1 Water Services Planning J.McGowan Senior Engineer May 2014 Kildare County Council Water Services.

Slides:



Advertisements
Similar presentations
Contractor Management. Struggling with Contractor Management ? ? ? Getting purchasing on board? Specifically stating environmental compliance in contracts?
Advertisements

LOCAL IPP REGULATIONS SEWER USE ORDINANCES Sandra Diorka Director of Public Services Delhi Charter Township.
Shaping the Future of Water Services Implementing the Vision for Irish Water Dr. John Tierney Managing Director Irish Water.
Adapting the city. Water Infrastructure & Climate Change Chris Matthews.
Presented to the Connecticut Association of Water Pollution Control Authorities | April 26, 2013 Community Systems 101 Presented by Thom Knowlton, P.E.
Northern Ireland Water QUESTOR Centre, QUB. Introduction: UK Water Industry 25 water companies in England & Wales 12 water and sewerage providers 13 water.
Welcome “Sewers – The Key to Hauppauge Revitalization: The Next Economic Boom ” 1 June 23, 2010.
Mobile Washing Policy Florida Statutes Section contain the basic requirement for DEP regulation. Must be a stationary pollution source, such as.
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
0 Scoring Community Development Block (CDBG)Grants Water/Sewer Apps April 8, 2013 SEIRPC CDBG Scoring Committee.
Environmental Monitoring & Protection Unit
Brown County Planning and Land Services Zoning Bill Bosiacki 305 E. Walnut St. Green Bay WI (920) Website:
Development Contributions Witzenberg Municipality 30 October 2013.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Planning Permission Process and Procedures
Comhairle Contae Maigh Eo Mayo County Council PERMITTING OF ENERGY PROJECTS A Local Authority Perspective Iain Douglas Senior Planner Engineers Ireland.
Experience with SuDS in Dublin December 2007 Padraig Doyle Senior Project Manager Mott MacDonald Pettit IEMA Conference Are SuDS the answer for drainage?
1 Water Services Training Group 16 th Annual Conference Water Sector Reform Programme Implementation INEC, Killarney, 8 th November 2012.
Renfrewshire Council Interreg III B NWE Urban Water Project Strand No 3 Spatial Management of Water Infrastructure Regeneration.
National Urban Waste Water Study (Covers catchments with a population equivalent of 2,000 or more outside the Greater Dublin Area) Department of the Environment,
Shaping the Future of Water Services
The Impact of Economic Regulation Cathy Mannion Director Water Commission for Energy Regulation Local Authority Services National Training Group Conference.
The Status of Water Services in County Galway A presentation to the Joint Committee on Environment, Transport, Culture and Gaeltacht 27 th September 2011.
BUILDING AND DEVELOPMENT CONTROL Willie Hannigan.
1 Innovative Use of Administrative Order Authority Management, Operation and Maintenance (MOM) Program.
Developing a Waste Water Discharge Fee Programme in Sri Lanka Kolitha Himal Muthukuda Arachchi Deputy Director General, Pollution Control Central Environmental.
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
Municipal Tax Increment Financing
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
Development Management Objective to promote proper planning and sustainable development and adopt a pro-active approach towards development that accords.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
Table 3 SWMI – Water Matters –Topics – 1Dangerous Substances 2Forestry 3Septic Tanks (Unsewered Properties) Shannon International River Basin District.
1 Water Services Planning J. Mc Gowan Senior Engineer May 2015 Kildare County Council Water Services.
FOG Guidance Document Launch Seminar 26th January 2012 Water Services Training Group Guidance Document Control of Fat Oil and Grease Launch Seminar 26.
Providing world-class services for our customers and our environment March 2014 Stormwater Costs of Service and Rates.
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
WSNTG Annual Conference 8 th September 2005 WSNTG 9 th Annual Conference “Water Services Strategic Plans – Fact or Fiction”
Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Water Services Training Group 13 th Annual Conference 10 th.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
1 Water Services Training Group 17 th Annual Conference Creating a new Irish Water Industry INEC, Killarney, 5 th September 2013.
every five years water and sewerage companies submit their investment plans to the industry regulator Ofwat this is known as the ‘Price Review’ the next.
1 Water Services Training Group 19 th Annual Conference Optimising Services Delivery in the Water Industry Radisson Blu Hotel Sligo, 3 rd. September 2015.
Board of County Commissioners PUBLIC HEARING June 8, 2010.
Infrastructure management system Managers and engineers need clear guidelines for life-cycle management of infrastructure systems for water, sewer, and.
SuDS Approval Bodies. Floods and Water Management Act 2010 The Flood and Water Management Act 2010 received royal assent in April 2010, and it implements.
Environment SPC 24 th June 2015 Draft Dublin City Development Plan
1 Water Services Training Group 17 th Annual Conference Creating a new Irish Water Industry INEC, Killarney, 5 th September 2013.
Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Water Services Training Group 13 th Annual Conference 10 th.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
WSNTG Annual Conference September 2007 Water Services National Training Group 11 th Annual Conference 6 th September 2007.
Sewerage Infrastructure Development in Sarawak
Work Session Water Issues and Water Rate Study Topics: Fundamental Assumption Key Issues Areas of Concern / Focus Water Audit Water Meter Audit Water Rate.
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
@ContentsExecutive Summary Annexures A M A J U B A Umkhandlu Wesifunda District Municipality Distrik
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
Nwlpp Northumbrian Water Limited 9 October nwlpp Flooding - water company perspective Geoff Hartis Sewerage Operations Manager.
Briefing regarding the new State General Stormwater Pollution Control Permit.
1 Water Services Training Group 20 th Annual Conference Meeting Standards and Expectations in the Water Industry Lyrath Estate Hotel, Kilkenny.
Asset Degradation Modelling at Townsville Water
Hampden Township Stormwater Management Program
Prioritising Capital Investment Achieving a Balance
Economic Regulation of Irish Water
Progressing a Single Water Utility Approach
Perceptions, Challenges and Opportunities around SuDS in Ebbsfleet
Agents’ Meeting 22nd May 2013 Agenda Introduction Forward Planning
Developments in our water sector policy
SEWER SERVICE FEE RATE STRUCTURE ALTERNATIVE
Coursework guidelines
Presentation transcript:

1 Water Services Planning J.McGowan Senior Engineer May 2014 Kildare County Council Water Services

2 Water Services - Assessment Water supply Foul sewage Surface Water Flooding J. McGowan SE B. Rea SEE A. Dunney EE

1 st January 2014 IRISH WATER National Authority - Water & Wastewater Statutory body – responsible for all services – Budget Capital & Operations – Customer Complaints - work orders – Metering and Billing - Domestic and Commercial Local Authority - agents under Service Level Agreement Irish Water monitor KCC performance under ASP 3

IRISH WATER - Planning Statutory Consultee - under Planning Act – Application for permission – Planning approval – Applications to An Bord Pleanala KCC refer Planning files to Irish Water WS Dept in KCC continue to assess planning applications and submit observations to Irish Water Irish Water will submit formal response to Local Authority 4

IW - Standard Conditions The following conditions to be attached to all Planning files 1. Where the applicant proposes to connect to a public water/wastewater network operated by IW, the applicant must sign a connection agreement with IW prior to the commencement of the development and adhere to the standards and conditions set out in that agreement. 2. In the interest of Public Health and Environmental Sustainability, Irish Water Infrastructure capacity requirements and proposed connections to the Water and Waste Water Infrastructure will be subject to the constraints of the Irish Water Capital Investment Programme. 5

Pre-Planning Protocol - Connections KCC & IW - jointly manage statutory consultations KCC to advise IW where significant impact – attend – Advise applicant of any issues – subject to confirmation – Meeting between applicant and IW without Planning Dept present is outside scope of statutory planning process. – IW take internal minutes in relation to water issues If Potential Applicant requires a connection to IW network – KCC advise applicant to make contact with IW - if significant ! No development to take place until developer obtained a Connection agreement from Irish Water. 6

New Connection Agreements KCC as an agent for IW shall – Manage and act as main point of contact for Customer – Application forms can be downloaded from KCC website Completed application forms from developer – Should be returned to KCC - sent on to IW ( inc OS Maps ) IW will send out quotation & connection offer to customer – Connection fees, Payment method, Validity duration – Conditions, Direction to specifications, Instructions for works Water and Wastewater Development Charges – KCC will no longer levy such charges – will be part of connection charge if applicable KCC will process Road opening licence separately 7

8 Submission – Pre planning Pre Planning meeting - Site location map  Scale of development  Availability of services  Proposed flows / demand  Need for Flood Risk Assessment – submit if required Application to include  Design calculations  Pipe sizes, Pump stations etc  Drawings – services - on site & connection to outfall  Capacity of existing network – constraints  Longitudinal section – sewers SW pipes  Wayleave agreements as necessary

9 Water Supply Public supply – Metered – main & service – Min 24 hour storage - on site – Housing Estate min 100mm - looped Private supply – Water quality tests - HSE – KCC ground water Source Protection Policy Water Conservation – Dual flush systems, - Rainwater Harvesting – Water audit & leakage survey – Taps with water conservation mechanisms

10 Waste Water - Sewerage Connect to public supply  Only foul waste not surface water  Gravity or rising main  Drawings – Longitudinal sections etc Pump Station  New standard specification – KCC website - access, overflows, flow recorder, standby generator, dosing - septicity etc  Pre Planning meeting advised Waste Water Treatment plant  Licence / Regulation  Policy in Development Plan  Design/Construction standards – future maintenance  Pre planning meeting advised

11 Surface Water Drainage Storm Water Management Policy - GDSDS – Design & construct & maintain – Sustainable Urban Drainage Systems – SUDS – Attenuation – On site storage systems – 1 :100 year storm event – Post development flows not to exceed green field runoff Design – Min pipe size 225 mm – Return Period 1 – 5 yr - Surcharge analysis Discharge – Public system – existing capacity - outfall – Arterial Drainage Act 1945 ( S. 50 ) – culvert sizes – On site - BRE Digest soakpits

12 Sustainable Drainage Systems SuDS – “train” ( )

13 FLOODING Assessment of Application  OPW website : floodmaps.ie  Local Knowledge  Flood maps – Local Area Plan / Dev Plan OPW Guidelines to Local Authorities “ Planning System and Flood Management Guidelines”  Flood Risk Assessment  High : only in exceptional circumstances  Moderate : vulnerable developments - inappropriate  Low : yes - engineering / planning criteria

14 General Policy Development Plan – Strategic Flood Risk Assessment – One main municipal Sewerage plant – settlement – Promotion of water conservation Constraints - Sewer Capacity – Case by Case basis – Large Development - may be premature – Smaller Developments - conditions re phasing – Priority to Developments (a) Employment (b) Significant Community gain Irish Water - 2 standard conditions – Connection agreement before any development commences – Public Health & Environmental sustainability - Capital Investment Programme

15 End of Presentation Thanks To Water Services Staff