Throwing Teddy Bears Off The Roof EE3GP Group Project 30 credit compulsory module (MEng 3 only) Coordinator: Dr Costas Constantinou Supervisors: Dr Costas.

Slides:



Advertisements
Similar presentations
An Overview. Worth 40 credits – thats one third of the whole final year! Worth even more than that really … Its used to determine borderline awards Nobody.
Advertisements

Joint Final Year Project 20011/12. Joint FYP Project tutor – Martin Paisley Martin is currently away from the university so in the meantime this role.
ECE 4334: Capstone Design Fall 2009 Welcome ! Facilitator: Dr. Len Trombetta.
An Overview.  Worth 60 credits – that’s one third of the whole MSc!  Worth even more than that……..  It is used to determine final awards  Nobody gets.
Final Year Project COMP39X COMP390/3/4/5 Final Year Project Demonstration & Dissertation Irina Biktasheva
1 Faculty of Public Health Continuing Professional Development Scheme.
Recent Changes to HDR Policy and Procedures Felicity Roddick Associate Dean Research and Innovation.
Presented by CHUI Tsz Leung, Danny Mobile Phone off or Silence Mode; Keep Quiet; No photo. Thank You! Final Year Project 2013 Page 1 Final Year Project.
School of Electrical Engineering & Computer Science Final Year Projects Final Year Project Coordinator – Newcastle Laboratory Manager - Newcastle Gunilla.
introduction to MSc projects
School of Electrical Engineering & Computer Science
The Luggage EE3GP Group Project 30 credit compulsory module (MEng 3 only) Coordinator: Dr Costas Constantinou Supervisors: Dr Costas Constantinou, Dr Peter.
RAISING ASPIRATIONS Work Experience Programme 13 th – 17 th July 2015.
M.Sc Projects David Wilson M.Sc Projects Coordinator for Computing & Information Systems.
1. What is this course all about?. Learning objectives All students will organise their folders All will understand what the structure of the course is:
School of Electrical Engineering & Computer Science Final Year Projects Final Year Project Coordinator – Newcastle Laboratory Manager - Newcastle Gunilla.
Risk Assessment – An Essential Standard
COMP 208/214/215/216 LECTURE 1 Introduction 恭喜發財.
Job Hazard Analysis Development
Module Code CT1H01NI: Study Skills For Communication Technology Lecture for Week Autumn.
Practical Placements & the QAA and ASET Guidelines By Ian Sunley & Lorna Uden Faculty of Computing, Engineering & Technology, Staffordshire University,
A Vision Guided Car For Obstacle Avoidance EE3GP Group Project 30 credit compulsory module (MEng 3 only) Coordinator: Dr Mike Spann Supervisors: Dr Ed.
Taking stock and moving on Dissertation workshop Friday 28th November, 2008.
Science Olympiad Summer Institute 1 Presented by Dennis Papesh
CEG2720 CEG3707 GEOMATICS PRACTICE & RESEARCH Aims – to reinforce personal and career development – to link academic and ‘real world’ geomatics – to develop.
Overview report of a series of FVO fact- finding missions and audits carried out in 2012 and 2013 in order to evaluate the systems put in place to give.
From the Initial Idea to the Finished Product. How to Produce an Effective Essay.
MEng projects 2014 Introduction Mike Spann Project coordinator
INTRODUCTION TO ATHLETIC MEDICINE TRIMESTER PROJECT.
MSc projects 2013/2014 Induction session Dr Mike Spann M.Sc Project Director
Clinical Education Electives Pam Shaw MD
Successfully recording Continuing Professional Development.
EE3GP Group Project 30 credit compulsory module (MEng 3 only) Coordinator: Dr Mike Spann Supervisors:
Confirmation of Candidature Progress Reports
1 First Briefing HKDSE 2015 Information and Communication Technology School Based Assessment.
Welcome to English! Rules and Expectations By the end of this lesson, I will be equipped with all of the information and equipment that I need for a successful.
MSc projects 2014/2015 Induction session Dr Mike Spann M.Sc Project Director
COMP 208/214/215/216 – Lecture 8 Demonstrations and Portfolios.
EE3GP Group Project 30 credit compulsory module (MEng 3 only) Coordinator: Dr Costas Constantinou Supervisors: Mr Philip Atkins and Dr Costas Constantinou.
ACS Project Briefing 2 nd December 2009 Steven Hand.
Energy Savings Opportunity Scheme Martin Adams, ESOS Team Leader.
Internal Controls and Accounting Systems (ISYS)
CVEN Coursework Masters Plans Hossein Taiebat Postgraduate Coordinator School of Civil and Environmental Engineering.
MEng projects 2013 Introduction Mike Spann Project coordinator
Policy and Procedures Ian S Burnett Student Research Culture Session – 29 April 2009.
Specialist Associate CESR Evaluation Day
Intro to Exam System Dr Mike Spann May 3 rd 2011.
Software Project Management
Safety Audits An essential tool for active safety management April 2015 Dr Emer Bell Integrated Risk Solutions.
What are sponsors looking for in research fellows? Melissa Bateson Professor of Ethology, Institute of Neuroscience Junior Fellowships.
Task Carry out routine maintenance of equipment and machinery.
1 Westwood Catapults 2014 Elliot Rose March 19, 2014
ICT Course Calendar and Personal Learning Checklist
COMP390/3/4/5 Final Year Project Introduction & Specification
Dr. Marcos Esterman Faculty Guide W. Casolara Project Leader
COMP390/3/4/5 Final Year Project Introduction & Specification
COMP390/3/4/5 Final Year Project Demonstration & Dissertation
What are sponsors looking for in research fellows?
PowerPoint® Slides to Accompany
THE EPQ How will it help you?.
COMP390/3/4/5 Final Year Project Demonstration & Dissertation
Coordinator: Dr Mike Spann
COMP390/3/4/5 Final Year Project Design
Level 2 Single Honours Module Allocation Procedures Meeting
Monday, October 5 Today – write in your agenda
COMP390/3/4/5 Final Year Project Demonstration & Dissertation
COMP390/3/4/5 Final Year Project Introduction & Specification
COMP390/3/4/5 && COMP593 Final Year Projects Demonstration & Dissertation Irina Biktasheva
COMP390/3/4/5 Final Year Project Demonstration & Dissertation
MEng projects 2012 week 10 update
Presentation transcript:

Throwing Teddy Bears Off The Roof EE3GP Group Project 30 credit compulsory module (MEng 3 only) Coordinator: Dr Costas Constantinou Supervisors: Dr Costas Constantinou and Mr Phil Atkins

Aims & Objectives  Hard science; no spoon-feeding  Advantages & disadvantages of group working  Mature from a group into a team  Develop initiative –both the task and process are only very loosely defined  Introduce essential new skills not covered elsewhere –research skills –using data books –using new microprocessors –etc.  Learn to search for information in libraries & other repositories –distinguishing between reliable and unreliable sources of information

Academia vs. “real world”  GP reflects real-world job experience for engineers –No on choice on who is in “your” group –Failure of social dynamics (e.g. finger-pointing, finding scapegoats, etc.) = failure of group project (& whole degree) –You have to work to a budget –You have to work to deadlines –“It works” is not good enough – your product will have to compete with others –You have to deal with a “customer” who knows what he wants but won’t pin in down to a specification  Performance criteria same as those applied to professional engineers

Useful information  Your laboratory is in room N.216 (UG project laboratory) –hot-benched, no specialised hardware and software provided  Budget of £1200 per group  No other useful information!

Dates for your diary  1 st field demonstration & 1 st presentation Wed, 5 Dec 2012 (wk 11, autumn)  Interim group report + CVs 12 noon, Fri, 7 Dec 2012 (wk 11, autumn)  2 nd field demonstration & 2 nd presentation Wed, 20 Mar 2013 (wk 11, spring)  Final group report + CVs 12 noon, Mon, 8 Apr 2013 (wk 3, Easter)  Poster (project open day) + Mark apportionment Thu, 25 April 2012 (wk 1, summer)  5%  10+10%  67.5%  2.5% (peer)

Don’t  Plagiarise  Produce “hot air”  Rely just on powerpoint for presentations  Exceed submission page/word limits  Submit late (–5% per day)  Break any law: –health and safety –radio transmissions –laws I haven’t thought of!  Comply with ethical review guidelines

Mark apportionment  Read Appendix C of the project handout very, very carefully indeed  Marks must be accompanied by justification of apportionment to be given to external examiners  If you decide to deviate significantly from the suggested procedure you must seek my approval for your scheme

Rules  Keep the entire exercise legal  Please respect university property and grounds  Keep radio transmissions compliant with UK spectrum usage laws  During outdoors work and/or demonstrations wear sensible shoes and clothing  Perform a real risk assessment and stop other members of your team from getting into trouble  No other rules at this stage, but we reserve the right to make changes or add to these rules until noon of Friday week 2 of the Spring term

The 2012 – 2013 Project Throwing Teddy Bears off the Roof

 You are required to design, prototype and demonstrate a system comprising –a launch subsystem that can be operated by a member of staff on your group’s behalf on the roof of the Gisbert Kapp building, –an autonomously steerable “flying” teddy bear (max. descend speed of 1 m/s), and –a homing signal subsystem surrounding a target of 1 m in diameter on the ground  No other information will be given to you

Throwing Teddy Bears off the Roof  The launch subsystem must be: –100% safe to operate –sufficiently lightweight and compact for one person to carry (i.e. weigh no more than 10 kg and its dimensions should not exceed 30 cm x 30 cm x 200 cm); the assessors are likely to be more impressed by light-weight solutions –capable of being operated by a person standing at least 60 cm away from the roof railings –operated without the need for accurate pointing at a particular direction –operated through the push of a simple button

Throwing Teddy Bears off the Roof  The teddy bear must be: –autonomous –capable of landing on the target without suffering damage over repeated launches –capable of being remotely put into an emergency “landing” mode to ensure that in the event of strong wind gusts it does not drift outside a predetermined cordoned off area at the back of the Gisbert Kapp building and presenting a risk of colliding with any humans or objects –limited in the maximum terminal-velocity it can reach to 1 ms –1 and this value may only be exceeded in the first 2m of descent following launch  The homing signal subsystem must be: –wireless or passive –battery powered

The teams Group A: Supervisor PRA TitleSurnameInitial(s) Mr Aleem R Mr Bagherigolroodbari A Mr Hosseini Sohi SA Mr Jahanian H Mr Mahari M Mr Sperin K

The teams Group B: Supervisor CCC TitleSurnameInitial(s) MrAmarY MsBaharaliP MrLewisC MrMashhadi Hossein KhabazM MrMoazM MrWillettsB

Good luck!