AN OVERVIEW OF INTEGRATED WATER RESOURCES MANAGEMENT IN DVC

Slides:



Advertisements
Similar presentations
Hydropower Development Policy & Regulatory Framework
Advertisements

John H. Kerr Dam and Reservoir John H. Kerr Dam and Reservoir U.S. Army Corps of Engineers Wilmington District.
By: Saddam Qahtan Waheed B. Sc. in Water Resources Engineering (2007) M. Sc. in Hydrological Engineering and Remote Sensing Techniques (2010) SWLRI \ NCWRM.
MONGOLIA: Cost Benefit Analysis (CBA) Project selection Team members present at the training: Ms.Tsendsuren Batsuuri, Ministry of Environment and Green.
Northwest Electricity The Council An interstate compact of ID, MT, OR and WA, not a federal or state agency. An interstate compact of ID, MT, OR and.
Recommendations for a Statewide Water Plan By: Ewan Hadgraft Alabama Rivers Alliance Birmingham-Southern College.
Hydropower Development: Experience of Nepal
National IWRM plans; links with Water Supply and Sanitation Palle Lindgaard Jørgensen Technical Secretariat Yerevan, 13 December 2006.
Environmental Sustainability in the Extractive Industry: The Case for Climate Change Mitigation Dr Uwem E. Ite.
IWRM in EECCA countries Palle Lindgaard Jørgensen Technical Secretariat Helsinki, May 2007.
Nathan VanRheenen Richard N. Palmer Civil and Environmental Engineering University of Washington Recasting the Future Developing.
FLOODS AND FLASH FLOODS M.P.Singh Superintending Engineer Hydrological Observation Circle Central Water Commission, Guwahati.
Water Resources In the United States: Perspectives and Challenges by Dr. Jerome Delli Priscoli Institute for Water Resources US Army Corps of Engineers.
Drought and the Central Valley Project August 2014.
Water Resources State Mission guided by the National Water Mission
Hydroelectric Power
Bureau of Reclamation Overview Christopher Cutler Deputy Chief Boulder Canyon Operations Office.
WATER ISSUES IN THE EASTERN EUROPE:
Department of Natural Resources and Conservation, Water Resources Division State Water Projects Bureau Kevin B. Smith, P.E., Chief
GCSE Geography Year 10. UNIT 2 WATER, LANDFORMS & PEOPLE.
Dr. R.P.Pandey Scientist F. NIH- Nodal Agency Misconception: A DSS takes decisions ---(No)
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
National Policy Dialogue in Ukraine on Integrated Water Resources Management First meeting of the Steering Group (Kiev, 25 April 2008)‏ Nataliia Zakorchevna.
Thailand Strategies for Pro-Poor Growth Banchong Amornchewin Thailand International Development Cooperation Agency.
Environmental flows in IWRM Mike Acreman. IWRM goals Economically efficient water use Assessments of supplies, sound allocation, efficient technologies.
Governor’s Strategic Growth Plan Flood Protection and Clean, Safe, Reliable Water Supply Bond and Financing Acts of 2006 and 2010 Southern California Water.
Luxor, Egypt, April 2013 Utilization of ICT for Enhanced Water Resources Management &Monitoring Networks at MWRI Ayman Ibrahim, General Director.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Steering Committee 12 November Integrated Water Resource Management and its implications for the energy sector in Tajikistan PPCR Workshop on Climate.
Case Study – Preparation of an EMP Integrated Ecosystem Management of Sunshine-Moon River Basin (SMRB) Project.
CE 424 HYDROLOGY 1 Instructor: Dr. Saleh A. AlHassoun.
CAPTIVE POWER POLICY. Section 44 of the Electricity(Supply) Act, 1948 gave birth to Captive Generation.  Any other person to establish or to acquire.
RD Lasco ICRAF1 TRADEOFF ANALYSIS OF ADAPTATION STRATEGIES IN THE PHILIPPINES RD Lasco 1 R.V.O. Cruz 2, J.M. Pulhin 2, F.B. Pulhin 2 1 World Agroforestry.
Diversion of Flood Water from Ganga at Kanpur.  Introduction  Study Area  Flow Pattern of Ganga at Kanpur  Quantification of Divertible Flood  Downstream.
1 Power Resource Management with assistance of Kevin Gawne Karl Reznichek and Dave Cormie.
Opportunities and Challenges of Water Resources Management in Lao PDR
WELCOME 1.
Environmental Management Module V
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
The Mekong River Commission: Challenges, Mission, and Strategies.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
Dr Ranu Rani Sethi Senior Scientist ICAR-IIWM, Bhubaneswar, Odisha District Irrigation Plan (A case study of Nayagarh district of Odisha)
Santa Rosa Plain Groundwater Management Planning Update Fall 2013.
WELCOME TO “DIBANG MULTIPURPOSE PROJECT” SUBMITTED BY : ABHISHEK KUMAR ROLL NO BRANCH – MECHANICAL (5 TH SEM )
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
DAMODAR BASIN WATER MANAGEMENT-A REVIEW WITH NEW INITIATIVES- A CASE STUDY By SATYABRATA BANERJEE DY. CHIEF ENGINEER (CIVIL) & DEBASHIS GHOSH CHIEF ENGINEER-I.
Climate Change Impacts on Water Resources and Human Livelihoods in the Coastal Zones of Small Island Developing States (CASCADE) Project Stakeholder Panel.
FLOODS AND FLASH FLOODS Prepared by: Ridham Goti( )
Hydrology and Water Resources Engineering ( ) Government Engineering College Rajkot Civil Engineering Department Faculty Guide: Prof V.G.Yadav DROUGHT.
Heat Network Demonstration SBRI: policy context & objectives for the competition Natalie Miles Heat Strategy and Policy (Heat Networks)
Institutionalizing People’s Participation in Water Planning and Management M. Dinesh Kumar Presentation in the Brainstorming Session for the 4 th India.
Nepal’s Water Resources at a Glance
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
On measures taken for management and efficient use of water resources in the Republic of Uzbekistan Kh. Ishanov - Chief specialist on water management.
DAMODAR RIVER VALLEY AN INDIAN PARALLEL TO THE TENNESSEE RIVER VALLEY
Participatory Irrigation Management in Andhra Pradesh
Under 4.7 Habitat of the MTDS, Working Group 2 deals with:
Integrated Water Resources Planning for optimal benefits to the society Panel Discussion-3 India Water Week 2017.
District Disaster Risk Reduction Managment Plan
GANDHINAGAR INSTITUTE OF TECHNOLOGY
FIELD LEVEL CHALLENGES FOR SOLAR PARKS IN INDIA
Concepts in Water Resources Management
Department of Environmental Quality Division of Water Resources
IMPLEMENTATION OF ARTICLE 9
Ghana Water Management Country Status Factsheet
Addressing the challenge of water scarcity and droughts
River Basin Organizations
Engineering Hydrology (ECIV 4323)
Water scarcity and droughts
Presentation transcript:

AN OVERVIEW OF INTEGRATED WATER RESOURCES MANAGEMENT IN DVC PREPARED BY DIPANKAR CHAUDHURI SE(CIVIL), DVC GUIDED BY S. B. PANDEY DCE(CIVIL), DVC

HISTORY OF DAMODAR RIVER VALLEY THE RECORDS OF THE BENGAL GOVERNMENT FOR THE PERIOD 1852-1923 SHOW THAT THE RIVER BREACHED ITS BANKS FREQUENTLY. THE GOVERNMENT WAS FORCED TIME AND AGAIN TO TAKE UP DIFFERENT PLANS FOR FLOOD CONTROL WORKS. NOTABLY LARGE FLOODS CAUSED WIDE SPREAD DAMAGE IN THE YEARS 1823, 1840, 1877, 1913, 1935, 1939, 1941, AND 1943. FLOOD CONTROL BY MEANS OF RESERVOIRS WAS CONSIDERED AS EARLY AS 1863. BRITISH ENGINEERS WISHING TO LOCATE DAM SITES SURVEYED ONE RESERVOIR SITE IN JANUARY 1864. IN 1902 A RESERVOIR SITE WAS PROPOSED AT BARAKAR ABOVE THE CONFLUENCE OF THE BARAKAR AND USRI RIVERS. AFTER THE SEVERE FLOOD OF 1913, A LARGE RESERVOIR WAS PROPOSED ONCE MORE FOR THAT SITE. IN 1919, THE IDEA OF USING MULTIPLE RESERVOIRS WAS CONCEIVED. THE IDEA WAS TO USE THREE DAMS – ONE ON DAMODAR RIVER, ONE ON THE BARAKAR RIVER AND ONE ON THE USRI RIVER. CONSTRUCTION OF DAMODAR CANAL (ANDERSON) BEGAN IN 1926 AND COMPLETED IN 1933. THE GOVERNOR OF BENGAL SET UP THE DAMODAR FLOOD ENQUIRY COMMITTEE IN 1943 & ITS REPORT (AUG 1944) SUGGESTS THE CREATION OF AN AUTHORITY SIMILAR TO THAT OF TVA. DVC WAS FORMED IN THE YEAR 1948 BY THE ACT OF CONSTITUENT ASSEMBLY OF GOVERNMENT OF INDIA

FUNCTIONS OF THE CORPORATION THE PROMOTION AND OPERATION OF SCHEMES FOR IRRIGATION, WATER SUPPLY AND DRAINAGE THE PROMOTION AND OPERATION OF SCHEMES FOR THE GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC ENERGY, BOTH HYDRO-ELECTRICAL AND THERMAL THE PROMOTION AND OPERATION OF SCHEMES FOR FLOOD CONTROL IN THE DAMODAR RIVER AND ITS TRIBUTARIES AND THE CHANNELS, IF ANY, EXCAVATED BY THE CORPORATION IN CONNECTION WITH THE SCHEME AND FOR THE IMPROVEMENT OF FLOW CONDITIONS IN THE HOOGHLY RIVER, THE PROMOTION AND CONTROL OF NAVIGATION IN THE DAMODAR RIVER AND ITS TRIBUTARIES AND CHANNELS, IF ANY THE PROMOTION OF AFFORESTATION AND CONTROL OF SOIL EROSION IN THE DAMODAR VALLEY, AND THE PROMOTION OF PUBLIC HEALTH AND THE AGRICULTURAL, INDUSTRIAL, ECONOMIC AND GENERAL WELL-BEING IN THE DAMODAR VALLEY AND ITS AREA OF OPERATION.

CORPORATE OBJECTIVES GENERATE MORE POWER AT LOWEST POSSIBLE COST TRANSMIT, DISTRIBUTE AND SUPPLY RELIABLE AND QUALITY POWER ADOPTION OF EFFICIENT INDUSTRIAL, COMMERCIAL AND HUMAN RESOURCE MANAGEMENT PRACTICES OPTIMUM UTILIZATION OF AVAILABLE WATER RESOURCES AND HARNESSING THE REMAINING POTENTIAL OF THE BASIN TO THE EXTENT POSSIBLE TO FORTIFY MEASURES FOR ENVIRONMENTAL PROTECTION AT PLANT LEVELS AND TO CONTINUE WITH THE EFFECTIVE ECO-CONSERVATION ACTIVITIES IN THE VALLEY AREA. STRENGTHENING OF SOCIO-ECONOMIC DEVELOPMENT FOR THE INHABITANTS OF NEIGHBORING VILLAGES OF THE MAJOR PROJECTS

THE TENNESSEE VALLEY AUTHORITY (TVA) - A PARTIAL MODEL FOR THE DAMODAR VALLEY CORPORATION (DVC) BRIEF COMPARISON   UNIT TENNESSEE DAMODAR CATCH AREA Sq. Mile 40,200 8,500 RIVER LENGTH Miles 652 336 FOREST COVER Acres 13,000,000 6,000,000 (1930) (1948) MEAN YEARLY R/F Inches 51 45 MEAN YLY RUNOFF % of rainfall 42 35 DAM (MAJOR) Nos. 39 5 POPULATION 2,800,000 (1930) 10,720,485 (1971) 14,076,399 (1991)

DAMODAR VALLEY RESERVOIR REGULATION COMMITTEE (DVRRC) COMMITTEE IS FRAMED COMPRISING OF THE MEMBERS OF THE STAKE HOLDER STATES I.E. JHARKHAND AND WEST BENGAL, AS WELL AS MEMBERS OF DVC AND CENTRAL WATER COMMISSION - A PIVOT BODY OF GOVERNMENT OF INDIA. ROLE OF COMMITTEE IS FRAMING OF POLICY (OPERATION MANUAL) AND TO REGULATE THE OPERATION OF ALL THE RESERVOIRS INCLUDING ALLOCATION OF WATER TO DIFFERENT AGENCIES FOR DIFFERENT USES.

MAJOR ACTIVITIES TAKEN UP BY DVC INSTALLATION OF 39 AUTOMATIC RAIN GAUGE STATIONS MODIFICATION OF THE EXISTING OPERATIONAL GUIDE CURVES RESERVOIR MANAGEMENT FLOOD FORECAST MANAGEMENT HYDRAULIC DATA MANAGEMENT CREATION OF STORAGE DE-SILTATION WORK PISCICULTURE MASTER PLAN DRIP ENVIRONMENTAL MANAGEMENT SOIL CONSERVATION DAM BREAK ANALYSIS EAP (EMERGENCY ACTION PLAN) & DMP (DISASTER MANAGEMENT PLAN) REHABILATION AND RE-SETTLEMENT (R & R) SEDIMENTATION SURVEY OF RESERVOIRS SOCIAL INTEGRATION PROGRAMME

MUNICIPAL & INDUSTRIAL WATER SUPPLY SUPPLYING WATER TO ABOUT 170 MUNICIPAL & INDUSTRIAL AGENCIES FROM MACKLUKXIGUANGE NEAR DALTANGUANGE IN JHARKHAND TO PANAGARH IN WB. MAIN INDUSTRIAL CONSUMERS COAL INDIA STEEL PLANTS THERMAL PLANTS RAILWAYS CEMENT FACTORIES HFCL, DPL, STPS ETC. MAIN DOMESTIC CONSUMERS JHARIA WATER BOARD DHANBAD WATER WORKS ASANSOL RANIGUNGE & DURGAPUR MUNICIPALITIES PUBLIC HEALTH ENGINEERING DEPARTMENTS (JHARKHAND & W. BENGAL) ETC.

MUNICIPAL AND INDUSTRIAL WATER WITHDRAWAL Withdrawal in MCM/Day

IRRIGATION AREA Kharif Rabi Total Hectare Check dams (16,882) 64,748 WEST BENGAL Kharif Irrigation potential: 9,73,000 acre (3,93,763 hectare) Rabi irrigation potential : 55,000 acre (22,258 hectare) JHARKHAND   Kharif Rabi Total Hectare Check dams (16,882) 64,748 Small Reservoirs Jamunia 1458 1,458 Charwa 405 Gonda 931 Proposed Konar Reservoir 47,849 14,074 61,923 Balpahari Reservoir 40,468 1,69,933

A VIEW OF DAMODAR VALLEY RESERVOIR STORAGE AND FLOOD MODERATION --------------------------------------------------------------------------------------------------------------------------------- Flood Live Total Flood Moderation Capacity Storage Storage Storage Combined Peak Moderated Inflow Outflow (MCM) (Cumec) ----------------------- --------------------------------------------------------------------------------------------------------- Original Plan 3579 2838 7009 28321 7085 1st Stage of 1851 1318 3812 18420 7085 DVC Dams   Achieved 1116 1318 3077 17003 7085 in 1ST stage Current 971 926 2206 14169 3684 position Loss in % 13 30 28 NA NA ------------------------------------------------------------------------------------------------------------------------------

LOSS OF CAPACITY IN %   Maithon Panchet Tilaiya Konar Dead 54.85 55.08 46.81 41.67 Live 27.35 32.94 40.76 20.81 Flood 12.57 13.20 7.30 32.14 Gross 27.36 28.24 31.60 26.41

TILAIYA DAM KONAR FLOOD RELEASE TOURISM AT MAITHON DAM DURGAPUR BARRAGE

HEAD REGULATOR AT DURGAPUR BARRAGE NAVIGATION HEAD REGULATOR LEFT BANK MAIN CANAL IRRIGATION

MAJOR ISSUES FACED BY DVC LAND ACQUISITION REHABILITATION AND RESETTLEMENT FLOOD OPERATION LOWER DAMODAR CHANNEL CAPACITIES OPERATION OF THE TENUGHAT RESERVOIR ACTIVITIES WITHOUT KNOWLEDGE OF DVC ENVIRONMENTAL IMPACT CAPITAL SHARING FUND ILLITERACY POLITICAL WILL EMPLOYMENT EXTRACTION OF FULL BENEFITS (TPD ETC) EROSION & SEDIMENTATION SHARING OF WATER TECHNOLOGY LACK OF PRO-ACTIVE PARTICIPATION OF STAKE HOLDERS

STRATEGIES TO COMBAT ISSUES FLOOD CUSHION OF TILAIYA AND KONAR RESERVOIR MAY BE USED AS A COMBINED STORAGE FOR FLOOD AND CONSERVATION STORAGE IF EXTRA WATER IS MADE AVAILABLE, IRRIGATION FACILITIES MAY BE EXTENDED TO JHARKHAND STATE THROUGH KONAR AND TILAIYA RESERVOIRS IN CASE OF MAITHON AND PANCHET, EXISTING OPERATIONAL CONSERVATION LEVEL MAY BE INCREASED BY 1.52 MT. IN EACH RESERVOIR ALL M&I WATER ALLOCATIONS MAY BE REVIEWED TO LOCATE SURPLUS IN THE ALLOCATED QUANTITIES TO COMBAT THE FLOOD AT THE LOWER VALLEY, DOWN-STREAM FLOOD CARRYING CAPACITIES MAY BE REVIEWED AND MEASURES FOR IMPROVEMENT OF CARRYING CAPACITY MAY BE TAKEN ADEQUATE AFFORESTATION AND SOIL CONSERVATION MEASURES ARE ALSO REQUIRED TO BE TAKEN UP AT THE UPPER VALLEY TO REDUCE THE EROSION RATES TO TAKE UP RAIN WATER HARVESTING AND GROUND WATER RECHARGING PROJECTS RENOVATION OF OLD IRRIGATION & WATER SUPPLY CANAL SYSTEM AND IMPLEMENTATION OF MODERN IRRIGATION TECHNIQUES FOR OPTIMUM USE OF THE RESOURCE

STRATEGIES TO COMBAT ISSUES CONJUNCTIVE USE OF SURFACE AND GROUND WATER INSTILLING DISCIPLINE IN EQUATABLE DISTRIBUTION THROUGH WATER USERS ASSOCIATION’S PARTICIPATION IMPLEMENTATION OF MORE SCIENTIFIC CROPPING PATTERN OPERATION OF CANALS AND DISTRIBUTION NETWORK ON DEMAND BASED RATHER THAN SUPPLY BASED VOLUMETRIC BASED MEASUREMENT OF WATER AT USER END REVISION OF WATER TARIFF TAPPING OF UNHARNESSED HYDRO-POWER POTENTIAL OF NEARLY 3500 MW

CONCLUSION WELL STRUCTURED LEGAL AND REGULATORY FRAMEWORKS VIZ. DVC ACT 1948, INTER STATE AGREEMENT 1978 AND DVRRC BROADLY COVER ALMOST ALL THE ASPECTS MENTIONED IN DRAFT CWC GUIDE LINES ON IMPLEMENTATION OF IWRM. HOWEVER PRO-ACTIVE PARTICIPATION OF THE STAKE HOLDERS IN MANAGING THE WATER RESOURCES OF THE VALLEY IN EFFICIENT, SPEEDY AND TANGIBLE MANNER IS NEED OF THE HOUR. SINCE DVC PROJECTS ARE NEARLY 55 YEAR’S OLD, DEDICATED AND SINCERE EFFORTS OF ALL CONCERNED IS HIGHLY REQUIRED TO REJUVENATE THE EXISTING INFRA-STRUCTURE AND TO CREATE ADDITIONAL FACILITIES FOR ACHIEVING THE ORIGINAL PLAN OF DEVELOPMENT.

THANKS