NARAGHI HALL 3 rd FLOOR VENTILATION MANAGEMENT IMPROVEMENT BEST PRACTICE AWARD HVAC DESIGN/RETROFIT 2014 CALIFORNIA HIGHER EDUCATION SUSTAINABILITY CONFERENCE.

Slides:



Advertisements
Similar presentations
Tom Johanson – DNV KEMA Senior Engineer Building Automation Systems.
Advertisements

Airflow and BSC Biosafety and Biosecurity Awareness Training
Demand Ventilation Control Systems for Commercial Kitchens NEBB February 24, 2012 Presented By: Mike Dean.
The Role of Controls for Indoor Air Quality Kent W. Peterson, PE, Fellow ASHRAE P2S Engineering, Inc. Mid Columbia ASHRAE Chapter.
Innovative Air Distribution for Healthcare Facilities.
Variable Frequency Drives VFD Basics
Engineering Controls and Laboratory Design Session 4 Laboratory Safety Training.
Break Out Session 3: Group A: Ventilation and Air Quality Chris Cosgrove, Cosgrove FDS, Inc.
Lab Energy Management Big Ten Mechanical & Energy Conference October
Field Challenges with DCV Systems Dr. Andrey Livchak, Derek Schrock and Jimmy Sandusky Halton Group Americas
Presenters: Bob Kilgore Matthew McReynolds Brenna Goode CHEMISTRY BUILDING RCX.
Energy Efficient Operations: Giving facility operators the tools to optimize building performance The B3 Energy Efficient Operations Manual Garrett Mosiman.
When Do Variable Flow Fume Hoods Save Energy? Implications for lab design and behavior modification Michael Gevelber, Robert Choate, Kevin Sheehan, Brian.
Siemens Building Technologies, Inc. ED&G 100 Design Project Fume Hood Face Velocity Control Spring 2004.
ASHRAE Club Project VAV Fumehood Retrofit - Engineering III Building Engineering III Building 40,000 gsf Completed 2002 Designed and constructed in two.
Zettl Group Safety Talk ~Fume Hoods~ 09/28/06 Takashi Ikuno.
Welcome to the Webinar! We hope you are logged in properly, if you are having trouble call We hope you are logged in properly, if you are.
1 Meeting ASHRAE Fundamentals, Standard 55 & 62.1 with Chilled Beams Displacement Ventilation.
Peter Duby, Pepperdine University Gabriel Ayala, Enovative Group Inc.
ENERGY CONSERVATION & MODERNIZATION FOR GLENDALE COMMUNITY COLLEGE
Lindab Pascal - Simplified VAV solution with full potential...
Patent-pending upgrade solution that reduces Constant Volume HVAC System overall energy consumption by 25% to 40%. Patent-pending upgrade solution that.
Toward a Sustainable Campus Part II: Improving the Efficiency of the CNS Building Energy Systems Nitin Rajan ‘07 Physics Department Ithaca College.
Energy Recovery System Hadi Fattah Chris Korkuch Scott Lacey Ryan Neary Colin O’Neill.
Brett Graham Habegger Corporation Midwest Regional Sustainability Summit May 1, 2015.
Active beams versus VAV with Reheat Analysis of May 2013 ASHRAE Journal article Ken Loudermilk Vice President, Technology & Developement.
Premium Ventilation1 Eugene Water & Electric Board.
Safety Meets Sustainability Rob Klein, MS, CIH Environmental Health & Safety Yale University New Haven, CT Making Universities Sustainable Copenhagen,
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Implementing Demand Controlled Ventilation to Meet ASHRAE Standard By Klas C. Haglid, P.E., R.A., CEM 1.
Examples of Commissioning Cost Savings Commissioning for Sustained Building Performance September 29, 2011 Marriott Birmingham, AL.
AIR QUANTITY REQUIRED TO TRANSFER HEAT IN A FORCED AIR SYSTEM In all four mechanical systems considered, the transfer of heat, either by taking it out.
Best Practices in HVAC Design/Retrofit
Green Building Demonstration Project Adam Saling City of San Diego.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
Rooftop Package HVAC Operations and Maintenance Measures: David Baylon Stan Price Bob Davis.
Constant Volume Regulators
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Smartcool Systems Inc. Providing effective and reliable energy efficiency solutions for HVAC-R customers around the globe.
Name of Building(s) or Project Speaker(s) Organization(s)
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
Greening Your Lab Responsible Conduct of Research Duke University October 8, 2013.
How Facilities Can Help Commitment by facilities director Facilities energy committee Energy officer position Include conservation commitment in: Strategic.
Roof Top Unit Overview (MAGNUM) Visit us at Revision- 12/17/2015.
HVAC – Air Handling Unit Heating Ventilating AC =Cooling HVAC – Basic Terms hQ = 200,000 Btu/h CO2 20 cfm/ pers 50 people 1000 cfm cQ assume to = 20 tr.
Wurster Hall MBCx Project October 30th, Project Overview Project Goals Project Objectives Identify Low Cost/No Cost Measures Identify Retrofit.
Prepared For: Prepared By: 100 Montgomery Street, Suite 600 San Francisco, CA Market Street San Francisco, CA The Benefits of Retrocommissioning.
Hilario J. Negrón (787) ext 3223 (787) Measuring Operational Efficiency.
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Incorporating Energy Conservation Strategies into University Research.
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
Heat Pump Water Heaters: Interior, Ducted Installations Presentation to the Regional Technical Forum December 13, 2011 Ben Larson, Ecotope
HVAC Energy Efficiency using Mass Flow and Building Pressurization Jay Richardson Professional Supply, Inc.
AstraZeneca R&D Boston Waltham Energy Reduction Initiative 2016 Green Labs Symposium.
Implementing Wind Responsive VAV Exhaust Systems at NREL's ESIF Building: A Four-Year Follow-Up Otto VanGeet, PE, NREL Brad Cochran, CPP I2SL -August 29,
Airflow Measuring Stations
Successful Energy Conservation Projects at University Research Labs
National Grid Your Partner in Energy Solutions
Maria’s Restaurant Chapter 1 Section 4
Whole Building Retro-Commissioning at BU’s Photonics Center
SCHOOL OF FOREST RESOURCES BUILDING
Session 10 –roundtable – Labs and Controls Systems
By: John D. Villani, P.E., LEED AP, QCxP, CEM, GBE
SMART VENTILATION BEST PRACTICES
HCB 3-Chap 19A: All-Air Systems_Single Zone
تهیه و تنظیم: مهندس همت جو
High Performance HVAC Installation
Exhaust Hood and Makeup Air Optimization
Weather and Your Restaurant’s Operational Costs
Minimizing Heating & Cooling Costs
Presentation transcript:

NARAGHI HALL 3 rd FLOOR VENTILATION MANAGEMENT IMPROVEMENT BEST PRACTICE AWARD HVAC DESIGN/RETROFIT 2014 CALIFORNIA HIGHER EDUCATION SUSTAINABILITY CONFERENCE SAN DIEGO STATE UNIVERSITY Geng Liu Energy Manager, CSU Stanislaus Brady Nations Regional Manager, Aircuity

Naraghi Hall of Science, 3 rd floor lab spaces  Occupied 2007  Third floor included special lab spaces  Designed for constant 10 ACH, 24/7

Aircuity retrofit project objectives  Implement demand control ventilation  13 lab areas  Implement new hood minimums based on ANSI Z9.5  Minimum flow when hood closed  Cooling & Heating prevented reaching full Z9.5 min  100 FPM Face velocity maintained in all cases  Convert constant volume EF w/ bypass dampers to VFD

Bringing projects to reality  Identify Energy Saving Opportunities  Perform Feasibility Study  Project Fund Availability  Management successfully implements energy saving projects, and savings are put to work on additional future energy projects

Results Reduced Average airflow from 22,100 to13,900 CFM EF speed reduction from Constant 60 Hz to Avg. ~40 Hz Energy 492,000 kWh 492,000 kWh 14,213 Therms 14,213 Therms All From ~ 16,000 Sq. Ft.

Results: Additional benefits of Project  Reduced Noise Level-Indoor  Reduced Noise Level-Outdoor  Significantly reduced fire damper malfunctions & resulting pressure problems  Widened unoccupied temperature deadband

Project Economics Total Cost $190,000 Annual Cost Savings Achieved ($/yr) $63,413 Simple Payback Before Incentive 3.0

Understanding DCV Traditional approach: 10 ACH 24/7 Just in case there’s something there.

Does this room need 10 ACH?

Principle of DCV Continuously measure for airborne contaminants When present: VENTILATE at design levels When not present: Use energy effective level

Example of contaminant measurement

Lab contaminant event

The Aircuity System Continuously monitors for airborne contaminants TVOCs Airborne Particulate CO 2 CO When presents “requests” additional ventilation Always active Not an override

Typical Lab Design showing OptiNet Fume Hood Supply Air General Exhaust Hood exhaust Ventilation Controls OptiNet Sampling Point OptiNet Sensor Suite

Sensor Suite (SST) Houses the critical instruments Located in an equipment room All service work is done here.

ADR 1ADR 2ADR 3ADR 4ADR NMAC 306 CHEM STOCK Supply Air Measurement West Outside Air measurement 310 Instrument 312 Phys. Chem. Instrument 314 Prep. 316 NMR Centralized Sensing System 323 BAL 325 Group study 334 Biotech W. 329 Env. Cab. Supply Air Measurement East 330 Sci. App. 331 Microbiology 332 Biotech Prep. 334 Biotech. E Located in IDF room Monitored Labs Reference points Sensor Suite ADR (typ) ADR : Air Data Router

Questions?

Thank you