floors.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Where in the World? -Our home is in New Jersey because the State of New Jersey gives generous rebates on top of the rebates granted by the US Government.
You have been selected to design a house in the following city in China: _________________________________________ You need to research houses that are.
Build an Equipment Building for Ski Venture. My building will house a small Groomer that is used to keep the hill in shape for Skiing and Snowboarding.
Construction Carpenter Vocabulary Created by The University of North Texas in partnership with the Texas Education Agency.
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
Eco-$mart, Inc Pre-panelized, steel reinforced, super insulated, poured concrete wall system.
PROPOSED EAGLE PROJECT BY TYLER BOOTH Installation of Raised Garden Beds At Timberlane Regional High School 1.
Graphic Communication
RESIDENTIAL CONSTRUCTION UNIT Grade 10 Construction Technology TCJ200.
Elementary Principal’s Report December 12, Book Fair Open during the week of Parent-Teacher Conferences (October 24-27) Total Sales - $3,
By: Caleb VanderWal.  Mix cement  Dig hole at least 24” into the ground  Poor cement in ground with poles  Wait 2-3 days (if you don’t wait that long.
Chapter 25 Framing Methods. 2 Links for Chapter 25 Balloon Framing Platform Framing Post-and-Beam Framing Related Web Sites Steel Construction Concrete.
Building Plans.
Michael Kruse Chance Guthrie If we use the money wisely then the specifications of the house will be met. And we could build a house that meets the requirements.
1 MME3360b Assignment 04 10% of final mark 6 problems, each worth 16.7% of assignment mark Due April 9 th, 2012.
Wood Construction CTC-375.
Passive House Seminar for Professionals from the Building Sector.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
ROOFING MATERIALS, INSULATION, AND HOUSING SYSTEMS.
By, David Sessions. Buildings come in many shapes and sizes The tallest buildings in the city are called skyscrapers.
Personal Slab Box. What is a Personal Slab Box Personal-should tell the viewer something about the artist Slab-made from slabs Box-a container with a.
Green Homes Nancy Sierra Nicholas Acuavera 1A
Technical department - boclair academy Layers used in a cad system INTRODUCTION A CAD drawing can be built up in several layers (like clear film overlays)
Meditation Pavilion Eagle Project Tim Wolfe Troop 125.
Chapter 28 Structural Components of Framed Construction.
The Eagle Scout Project – What to Plan When to do it Who to contact.
Solar Energy Home Tour A preview to our local field trip.
House Design Project Name: __________________________ You have been selected to design a house in the following city in China: _________________________________________.
Residential Construction
Orthographic Drawings
Patrick Radford Troop 18, Plaistow, NH.  Build a teaching circle for Pollard Elementary school.  A teaching circle is an area where students can gather.
Nick Bealo June 19,  For-Credit Classes  HS Physics  HS Physical Science  HS Space Science  MS Science  Elementary School.
2006 Oct. 19 DES Project -- Vaidas Simaitis, University of Illinois1 DHE – Detector Head Electronics Monsoon 80mm Crate Heat Shield.
The Little Ann Assembly Instruction By Laser Dollhouse Designs.
How To Make The Castle Himeji. Step 1 Draw a a bid rectangle the size of 40 feet with the rectangle tool Step 2 in one of the sides of the rectangle draw.
Computer Science I More 3D examples. Classwork/Homework: experiment and design, plan, complete your 3D project.
ALOK SANCHETI EAGLE PROJECT BOARD CHAIRMAN District Eagle Project Approval.
Shelter Cluster Somalia ShelterCluster.org Coordinating Humanitarian Shelter Building Back Safer PILOT PROJECT KISMAAYO 1 Building Back Safer.
APPLICATIONS OF TECHNOLOGY
Flagler County - Princess Place Preserve Riding Stable Restoration Tourist Development Council December 16, 2015.
APPLICATIONS OF TECHNOLOGY
Tucson Amateur Astronomy Association
Designing a Commercial Shopping Center
Single Family Homes Townhouses Condominiums Mobile Homes Rentals
Solar Insulation Principles
Progress Report 11/10/11.
Unit 8 Floor Framing.
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Vocab. Vocab Wall Layout Floor Layout Ceiling Layout.
© OnCourse Learning.
Floor Joists 4/11/10.
Facilities Update Garden Grove Unified School District
Presentation transcript:

Nick Bealo Proposed Eagle Scout Project

 Eagle Project from Plaistow Troop 18  Proposed 10’ by 10’ observatory  Cost for the school district $0.00 Boy Scouts will be raising all funds  TRSD responsible for any electrical work if they decide it is useful  Timberlane HS will be the owners of the observatory once it is complete

Mr. Hughes will determine exact location

 This is Sweet Hill Observatory owned by Peter Bealo (my dad) A 12’ by 16’ observatory  The Proposed design would look much like this design with a roll off roof  The observatory will be built with the roof rolling off to the north  Capable of holding TRHS’s current telescopes

 Each side of roof rolls on 3 V-grooved iron wheels  Wheels ride on angle iron tracks  Tracks are on 6X12" wooden beams TRHS version would use smaller beams due to roof having <1/4 the weight  Posts holding end of beams are 6X6“

 TRSD Requirements Mr. Hughes to approve final drawings No windows, for security  General Observatory Requirements Roof rolls off to the north  Obstructs fewest number of interesting celestial objects No insulation or heat source inside to keep it at ambient temperature Part of floor that telescope sits on is isolated from where people walk to avoid vibrations

1. Approval by High School 2. Find school liaison – Mr. Hughes 3. Approval From School Board 4. Approval From Boy Scout Yankee Clipper Council  Estimated Completion Time: End of Summer of 2013 In Time For The Beginning Of The School year and to see Comet ISON due on December!  Estimated cost: If stick built (worst case): ~$4,000

 If basic shed is donated by shed supplier: modify roof, add tracks, install  If wall units donated by shed supplier: assemble, assemble roof and track system  If stick built: assemble floor, walls, roof, install in place  Material/ Tradesman needs Shed, wall units or lumber, concrete for sonotube foundation Welder willing to tack weld several 20’ angle iron runs

INTERIORTHE ROOF ROLLED OFF