Overview of ENF 2013-07: California Aeration Plan for Structural Fumigations (a.k.a. “CAP 2013”) Dublin, CA September 25, 2013 Peggy Byerly DPR Enforcement.

Slides:



Advertisements
Similar presentations
FHM TRAINING TOOLS This training presentation is part of FHMs commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Advertisements

Step-by-step guide to prevent falls
Classroom Safety. Fire & Life Requirements as per State Education Dept The following list relates to the classrooms and adjacent areas. They are provided.
Closed Area Construction
The Care and Feeding of Silane Art Garcia FM Global March 23, 2006.
Chemical Fume hood or Biosafety Cabinet
eQuest Quick Energy Simulation Tool
Chapter 8: Duct Design and Sealing To be used with the Guide to Building Energy Efficient Homes in Kentucky.
5/1/2015OSHA Office of Training & Education 1. 5/1/2015OSHA Office of Training & Education 2 Subpart Q - Concrete & Masonry Construction ( )
Ventilation Systems As Control Measures. Introduction A good and effective ventilation system is necessary in a workplace which have processes that emit.
The House as a System 1. Air Temperature and Water Vapor.
Condensation Piping and Installation Drain Pans
Roofing Fall Protection The following presentation can be used to satisfy the training requirements of the Fall Protection Standard in the WISHA Safety.
Step-by-step guide to prevent falls Module E - Other Specifications Part C-1-Fall Protection Requirements for Construction.
The gasses, fumes and dust produced by welding and cutting processes can be hazardous. There are 3 basic methods to protect personnel against hazardous.
Fall Protection and Ladder Safety Training. Course Outline  Introduction  Fall Protection  Ladder Safety  Wrap-up.
Controlling Hazardous Energy
Welding Fumes and Gasses
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012eere.energy.gov Blower Door Basics WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
Ventilation for Confined Spaces requires ventilation as follows: An employee may not enter the space until the forced air ventilation has eliminated.
Appendices Subpart R Steel Erection
BRC Food Safety Quality Management System Training Guide
Safety Considerations for VRF Applications January 13, 2012 Presenter: Dominic Kolandayan Daikin AC (Americas), Inc.
Unit 7: Engineering Controls to Consider When Using Two-Component Low Pressure Spray Polyurethane Foam.
AIR QUANTITY REQUIRED TO TRANSFER HEAT IN A FORCED AIR SYSTEM In all four mechanical systems considered, the transfer of heat, either by taking it out.
1 Bryan E. Houtchens Team Too THERMAL TERMITE ERADICATION ®
Radon Overview Reducing Radon in a Home. Learning Outcomes Upon completion of this module you will be able to:  Recall the most common method to reduce.
VENTILASI TRI MARTIANA. Introduction A good and effective ventilation system is necessary in a workplace which have processes that emit air contaminants.
Fall Hazards.
Super Vac Smoke Ejector SECTION: Tools and Equipment ISSUED: REVISED: ##-####
Safety Training Presentation
Safe Operation of Storage Tanks: Decommissioning and Repair
Air Movement and Natural Ventilation
Emerging Issues in Structural Regulatory Enforcement Mike Zeiss Enforcement Branch, DPR DPR Structural Regulatory Training Pomona CA,
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
California Department of Pesticide Regulation 1001 I Street, Sacramento CA October Aeration Phase Module 2.2: Sulfuryl Fluoride Labeling Structural.
California Department of Pesticide Regulation 1001 I Street, Sacramento CA October Certification Phase Structural Fumigation Use Monitoring.
NEW PHOSTOXIN LABELING
California Department of Pesticide Regulation 1001 I Street, Sacramento CA October Application Phase Module 1.3: Exterior Walk Around Structural.
California Department of Pesticide Regulation 1001 I Street, Sacramento CA October Aeration Phase Module 2.1: California Aeration Plan (CAP)
California Department of Pesticide Regulation 1001 I Street, Sacramento CA October Application Phase Module 1.5: Observing the Application.
California Department of Pesticide Regulation 1001 I Street, Sacramento CA October Application Phase Module 1.1: Document Review Structural.
Fall Protection Training. - Falls remain the number one cause of fatalities in the construction industry. FALL PROTECTION FACT!!!
Confined Spaces. Definition: Are large enough that an employee can bodily enter them Are not designed for continuous occupancy. Have limited or restricted.
1 Welcome to CONFINED SPACE ENTRY. 2 INSTRUCTORS Brian Hitt.
Means of Egress Don Ebert- Risk Manager (509)
Day 2 Part 1 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
Day 1 Part 4 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
Day 2 Part 2 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
Day 4 Part 2 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
 History of the Silica Standard  Procedural Background  Publication of Final Rule  Legal Challenges to the Final Rule  Obligations under the Standard.
29 CFR Subpart G.  General Industry Is large enough and so configured that an employee can bodily enter and perform assigned work Has limited.
Application Exclusion Zone/ Protections During Applications Region 3 WPS Training April 11-12, 2016.
Trench Hazards Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 3.
Confined Spaces in Construction Identification Training
CONFINED SPACE ENTRY TRAINING PROGRAM
Energy Control (Lockout/Tagout)
Fumigation Updates Presented by: Blanca Enriquez-Pratt
Issue Entry Permit Training.
2017 Crawl Space Olympics Round 1
First Break To establish minimum safety requirements when performing a first break “First Break” – Refers to the initial opening of piping/equipment.
System Lock Out/Tag Out and Line Breaking GSS24
Oleh : Ir. Sjaifuddin Thahir, MSc.
TRENTON Casing Filler Presentation
Control of Hazardous Energy
Manual D Duct Sizes Room Cooling CFM % Total CFM Heating CFM Kitchen GR Dining Bed Bed 3.
Welding Fumes and Gasses
LOCKOUT/TAGOUT By: Kory Hildebrand.
Presentation transcript:

Overview of ENF : California Aeration Plan for Structural Fumigations (a.k.a. “CAP 2013”) Dublin, CA September 25, 2013 Peggy Byerly DPR Enforcement Branch

CAP Presentation Overview Key Points covered include:  3CCR 6780 & B1 fumigation safety plan  Overview of ENF CAP:  Requirements vs. Advisory Language  Tables 1 & 2  CAP 6 Steps  New CAP Section: “Blow Opens” 2

3CCR 6780 & B1 Fume Options 6780(c): 6780(c): Upon written application by an employer, the director will review and may accept a Fumigation Safety Program that describes methods, work practices, devices, or processes which the Director determines will ensure that employees will not be exposed to concentrations of fumigants in excess of the Permissible Exposure Level 3

CAP Fume Prep: Internal Openings CAP 2013 Revision:   The section stating “Open all operable & accessible doors & windows including attics, storage chests, cabinets etc. has been removed from CAP.   This violation must now be written only as “no” for FAC only, not as a CAP (3CCR 6780) violation. 4

CAP Fume Prep: Internal Openings Each operable attic access must be open …[but] if there are multiple access areas [to the same attic]… a circulation fan is NOT required at each access point. “Direct a circulation fan into each attic” 5

CAP Fume Prep: External Openings New CAP 2013: Attached Storage Sheds For “storage sheds” under staircase or attached on outside of structure…   Extra circulation fan not needed in the shed   Shed w/operable window: open > 3 inches   Shed w/o window: open door > 3 inches & secure against unauthorized entry 6

CAP Fume Prep: Aeration Devices New CAP 2013: Minimum thickness/durability   Aeration ducting, duct covers, inlets, and inlet covers… must be constructed of material w/same retention & durability capabilities (at least 4 mil thickness) as required by SF labeling & 16 CCR (b) 7

CAP Fume Prep: Aeration Devices For tarpaulin fumigations, aeration equipment is installed PRIOR to [introduction of] fumigation, so aeration can be initiated from outside the fumigated space 8

CAP Fume Prep: Aeration Ducting New CAP 2013: Ducting Reinforcement   Aeration ducting shall be constructed in a manner that maintains its minimum 18-inch diameter without being inflated by the airflow of the fan…   Intention is for ducting to have the same internal size…whether the fan is operating or not… 9

CAP Fume Prep: Aeration Ducting CAP 2013 Revisions: Ducting Installation   Connect [18 inch fan to ducting…] so the ducting does not easily collapse or restrict air flow when installed through the tarpaulin or when it is extended… 10

CAP Fume Prep: Aeration Ducting CAP 2013 Revisions: Ducting Placement .  Position the ducting so the release point…is outside the tarp and fumigant is discharged vertically.   Place aeration ducting in an open area away from sensitive sites such as occupied structures. 11

CAP Fume Prep: Aeration Ducting CAP 2013 Revisions: Ducting Placement Advisory   Whenever practical, spacing aeration ducting across the side of the structure…helps to facilitate aeration… 12

CAP Fume Prep: Aeration Ducting CAP 2013 Revisions: Duct Cover   The duct cover shall not restrict or block the aeration duct opening after the duct cover is removed… [in CAP Step 1] 13

CAP Fume Prep: Aeration Ducting 14 “GARLIC TOP” Industry slang for a duct or its cover that partially or completely collapses on itself When fan is operating, causing obstruction of air flow: during Aeration Phase “Garlic Top” (Full or Partial Blockage) would be a CAP Violation

CAP Fume Prep: Inlet Devices CAP 2013 Revisions: Inlet Devices Advisory   Objective of inlets…draw in fresh air & promote cross-ventilation   Inlet size & spacing across side of structure…influence/help facilitate aeration of the structure 15

CAP Fume Prep: Inlet Devices CAP 2013: 6 Inlet Requirements “Inlet Devices MUST…” Maintain the integrity of required opening Have an opening of at least 240 square inches minimum up to a maximum opening of 381 square inches 16

CAP Fume Prep: Inlet Devices CAP 2013: 6 Inlet Requirements “Inlet Devices MUST…” Have the opening covered w/material allowing ventilation, such as mesh, net, or wire… Be located where the opening is not blocked & will draw in fresh air to create negative pressure & promote cross-ventilation of the structure… 17

CAP Fume Prep: Inlet Devices CAP 2013: 6 Inlet Requirements “Inlet Devices MUST…” Have the entire inlet opening be at least 4 feet above exterior grade Be sealed in a way that allows external* opening during aeration 18 *INLETS ARE NOT REQUIRED TO BE OPENED “REMOTELY” LIKE DUCTING BECAUSE FANS ARE ALREADY TURNED ON

CAP Inlet Device Requirements Inlet Device Placement ADVISORY  Whenever possible, place inlets on the side opposite from where the aeration ducting is located… 19

CAP Table 1: Inlets CAP 2013 Additional: Inlet Size Range  In addition to changing the minimum size of each inlet, Table 1 now has a maximum inlet size  Total number of inlets required per size of structure in cubic feet with “options”  New examples of how to calculate # inlets & DAFs needed for that size structure 20

CAP Table 1: # DAFs vs # Inlets When the structure’s size in cubic feet has been determined by the PCB, review CAP Table 1 for the minimum number of ducted air fans & inlet devices req’d [Table 1 # DAFs per cubic feet didn’t change] CAP 2013 Change In Table 1: Determining the total # Inlets per size of structure is based on a “range” calculation CAP 2013 Change In Table 1: Determining the total # Inlets per size of structure is based on a “range” calculation 21

CAP 2013 Revision: Inlet Size Range  Minimum Inlet Size decreased from 254 square inches (approx. 16” X 16”) to the new minimum inlet size: 240 square inches (~15.5” X 15.5”) AND  Now there’s also a maximum inlet size 381 square inches (~19.5” X 19.5”) 22

CAP 2013 Revision: Inlet Size Range  Minimum Inlet Size = 240 square inches 2 inlets this size = 480 sq. inches 3 inlets this size = 720 sq. inches 4 inlets this size = 960 sq. inches  Maximum inlet size = 381 square inches 2 inlets this size = 762 sq. inches 3 inlets this size = 1,143 sq. inches 4 inlets this size = 1,524 sq. inches 23

CAP Table 2: Aeration Hours Once the structure’s cubic feet is measured and the sulfuryl fluoride label calculations for concentration of fumigant are known, consult CAP Table 2 to determine minimum number of hours aeration time. Example: For < 16 ounces SF per 1K cu ft Minimum Aeration Time = 12 hours 24

25 CAP 2013: Intro To The Steps “Aeration & Reentry”   All of the following CAP steps (1-6) must be completed in sequence…   [But when multiple] tasks in each step, they may be accomplished in any order   Licensee (B1 Operator or Field Representative) must be present for & assure completion of Steps 1-6

CAP 2013: Step 1 - Initiating Aeration (“Aeration Fans On”) Step 1 Remove seal(s) from each previously installed exterior duct(s) and Activate aeration fans from outside (by “remote activation”) Sdkl;j 26

CAP Step 2 (Initiating Aeration: “Inlets Opened”) Step 2 [“After ALL (ducted) aeration fans are activated…”] Remove inlet cover (seals) from each of the previously installed inlet devices 27

CAP Step 3 (“Fans Off”) Step 3 Anytime after the required # hours of aeration specified in Table 2 are completed… Turn off the aeration fans 28

CAP Step 4 (“Tarps Off”) Step 4 (After fans turned off) Remove all tarpaulins and/or seals from the structure… Do Not Enter structure w/o SCBA or Continuous Monitoring until Step 6 completed 29

CAP Step 5 Licensee assures:  IF central air/heating systems, turn on the fan/blower ONLY for each operational unit…  OR a circulation fan may be placed in front of furnace inlet to blow air into the heating/cooling ducts  Remove all chloropicrin pans from the fumigated space 30

CAP Step 6 (Ready To Clear For Re-entry)  Next measure the concentration of fumigant in breathing zones using approved fumigant detection device per the registered label. If structure tests < 1.0 ppm, it’s ready for Certification… 31

CAP Step 6 (Clear For Re-entry) OR…  If concentration measures > 1.0 ppm, or warning agent detected, open operable doors & windows for additional ventilation (usually a few minutes) until detection device confirms < 1.0 ppm & structure may be re-occupied 32

CAP 2013 New Section: “Blow Opens” 33 Photo contribution for training purposes from Santa Barbara CAC

CAP 2013 Additional: “Blow Opens”   CAP 2013 new section states the options depending upon what time in the fume process the tarps open…   First paragraph clarifies PCB must still comply with 3CCR 6780 for “blow opens”…   Determine SF level in the exterior workspace before resealing or removing tarps. If SF level > 1.0 ppm in the exterior use SCBA when reseal/remove tarps… 34

CAP 2013 Additional: “Blow Opens” If fume is “finished” (estimated # hours exposure long enough to control the pest treated):   Can be resealed & aerated using CAP OR   If cannot be resealed, tarps can be removed BUT aeration must be completed using SF labeling “Aeration Procedure 1 or 2” 35

CAP 2013 Additional: “Blow Opens” If fume is NOT “finished” (insufficient # hours exposure to control the pest treated):   Can be resealed, more fumigant added if necessary, & aerated using CAP   If cannot be resealed (fume job to be rescheduled), tarps can be removed BUT aeration must be completed using SF labeling “Aeration Procedure 1 or 2” 36

ANY OTHER CAP CAPQUESTIONS??? See PB During the break