Big Green eMachine concept pictures on

Slides:



Advertisements
Similar presentations
Nashville MTA: Safety Bob Baulsir Metropolitan Transit Authority General Manager of Administration Nashville, TN.
Advertisements

Create an action plan for Your desk! Why does this matter to me? Return to Jims Desk Hints Don t read This either Do not read this Don t read This either.
Installing Doors & Frames Ref: Handout / Text M. S. Martin Sept
Big Green Office Space ?. door driver passen ger Space with straight tables 11 students max Space required for one person-table with laptop & mouse pad.
Montgomery County Fire Rescue Medical Ambulance Bus 20 Patient Capacity.
17-Point Truck & Trailer Inspection  1. Bumper  2. Engine  3. Tires (truck & trailer)  4. Floor (inside truck)  5. Fuel Tanks  6. Cab/ Storage Compartments.
Accelerate Your Business RP IaaS (Infrastructure as a Service) IaaS.
What are some renewable energy resources?
2 3 4 One of the most common type of workplace injuries is those incurred from manual handling. To prevent manual handling injuries an employer needs.
General idea of a couple of check rod system and adjustments
ERU WATSAN SPANISH RED CROSS Water Treatment Plant SETA.
5.8m Solar House Installation Instruction. Introduction Step 1. connect the corner panels Step 2. connect the back and side wall panels Step 3. Install.
SOLAR POWER BY KENJUEN SWAN.  Solar energy is radiant light and heat from the sun harnessed using a range of ever-evolving technologies such as solar.
Chapter 12: Alternative Technologies To be used with the Guide to Building Energy Efficient Homes in Kentucky.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
PUMP. AUTOMATIC WATER LEVEL CONTROL HARD WIRED PUMP AUTOMATIC WATER LEVEL CONTROL WITH INDICATOR.
By: Amy Simon  What happened to my student’s project?  Why can’t I access my lesson in the computer lab?  I know I saved it… somewhere…  WHERE DID.
Hollywood Central Park BTF Consultants “Building the Future”
Engineers Without Borders H&S Presentation
By David Chavez Wireless Laptops in Classrooms. Going Wireless! If you've been in an airport, coffee shop, library or hotel recently, chances are you've.
Solar Energy: The Ultimate Renewable Resource. What is Solar Energy? Originates from nuclear fusion reactions in the sun Originates from nuclear fusion.
THIN CLIENT COMPUTING USING ANDROID CLIENT for XYZ School.
The European Office Building S.H. Liem, A.H.C. van Paassen M.Verwaal, H.F. Broekhuizen Delft, April 1998 S.H. Liem, A.H.C. van Paassen M.Verwaal, H.F.
Solar Home Lighting system. DESCRIPTION A distributed energy access model High efficiency electronics Can be assembled and customized by both large and.
Click on picture  Save nonrenewable sources  Stop global warming  Better environment  Clean  Efficient and easy Click me.
Engine House Number 10 Our Trip to the Fire Station Our Lady of Peace Kindergarten April 28, 2009 Ms. Susan GruberMs. Jill Stock.
Messengers of Peace. Team Mahatma Gandhi Challenges Connectivity Language Electricity Skill Financial Crisis.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
COGNIZANT TECHNOLOGY SOLUTIONS PRIVATE. LTD Monthly Review Meeting – August 2008.
Hit PAGE DOWN to go faster or to move to the next slide. Use PAGE DOWN or PAGE UP to move forwards or backwards in the presentation. Hit PAGE DOWN to continue.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Technology Update October Bring Your Own Device (BYOD) Different stages of implementation (contingent on wireless infrastructure) Full School Partial.
HP Technical Support Toll Free Number Support For HP Computer, HP Laptop & HP Printers.
Big Green Internal dimensions ?. Table for 1 door driver engine box Table for 2Table for 3 Bench for 2 passen ger Bench for 3 Table for 1Table for 4 Space.
Student Services Strategic Action Plan Agenda Norms Defining Strategic Actions District, Campus and Division integrated planning Title V Projects.
Mine Fresh Air Base.
Campus Network upgrade and Wi-Fi Rollout REVIEW AND PHASE 3 PROJECT MANAGER TASKS.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
Lab design Assignment 3 Unit 2.
Prerequisite Office 2013 has OneDrive already installed, no action required If still on Office 2010, you will need OneDrive installed on your machine.
Survey Conducted at Jim Green Residence. According to given feedback, tenants are encountering connectivity issues as regards to their Wi-Fi connection.
Electrics. Solar Energy Solar water heater Efficient way to heat water at no cost all year long. Work by running copper pipes through a solar panel on.
Alternative Energy House Mr. Gillespie’s Version.
Types of Buildings for Explosives Storage MA02 Slide 1.
Montgomery County Fire Rescue Medical Ambulance Bus 20 Patient Capacity.
Ergonomics When something is ergonomic it provides optimum comfort, as well as minimize stress or injury. It is supposed to make the working environment.
Using existing lifts in existing buildings to evacuate disabled persons Derek Smith Technical Director UK Lift and Escalator Industry Association.
Enterprise | education | public printing locations PrinterOn for Manufacturing.
Air condition installation
We provide online Printer Repair services for Brother. Set-up, install and configure brother printer by brother printer customer support expert.
Strong room Vaults How do vault doors work  Strong room vaults are a kind of safes meant to protect your valuable assets from burglary, theft and fire.
Mobile Computer Lab Student Training. The Wireless Solution Wireless labs… increase access to existing and emerging technology resources offer the flexibility.
CHROMEBOOKs Are not Magic Teachers Are!
TECHNICAL SPECIFICATION AND REQUIREMENTS
SBN Far Detector Installation & Integration
UNIT-III MAINTENANCE OF SAFETY
INSTALLATION SEQUENCE
Capital Improvements Presentation
A Power Reset is one of the best methods to fix lots of problems associated with your HP laptop, like Windows not.
How to Change Etisalat Wifi Router Password Call
Brother printer drivers Toll free
ProLine & ProLine+.
CHROMEBOOKs Are not Magic Teachers Are!
Administrative and security issues
ActivRAC® Layout Considerations
February 2019.
A Problem Solving Approach Using Case Studies
Manufacturer and Exporter
USING ENERGY 5.1 ENERGY AROUND US.
Presentation transcript:

Big Green eMachine concept pictures on October 2010

2 Goals of the Big Green Around Chintsa there are 3 classrooms with around a dozen of computers to teach IT to children / adults where there is no access to computer / internet There are other places around to teach IT but there is no classroom and many people cannot come to the IT classroom The Big Green will be a remote mobile computer school The Big Green should be autonomous regarding electricity with solar panel to work 5 hours a day Initial donations come from Hungryman to be able to start the project, many thanks to them

3 Different parts to focus storage opening roof Battery (opposite side) solar panel Office space

4 door driver engine box Table for 2Table for 3 Bench for 2 passen ger Bench for 3 Table for 4 Bench for 2 Hinged Table for 4 Hinged Table for 3Hinged Table for 2 Office space More informations on the document « Big Green – Office Space » Fixed table for 1

5 Storage (1/2) Space for : –Wireless switch (wi-fi) –Router (3G/GPRS or Satellite) –Printer –Power management console for solar –Possible storage space for laptops during transit 1 case for 4 laptops Removable to take off the Big Green when parked Router, printer, wifi need to be locked and removable

6 Storage (2/2) If the laptops could be stored in an alternative place during transit, the central area could remain open; creating a more airy feel during teaching. The space within the two side areas should be sufficient for other needs.

7 Opening roof (1/3) Current roof height is 165cm More height is required to be able to teach for 5hrs Solution to move the whole roof seems to be complicate Bars to be removed = structural risk, but already done on Big Green brother (same truck with an opening roof) Protection to install as there are risks to knock your head Need water-tightness

8 opening roof (2/3) Opening roof Bars to move FRONTFRONT Space where there is the engine box = no opening roof New place for bars moved Bars to change (increase strength) Bars to remove Bars to keep in place

9 opening roof (3/3) Solar cells Solution for tightness Solar cells Bars like the roof (welded) Solar cells Gas lift

10 Battery Good space to install could be below the floor on the right side (opposite side to the engine battery)

11 Solar panel Possible with financial support Study structure requried Heavy : 170 kg Rotate on the roof to be more efficient (~30°) Take the whole length of the Big Green (no water tank) Can be fixed with 2 pistons

12 Remarks It would be possible to get more laptops outside of the Big Green (later phase) Fixation on the back to avoid movement / balance when moving inside the Big Green

13 Few pictures We would be happy to get your opinions, advices. Feel free to us at : For more information regarding the organisation, go to or