Sources of Information for Manufacturing Facilities Design

Slides:



Advertisements
Similar presentations
© BMA Inc All rights reserved. Decision-making Making routine decisions without the help of standard costs.
Advertisements

By Anastasia Lidya Maukar
Global Manufacturing and Materials Management
© BMA Inc All rights reserved. Decision-making Making routine decisions without the “help” of standard costs.
Retailing Management 8e© The McGraw-Hill Companies, All rights reserved CHAPTER 2CHAPTER 1CHAPTER 13 Buying Merchandise CHAPTER 13 McGraw-Hill/Irwin.
Just-In-Time and Lean Systems
INTRODUCTION TO BUSINESS
Global Manufacturing and Materials Management
Hilton Maher Selto. 2 Product Costing Systems Concepts and Design Issues McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved.
Chapter 6 Product Design & Process Selection-Manufacturing
Managerial Accounting Concepts and Principles
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
Materials Requirements Planning (MRP) Material Requirement Planning (MRP)  MRP determines the number of components and raw material required and their.
JUST IN TIME. Just in Time Getting the right quantity of goods at the right place at the right time.
Production Planning and Control Introduction
Introduction to Manufacturing Facilities Design and Material Handling
Chapter 5 Activity-Based Management. 1. How can reasonably accurate product and service cost information be developed? 2. What are the differences among.
Designing Goods and Services and Process Selection
1 PowerPoint Presentation by Douglas Cloud Professor Emeritus of Accounting Pepperdine University © Copyright 2005 South-Western, a division of Thomson.
Office Layout Techniques and Space Requirements
Chapter 11 Production and Operations Management Learning Goals
Chapter 2 Basic Managerial Accounting Concepts
Chapter 4. Chapter 4 Learning Objectives Describe steps in the production planning process of a high volume manufacturer like Fitter Snacker Describe.
Chapter 9 : Layout Strategies
Introduction to Theory of Constraints
Chapter 4 Process Design.
© The McGraw-Hill Companies, Inc., 2007 McGraw-Hill/Irwin Chapter 18 Managerial Accounting Concepts and Principles.
© McGraw Hill Companies, Inc., 2000 Global Manufacturing and Materials Management Chapter 16.
International Business Fourth Edition.
Intro to Business, 7e © 2009 South-Western, Cengage Learning SLIDE CHAPTER Types of Production Production Planning Planning.
Copyright © 2006 Pearson Education Canada Inc Chapter 10 Producing Goods and Services.
1 CHAPTER 18 MODERN DEVELOPMENTS IN MANAGING OPERATIONS.
MRP Systems MRP – Material Requirements Planning Commonly used method in industry to coordinate the production scheduling of end items and their associated.
Chapter 16 Selling the Layout. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Develop an appropriate.
Ch 3-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Part 3 Managing for Quality and Competitiveness © 2015 McGraw-Hill Education.
Ch. 20: Operation systems Learning Objectives Distinguish among various types of production and manufacturing processes. Describe product innovation.
CHAPTER 2 THE ORGANIZATIONAL BUYING PROCESS. Important Topics of the Chapter Changing Role of Business Buyer. The Business Buying Process. Business Buying.
Producing World Class Goods and Services Chapter 12.
Lean Production and the Just-in-Time Philosophy. Lean Production Elimination of All Waste – Waste is Anything that Does Not Add Value to Product. Continuous.
Create Your Own Company. Company Name & Logo What type of product line or service will your company create or provide? Create a name that “sticks in the.
Operational and Production Aspects of Contemporary Business Chapter Course: BUS 101 Lecturer: NNA.
Global Production, Outsourcing, and Logistics
Designing Goods and Services and Process Selection
Business Policy & Strategy: Chapter Nine Production Murdick, Moor, Babson & Tomlinson Sixth Edition, 2000.
Operations Fall 2015 Bruce Duggan Providence University College.
© BMA Inc All rights reserved. Decision Making.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Copyright © 2005 by South-Western, a division of Thomson Learning, Inc. All rights reserved. Part 3 Management: Empowering People to Achieve Business Objectives.
Operations Fall 2015 Bruce Duggan Providence University College.
12-1 Performance Assessment C hapter 12 Prepared by Douglas Cloud Pepperdine University.
JIT and Lean Operations Characteristics of Lean Systems: Just-in-Time  Pull method of materials flow  Consistently high quality  Small lot sizes  Uniform.
Production management Content – Core work process – 6 W – Production classification – EOQ – Lean Manufacturing – Systems of Management production.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
Operational and Production Aspects of Contemporary Business Chapter 11 (Chapter 10 in the book) Course: BUS 101 Lecturer: Emran Mohammad (Emd)
Manufacturing Facilities Design & Material Handling, 4/E
Chapter 7: Manufacturing Processes
Chapter 27 Cost Management for Just-in-Time Environments
Facility Inventory Old Facilities Modern Facilities Classroom Size
Value Stream Costing Mahmoud Al-Odeh, PhD Bemidji State University.
BUS 307Competitive Success/tutorialrank.com
BUS 307 Education for Service-- tutorialrank.com.
BUS 307 HOMEWORK Education for Service--bus307homework.com.
Chapter 7: Management How Management Functions
MODERN TRENDS IN PRODUCTION ENGINEERING
FACILITY LAYOUT Facility layout means:
Chapter 7 - Management.
Facilities Planning and Design Course code:
Presentation transcript:

Sources of Information for Manufacturing Facilities Design Chapter 2 Sources of Information for Manufacturing Facilities Design

Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify various sources for facilities planning Understand the role of management in facilities planning

The Marketing Department The marketing department provides a research function that analyzes what the world’s consumers want and need. The selling price has a direct influence on the number of units the company sells. The lower the price is, the more customers will choose the product. Volume also comes down to how many units the company wants to build per day. If 250,000 units will be needed, if the plant works 250 days a year (50 weeks times 5 days per week) then 1,000 units will be needed every day. The number of units per day is a very important number for the facility designer because it determines the number of machines and people for which he needs to provide space.

Determining Takt Time or Plant Rate The rate of production is called takt time (German word) or production rate. For example, suppose you need to produce 1,000 units in a 8 hour shift. Suppose the plant is operating at 90% efficiency. Thirty minutes for lunch, 10 minutes for break, and 8 minutes for team meeting every shift. 8 hour shift X 60 minutes = 480 minutes – 30 min for lunch – 10 min for breaks – 8 min for meetings = 432 min effective time x 90% efficiency = 389 min. Takt time or R = 389 min / 1000 units = .389 min per unit. Units per minute = 1 unit/ ,389 = 2.57 units per minute

Calculating Scrap and Rework Rates Scrap and rework result in an inefficient and wasteful use of the facilities and resources. In determining the plant rate you must include scrap and rework rates in your calculation. For the previous example if you had 3 percent scrap, for 1000 good parts you would need to produce: 1000 / (1-.03) = 1,031 units. The plant rate is used to calculate the number of machines and workstations, the conveyor speed, and the number of employees required for the facilities design.

The Product Design Department The product design department is the source for blueprints, bill of materials, assembly drawings, and model shop examples. There will be drawings for each individual part of the product. These drawings tell you the size, shape, material, tolerances, and finish. The parts list or bill of materials list all the parts that make up a finished product. The list includes part #s, part names, the quantity of each part, and may include make or buy decisions.

The Intended Bill of Material The bill of material provides a hierarchical structure of the product by identifying each assembly, subassembly, and the parts of each subassembly. The highest level of the product, or the finished assembly, appears on the top of the list and is given the number zero (fig 2-5, page 36). Under this are listed the major sub assemblies and each is assigned a level of one (.1). The period before the numeral 1 indents the major sub assembly from the main assembly. Under each subassembly, the required components are listed and numbered level two (..2). The purpose of the periods before each level number is to offset or indent each level in order to enhance readability. The parts that are purchased complete are called buyouts and can be fabricated cheaper by someone else. Companies that purchase every part from outside are called assembly plants.

Management Policy Information Management refers to upper level employees who are responsible for the financial performance of a company. Inventory policy: The company’s inventory policy could be as simple as “provide space for one month supply of raw material, work in process, and finished goods.” JIT and Kanban philosophies reduce inventory and therefore space, facilities, and cost. Lean Thinking and Muda as Part of Management Philosophy: Muda means waste. Mistakes that require rectification and rework is a good indication of muda. Investment Policy: Facilities design projects might be approved with a 33% ROI. 33% is a 3 year pay back period. Startup Schedule: All the work needed to accomplish the task will be backdated from the production start date (page 42). Make or Buy Decisions: The cheapest way to provide the part to the assembly department is the best source. Organizational Relationships: The number of employees determines the size of many areas such as cafeterias, restrooms, office space, and medical facilities. Feasibility Studies: Out of many feasibility studies only a small number of projects (1 in 4) are typically approved.

Summary The marketing department provides a research function that analyzes what the world’s consumers want and need. The number of units per day is a very important number for the facility designer because it determines the number of machines and people for which he needs to provide space. The rate of production is called takt time or production rate. Scrap and rework result in an inefficient and wasteful use of the facilities and resources. The plant rate is used to calculate the number of machines and workstations, the conveyor speed, and the number of employees required for the facilities design. The product design department is the source for blueprints, bill of materials, assembly drawings, and model shop examples. The bill of material provides a hierarchical structure of the product by identifying each assembly, subassembly, and the parts of each subassembly. The parts that are purchased complete are called buyouts and can be fabricated cheaper by someone else. Companies that purchase every part from outside are called assembly plants. Management refers to upper level employees who are responsible for the financial performance of a company. Feasibility Studies: Out of many feasibility studies only a small number of projects (1 in 4) are typically approved.

Home Work Why is the number of units per day a very important number for the facility designer ? What is a bill of material?