21/22 September 2002IMACS update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 21/22 September 2002 Boston, MA.

Slides:



Advertisements
Similar presentations
M2FS SAC UpdateMarch 18, 2012 System Overview: M2FS Spectrograph Two independent, identical channels Each fed by 128 fibers Each with LoRes and HiRes modes.
Advertisements

University College London, Optical Science Laboratory bHROS Progress bench-mounted High Resolution Optical Spectrograph bHROS bHROS Progress General.
MMIRS 1 MMIRS MMT and Magellan Infrared Spectrograph Brian McLeod.
CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
PSI: Polarimetric Spectroscopic Imager - A Simple, High Efficiency, High Resolution Spectro-­Polarimeter Samuel C. Barden Frank Hill.
Spectral Resolution and Spectrometers
Spectral Resolution and Spectrometers A Brief Guide to Understanding and Obtaining the Proper Resolution of the 785 Raman System.
Keck I Cassegrain ADC: Preliminary Design Overview UCO/Lick Observatory 15 October 2003.
Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
LBT AGW units Design Review Mar.2001 General Concept Performance specifications and goals The off-axis unit The mechanical support structure The control.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
M2FS: Michigan/Magellan Fiber System. M2FS (Michigan/Magellan Fiber System) Fiber-fed MOS w/2 independent and identical spectrograph arms 256 total fibers.
LBC-Blue pre-commissioning LBC-Blue LBC-Blue –E Giallongo (PI) Rome: diPaola, Pedichini, Speziali, Testa, Gallozzi Rome: diPaola, Pedichini, Speziali,
Figure 1, MODS exploded Figure 2, Blue Camera Design Figure 3, Blue Camera Structure Figure 4, MODS CCD Dewar Figure 5, MODS I 4k x 4k CCD Figure 6, QE.
1 Large Synoptic Survey Telescope Review Kirk Gilmore - SLAC DOE Review June 15, 2005.
MMT Magellan Infrared Spectrograph ( MMIRS ) P.I. Brian McLeod Warren R. Brown SAO/CfA.
2.4m Telescope Group Yunnan Observatory of CAS Status of LiJET Project & The Coude Echelle Spectrograph for the Lijang 1.8m Telescope China-Japan Collaboration.
Technical manager’s report September Telescope activities Primary mirror hardpoint repair New mirror actuator controls Collimation analysis F/5.
Corner Raft Test Station Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
MCAO Adaptive Optics Module Mechanical Design Eric James.
18/19 January 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 18/19 January 2003 OCIW, Pasadena,
SALT HRS Lisa Crause for Durham CfAI & SALT Ops SALT Board Meeting #35, Chapel Hill, 5 June 2014.
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
HESSI Imaging Capability Pre Environmental Review Brian R. Dennis GSFC Tuesday, February 29, 2000.
STATUS REPORT OF FPC SPICA Task Force Meeting March 29, 2010 MATSUMOTO, Toshio (SNU)
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,
Oct 17, 2001SALT PFIS Preliminary Design Review Optical Integration and Test Plan 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Optical.
Magellan F/5 System Status A.Szentgyorgyi/SAO/25 Sept 2004.
High Resolution Echelle Spectrograph for Chinese Weihai 1m Telescope. Leiwang, Yongtian Zhu, Zhongwen Hu Nanjing institute of Astronomical Optics Technology.
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
Optical Aeronomy Calibration Facility CEDAR WORKSHOP JUNE, 2007 Jeff Baumgardner, Center for Space Physics Boston University.
Multiplexed High Res Spectroscopy at Keck – J. Cohen (PI), H. Epps (Optical Design), M. Rich (Project Scientist) Keck instruments for optical spectroscopy.
NIRSpec Operations Concept Michael Regan(STScI), Jeff Valenti (STScI) Wolfram Freduling(ECF), Harald Kuntschner(ECF), Robert Fosbury (ECF)
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 6-7 October.
DECam Daily Flatfield Calibration DECam calibration workshop, TAMU April 20 th, 2009 Jean-Philippe Rheault, Texas A&M University.
Opto-Mechanics for SNAP at UM
The Prime Focus Imaging Spectrograph Design and Capabilities
13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report April.
Henry Heetderks Space Sciences Laboratory, UCB
SNAP Calibration Program Steps to Spectrophotometric Calibration The SNAP (Supernova / Acceleration Probe) mission’s primary science.
Magellan Telescopes Instrumentation: A Critical Assessment of Current Status.
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
Binospec - Next Generation Optical Spectrograph for the MMT
DBSP-R Upgrade Progress Review The DBSP-R Team DBSP-R Progress Review.
9/24/05MagE Update SAC meeting Developments with MagE Complete layout of Spectrograph structure and camera by B. Bigelow –Structure will be all anodized.
Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.
System Performance Metrics and Current Performance Status George Angeli.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
IMACS Multi-Object Echelle B. Sutin, T. Hare & A. McWilliam & many others N *Not yet released *
IFS prototype – PM3 LAM, 13/06/2003 Prototype testing at CRAL Tests at room temperature in the visible.
Astronomical Observational Techniques and Instrumentation
Magellan Telescopes Observatory Report Personnel Accomplishments Observing Statistics Common Problems Work in Progress.
Oct 10, 2002SSWG1 Prime Focus Imaging Spectrograph Status Engineering Status Optics Mechanical Control System Management Budget Schedule.
Mar 18, 2003PFIS CDR1 Control System Summary of Changes Since PDR All the motors, drivers, sensors, switches, etc. have been chosen Built up a mechanism.
Experiments and Design of a wavelength calibration procedure for MOSFIRE Principal Investigator: David Guerrero, Cal Poly SLO Research Advisor: Ian McLean,
FIRE: Status update and Preliminary Commissioning Plan Rob Simcoe (A. Burgasser, M. Smith, R. Bernstein, B. Bigelow, J. Pipher, C. McMurtry, W. Forrest)
Oct 17, 2001SALT PFIS Preliminary Design Review Control System 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Preliminary Control.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Single Object & Time Series Spectroscopy with JWST NIRCam
Prime Focus Imaging Spectrograph Status
Image Stabilization System (ISS)
FourStar 4K x 4K JHK imager
Control System Summary of Changes Since PDR
Optics Alan Title, HMI-LMSAL Lead,
Presentation transcript:

21/22 September 2002IMACS update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 21/22 September 2002 Boston, MA

21/22 September 2002IMACS update2 IMACS project team: A. DresslerPr. Investigator B. BigelowInstrument Scientist B. Sutin, H. EppsOptical des./eng. B. Bigelow, T. Hare S. Gunnels, G. Luppino, R. Cleary Mechanical des. V. Kowal, R. Storts, J. CastilloMechanical fab. A. Bagish, D. Carr, J. AsaElectronics G. Burley, I. Thompson, J. EstradaDetector systems C. Birk, K. ClardySoftware eng.

21/22 September 2002IMACS update3

21/22 September 2002IMACS update4

21/22 September 2002IMACS update5

21/22 September 2002IMACS update6

21/22 September 2002IMACS update7 Optics Status: Collimator: C01 (Field lens) Done, installed C02 - C05Done, installed Long Camera: L01-L06Done, installed Short Camera: S01, S08At Tinsley, near completion S02,3,5,7,9Done, ready to mount S04At TORC, second blank S03, S09Mounted in cells

21/22 September 2002IMACS update8 Carnegie S01 Aspheric lens, Global surface figure error based on average of two full aperture grid measurements RMS =.215 waves / 244mm CA. RMS Slopes of this global grid when frequency filtered for periods of 1cm and longer = 18 u-radians.

21/22 September 2002IMACS update9 Carnegie S08 Aspheric lens, Global surface figure error based on average of two full aperture grid measurements RMS =.216 waves / 224mm CA. This is preliminary data. We are going to re-measure the 90 rotation half of these and Re-average with zero. Slope measurements with fine line scans are being acquired.

21/22 September 2002IMACS update10 Optics Status cont. Filters:2 sets of CTIO B,V,I,Done 2 sets of CTIO RDone CTIO U (LCAM)Awaits ADC coating Sloan u’, g’, r’, i’, z’Not ordered Grisms:200 l/mmDone, ready to mount 300 l/mmPolishing at HJOL 600 l/mmAt STF for AR coating Imaging Mirrors:Al mirror mounted Ag mirror done

21/22 September 2002IMACS update11 200l/mm grism delivered

21/22 September 2002IMACS update12 Current grating selection:

21/22 September 2002IMACS update13

21/22 September 2002IMACS update14 First light! 07/18/02

21/22 September 2002IMACS update15 Mechanical Engineering Status: Guide camera stages (Hare)Done, mounted Calibration lamp system (Hare)IP Mask server (Bigelow)Done, mounted Field Lens (Hare)Done, mounted LCAM shutter (Hare)Done, mounted Filter servers (Bond) Done, 1 mounted Disperser server (Hare)Done, except drive - Grating cells2 of 6 mounted - Grism cellsFinal design IP - Mirror cellsDone, 1 mounted

21/22 September 2002IMACS update16 Mechanical Engineering cont. Collimator mech. (Bigelow)Done, mounted Long camera mech. (Bigelow)Done, mounted Short camera mech. (Bigelow)Done, assy IP Dewar (Luppino)Done, mounted Instrument Structure (Gunnels)Done Instrument Carriage (Gunnels)Done Instrument Enclosures (Gunnels)Done, minor mods IP Instrument Utility wrap (Gunnels)IP

21/22 September 2002IMACS update17

21/22 September 2002IMACS update18

21/22 September 2002IMACS update19

21/22 September 2002IMACS update20

21/22 September 2002IMACS update21 Electronic Engineering: Alan Bagish (OCIW) is completing the electronics design for IMACS. Joe Asa is providing final assembly services on a consulting basis. Status of electronics: Schematics design (all motion stages)Done (4) Motion control (MC) chassis, Done (1) Power supply chassis, Done (1) Shutter control chassisDone (2) Electronics racks for chassisDone Instr. wiring harnessesIP

21/22 September 2002IMACS update22 Detector systems: Guide cameras: - 23 cameras have been fabricated - IMACS currently has one of three needed - Remainder by? Science array: - First light on 4 CCDs - 7/18/02 - Filled array of 8 CCDs flat to ~40 microns - not done - Individual detectors flat to 13 microns - Electronic/software integration IP

21/22 September 2002IMACS update23 Slit Mask Cutting (Clardy) : - Mask Generation (MG) IP inputs - images, data files, other output - text file with targets, names, etc. - Mask Definition (MD) Done - inputs - text file from MG, other text files - output - mask definition file - database for observing, data reduction - Mask Fabrication (MF)Done - inputs - mask definition file - output - test, laser G-code, mill G-code,.ps files

21/22 September 2002IMACS update24 Software: Instrument Control (Birk) Individual module testing: ModuleGUI statusH/W tests Pr. Guiderdone80% SH guiderdone80% CF guiderdone90% Slit Mask Serverdone75% Disperser Server50%10% Long Camera Focusdone90% Filter Servers (2)done90% Flexure Controldone75% Detector Focus50%10% HP Sensor Systemdone60%

21/22 September 2002IMACS update25 Software: Instrument Control cont. Integrated instrument testing: - One GUI at this level, showing all critical aspects of each module (encoder positions, limit status, temperatures, etc). - This GUI is written and 75% tested, unfinished stages remain (Disperser Server, Grating tilts, detect. focus) User Level Software: - Two GUIs at this level: - Instr. control interface (select a grating, etc.) - 60% done - Graphical Instr. Status Display - 40% done

21/22 September 2002IMACS update26 Software: Science Array Control (Birk) Shutter control: - micro-controller for linear motors90% done - still need to test second (s-cam) shutter CCD readout / camera control: - “ccdserver” for array readout - “camgui” for user interface - both are functional75% done Quick-Look Tool: - functional with *real* data90% done

21/22 September 2002IMACS update27 Slit Masks: Laser system: - Convergent Gemini 150 W. CO2 laser cutting system - Installed and operational at LCO ASB Facility upgrades: - 200A electrical service Done - Air compressor systemDone - Ventilation, fire, and fume extractionIP

21/22 September 2002IMACS update28

21/22 September 2002IMACS update29

21/22 September 2002IMACS update30 Slit Masks: Slit mask blanks: - Fabricated by California Hydroforming - First order of 100 mask blanks complete, at LCO Mask fabrication cost: - Estimated to about $150 per mask including laser - Approx. $100 materials and hydroforming - Approx. $50 for laser cutting (500 masks/year, 10 years)

21/22 September 2002IMACS update31 Coming up: - F/2 camera opto-mechanical assembly 9/ /02 - F/2 camera shutter completed by end of 9/02 - Utility wrap and wiring harnesses installed by end of 10/02 - Enclosure and hatch completed by end of 10/02 - DSS drive and GTM complete by end of 10/02 - Gratings and grisms in cells by end of 10/02 - Calibration lamps installed by end of 10/02 - Final testing 10/02-11/02 - Pack and ship by middle of 12/02?

21/22 September 2002IMACS update32

21/22 September 2002IMACS update33 Argon spectrum – 600 l grating, f/4 camera (09/18/02) Å/pixel, ~0.8Å FWHM

21/22 September 2002IMACS update34 The IMACS fiber positioning system...

21/22 September 2002IMACS update35 IMACS confirms life on Earth: O 2 lines (B-band) in red Solar spectrum

21/22 September 2002IMACS update36 …holding the objects in the slits while guiding. Measurements are of the principal guider with respect to the slit mask. Good result.

21/22 September 2002IMACS update37 Shack-Hartman guider relative to the slit mask. This guides rotation. Close to specifications (within spec if you consider only about 1 hour exposures), but there is a balance issue as the barrels are swapped that we should be able to overcome

21/22 September 2002IMACS update38 Structure flexure with rotation is approximated by 0.6 arcsec circle. Hysteresis is minimal, ~0.3 pixels. Open loop correction should be sufficient for all but the most demanding spectral programs (stability better than 0.2 pix) Piezo control 3-day test: 0, -90, -180, -270

21/22 September 2002IMACS update39 Latest test of flexure of grating tilt mechanism. Spatial drift reduced to an acceptable level (<2 pixels = 0.20 arcsec) for full rotation of structure. Grating rotation within acceptable range if motor/encoder can steer it out – yet to be confirmed.

21/22 September 2002IMACS update40 Outstanding issues as of Sept ‘02 Flexure of centerfield guider Assembly and test of f/2 camera Grating tilt mechanism – meeting specs Operation of full 8K x 8K mosaic and test of full field image quality