Drainage Services Department Drainage Project Division Contract No. DC/2007/01 Contract Title: Drainage Improvement Works in Ki Lun Tsuen, Kwu Tung, Ma.

Slides:



Advertisements
Similar presentations
Bewdley Flood Alleviation Scheme. Bewdley, November 2000.
Advertisements

BOX PUSHING TECHNOLOGY
Transport Canada Submission to the Nunavut Impact Review Board Respecting the Meadowbank Gold Project March 2006.
Measurement for Civil Engineering works
Update on FCPS Construction/Renovation Projects August 2009.
Locality Plan PROCUREMENT Project Timeline for each of the 5 sections Construction of each stage approx. 40kms Commence Construct only contract.
May 14, 2014 RAMSHORN POND DAM REHABILITATION PUBLIC INFORMATION SESSION PARE CORPORATION, FOXBORO, MA Allen R. Orsi, P.E., Managing Engineer.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Drainage Channel Restoration Construction Project Wood Co. Engineer’s Office Great Lakes Protection Fund A.D. Ward, D. Mecklenburg, R. McCall, D.J. Mears.
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
ESTIMATING By Laith Jacob.
Crane Bridge Design STJ Engineering Matt Albert AJ Chandler Noah Fehrenbacher Jake Gennicks Jake Wilhoit Rose-Hulman Institute of Technology.
Sanitary Engineering Lecture 16
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Connecticut Department of Transportation: Office of Environmental Planning (OEP) Statewide Drainage Maintenance Activities State owned Rail Facilities.
BUILDING STRONG ® 1 Regional General Permit (RGP) 31 Interagency Meeting June 11, 2015.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Punjab Cities Governance Improvement Project (PCGIP)
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
Road to Prosperity. UP GRADATION OF AIRPORT SEAPORT ROAD TO FOUR LANE -PHASE I – PROGRESS REPORT AS ON Upgrdadation of airport seaport.
Lakes Creek Road Waste Transfer Station Construction highlights.
An-Najah National University Faculty of Engineering Civil Engineering Department COST STUDY FOR TWO BEDS TO THE SAME PROJECT (construction main transmission.
21 st Sep Election Process July & August
ELCITA Update 25 th August Update – Estate Management E – Toilets 8 e-toilets operational and work order placed for 4 more e-toilets Under Ground.
Department of Infrastructure Castletown Tidal Flooding & Sea Defence August 2014.
Balchik Integrated Water Project in Bulgaria ISPA Measure 2002 BG 17 P PE 017 WWTP BALCHIK.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Department of Correctional PRESENTATION ON THE DEVELOPMENT OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES DEPARTMENT OF CORRECTIONAL SERVICES.
There are 2 Types of Bridge Inspectors – Class B and Class A.
PA-1 Surface Water Control Structure Replacement Final Payment.
December 3, 2015 TOWN OF MILLBURY DPW, MA Robert McNeil, P.E., Director PARE CORPORATION, FOXBORO, MA Allen R. Orsi, P.E., Managing Engineer This project.
P ART A - S TANDARDS A NNUAL ‘A’ B OOK R EVIEW  Conducted by City of Toledo -Division of Engineering Services  Review Typically performed in Q4.
Water and Waste Department 2016 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 20,
MELBOURNE HILL ROAD CATCHMENT DRAINAGE IMPROVEMENTS Reference Panel Meeting, 6 February 2014.
10 December Summary: Updating of the activities carried out on-site (Done) in NOVEMBER List activities on going (Next steps) and scheduled for DECEMBER.
January 2009 Phase IVB Construction Photographs by Brent Anderson.
David Smith, Project Manager GZA GeoEnvironmental, Inc. February 13, 2015 Blynman Canal and Stacy Boulevard Bulkhead Improvement Projects 1.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
Rural Access Programme Development through access (4C) Quality Management Plan Presentation for CPD Training Ramesh Khatakho Engineering Officer, Kalikot.
PROJECT CLOSEOUT MODULE 11. Objectives Establish procedures for effective/smooth project close-out As-built plans Project payment Certifications Report.
Stormwater Management
DESIGN AND CONSTRUCTION GUIDELINES

Hays County Commissioners Court
Using project records to show delay and disruption
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Safety Tip FQ18086 RHODE ISLAND AVENUE METRO STATION TRACK DECK AND PRE-CAST PANEL REHABILITATION Please use full fall Protection gear when using 6’ or.
Navigating FDOT Specifications and Standards
Road-Stream Interface:
Minuteman Vocational Technical Regional High School Progress
SITE PICTURES AND PROGRESS
Location Plans & Site Plans
Mount Vernon Community School
Dennis Li - HKCIC Lecturer
PRESENTATION ON THE FINANCIAL MANAGEMENT INFORMATION 3rd QUARTER IRO 2007/ FEBRUARY 2008.
Office of Sponsored Programs
Welcome to the Stormwater & Sustainability Branch
Walker Street Reconstruction Project 25% Design Public Hearing
PUBLIC HEARINGS ON CONDITIONAL GRANTS AND CAPITAL EXPENDITURE:
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
PORTFOLIO COMMITTEE ON SOCIAL DEVELOPMENT 13 MARCH 2019
HOSPITAL REVITALISATION PROJECTS REPORT TO THE SELECT COMMITTEE ON APPROPRIATIONS AUGUST 2012 Northern Cape Department of Health & Department of Roads.
Monterey County Project Report for Measure X Expenditures
Stream Crossing Replacement Policy
Mytholmroyd FAS Progress Update
Bridge forms critical path (6 months to construct)
Company Profile Presentation Copyrights 2013
Presentation transcript:

Drainage Services Department Drainage Project Division Contract No. DC/2007/01 Contract Title: Drainage Improvement Works in Ki Lun Tsuen, Kwu Tung, Ma Tso Lung and Sha Ling (August 2011)

Drainage Projects Division Drainage Services Department Channel MTL01 (Portion B ) Works Area (Portion A) Channel KTN03 (Portion G) Channel FTA04 (Portions E & E1) Channel KTS01 & KTSR1 (Portion D) Channel NTM04 (Portions C, C1 & C2)

Drainage Projects Division Drainage Services Department General Description of Works Sha Ling (Portions E & E1) FTA04 covers 0.5km long proposed drain. The outstanding works in Portion E1 are in progress. For Portion E, the trenchless excavation works from MH5 to MH4A was completed and from MH6 to MH7 is in progress (about 45m/80m long so far). Ma Tso Lung (Portion B) MTL01 covers 0.5km long Gabion channel and 2 box culverts. Gabion channel construction work is continued. Around 473m long Gabion walls and 440m/512m long mattress channel bed were installed. Box Culvert No. 1 was cast and construction of Box Culvert No.2 is in progress. About ??m long permanent sheet-piles wall was installed. Ki Lun Tsuen (Portion s C, C1 & C2) NTM04 covers 1km long channel and 6 box culverts. TTA for construction of Box Culvert No. 5 (stage 2) was implemented. About 302m/426m long rectangular and 223m/442m long Grasscrete channels were cast and 228m long is under construction. Shek Tsai Leng (Portion G) KTN03 covers 0.37km long channel and 2 box culverts. The substantial completion certificate dated 4 January 2011 was issued. Outstanding backfilling works, installation of railing and minor works at bank level are on-going. Ying Pun (Portion D) KTS01 & KTSR1 cover 0.75km long rectangular channel and 4 box culverts. Total 481m/540m long rectangular channel was cast and 49m long is under construction. The 900 U-channel and manhole MH7A at KTSR1 were cast. Access Ramp Nos.1 & 2 were cast. Construction of jacking pit at downstream side and temporary steel decking at upstream side of Box Culvert No.2 are in progress. Chuk Wan Street In Portion A area, maintenance of the Contractor’s Accommodation and the ERs’ office is continued.

Drainage Projects Division Drainage Services Department Section of the Works Portion of the Site Commencement Date Original Completion Date Accumulative EOT Granted (Days) Extended Completion Date Actual Completion Date Remarks 1E128/11/200829/7/ /8/2009 (noon) 24/6/2010 (Actual) Channel FTA04 2E28/11/200828/9/ /12/ /6/2011 (Actual) Channel FTA04 3 C, C1 & C2 28/11/200828/9/ /1/2011 (noon) 30/6/2011 (Actual) Channel NTM04 4D28/11/200828/9/ /12/2010- Channel KTS01 & KTSR1 5B28/11/200828/9/ /2/2011 (noon) 11/5/2011 (Actual) Channel MTL01 6G28/11/200828/9/ /1/2011 4/1/2011 (Actual) Channel KTN03 7A28/11/200828/9/ /2/2011 (noon) - All of the Works other than those to be executed under Section 1 to Section 6 Programme of the Works The completion of the Works in term of expenditure was estimated about 71% of the Contract Sum based on the IP No. 33 (included CPF & Retention).

Drainage Projects Division Drainage Services Department Channel MTL01 at Ma Tso Lung (Portion B) B A

Drainage Projects Division Drainage Services Department View A – Ch140 (looking downstream), excavation for construction of remaining gabion channel at Ch140 to Ch165

Drainage Projects Division Drainage Services Department View B – Ch450 (looking downstream), construction of maintenance access and granite facing wall at Ch450 to Ch530

Drainage Projects Division Drainage Services Department Channel NTM04 at Ki Lun Tsuen (Portion C) C E D

Drainage Projects Division Drainage Services Department View C – Ch900 (looking downstream), construction of maintenance access ramp at Ch920 to Ch940

Drainage Projects Division Drainage Services Department View D – Ch600 (looking upstream), construction of Grasscrete channel from Ch500 to Ch600

Drainage Projects Division Drainage Services Department View E – Ch200 (looking upstream), completed rectangular channel from Ch150 to Ch200

Drainage Projects Division Drainage Services Department Channel KTS01 & KTSR1 at Ying Pun (Portion D) I G F H

Drainage Projects Division Drainage Services Department View F – Ch100 (looking downstream), construction of access ramp no. 1 from Ch100 to Ch150

Drainage Projects Division Drainage Services Department View G – Ch290 (looking upstream), construction of Box Culvert. No. 2

Drainage Projects Division Drainage Services Department View H – Ch A+80 (looking downstream), jacking of 1650 dia. Pipe across Fan Kam Road

Drainage Projects Division Drainage Services Department View I– Ch560 (looking upstream), construction of maintenance access ramp 2 from Ch520 to Ch560

Drainage Projects Division Drainage Services Department Channel FTA04 at Sha Ling (Portion E) J K

Drainage Projects Division Drainage Services Department View J – Ch100 (looking upstream) – implemented TTA for construction of manhole MH4 & MH4A

Drainage Projects Division Drainage Services Department View K – Ch 220 (looking upstream), completed road reinstatement from MH5 to MH6

Drainage Projects Division Drainage Services Department Channel KTN03 at Shek Tsai Leng (Portion G) M L

Drainage Projects Division Drainage Services Department View L – Ch100 (looking downstream), rectangular channel side backfilling completed from Ch100 to Ch160

Drainage Projects Division Drainage Services Department View M – Ch230 (looking downstream), construction of maintenance access from Ch230 to Ch280