Millipore DI Water Purifier Ron Kmak, Zeljko Matijas, Laura Skubal, Dean Walters, and Bob Wagner 28 September 2011.

Slides:



Advertisements
Similar presentations
Chemistry safety Self-Test
Advertisements

DOT 1 January , 1990 DOT 2 July 23 - August 3, 1990.
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSAT/SUN Note: You can print this template to use as a wall calendar. You can also copy the slide for any month to add.
School Year Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
School Year Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
2007 Monthly Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation. If you’d like to change.
2012 Monthly Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
1 BROOKHAVEN SCIENCE ASSOCIATES Preparations for Linac Commissioning Ray Fliller, Associate Physicist 8 th ASAC meeting for NSLS-II Project May 10-11,
 Remembering Joan on the 5 th Anniversary of her death.
John Teaching Calendar. NIV Comm April 2006 MondayTuesdayWednesdayThursdayFridaySaturdaySunday (1:1– 18) Dan.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Line Graphs. Lets look at some average temperatures from some cities around the world…
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Training Session August 11, Nitro Express Features Probe or probeless operation from the same unit Compact splash resistant ABS enclosure Pre-wired.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Photo-detector Tube Construction Laboratory Considerations Dean Walters Argonne National Laboratory.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
General Chemistry Laboratory CHE116/CHE118 Safety Aspects for Lab Work to Supplement Student Laboratory Safety Contract CHE116/CHE1181.
Refurbished Booster RF John Reid October 24, 2012.
1 July 13, 2011 Some morning photos Tank Valve Box.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
® February 25, ®  February 25 th - IRP Schedule - Review of IRP Order - December 5 th Weather Event - Wexpro II - Master Planning of System.
January 2004 SundayMondayTuesdayWednesdayThursdayFridaySaturday Mice arrive□ Mite spray □ Med feed Mice arrive □ Normal feed Mice arrive
NON-ACADEMIC POLICY TIMELINE For February 2010 Policies of great importance or policies that relate to a University regulation may need to go to the BOT.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Progress of Cold Top Seal for 1 & 4 inch Test Pieces Dean Walters Bob Wagner Argonne National Laboratory Marc Kupfer Ernesto Indacochea University of Illinois.
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
Design Update Puck and Gun Magnet February 16, 2016.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
The easiest way to access Pure & Ultra Pure Water from tap
At the Frog rally this past August while visiting the vender booths I won one of the Aqua View Showermisers. ( I had been looking.
on behalf of the RF group
Survey Training Pack Session 9 – Data Entry.
Timeline agreed at planning meeting held on 30th November 2015
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Advantages of Wall Mounted Air Quality Control Systems
McDonald’s Kalender 2009.
April May April May June July July June August Sept August
McDonald’s calendar 2007.
Strategic Planning Timeline Overview
Teacher name August phone: Enter text here.
Circle Chart Template Process Name.
Tropical cyclones movement
February 2007 Note: Source:.
LCLS Vacuum System Plans (July 07)
McDonald’s calendar 2007.
One Coil Gun Magnet February 2, 2016.
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
Change Tested or Implemented
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
ONAP Release Planning DRAFT Proposal
We’re Moving Sydney August edition Read online now.
Presentation transcript:

Millipore DI Water Purifier Ron Kmak, Zeljko Matijas, Laura Skubal, Dean Walters, and Bob Wagner 28 September 2011

Timeline of events 28 April 2011 first discussion of water purifier 26 May 2011 specification of purifier settled on. Discussion of Millipore versus Crossbow purifiers 28 June 2011 Millipore quotation distributed. 7 July 2011 demonstration by Millipore of DI purifier 19 July 2011 requisition entered into the purchasing system 22 August 2011 Millipore enters order into their system. 8 September 2011 Millipore system arrives 15 September 2011 wall brackets mounted on wall September 2011 check out parts fit-up 27 September 2011 Millipore installs unit & trains staff

Planning The DI Water Purifier has been planned for the south west corner of the Wet Lab (C-248). This location facilitates DI water consumption in both the Wet Lab and the Photocathode Lab

Quotation The Millipore Integral 10 system was sized to have the capacity and the flow for the anticipated needs of the Wet Lab. The Integral 10 comes with (2) type 1 water dispensers, ultra pure, and (1) type 2 water dispenser, pure water. – It was noted that SSL uses type 1 water to clean their parts. – The APS clean line uses type 2 water to clean parts for vacuum usage.

Installation Preparations Blank Canvas Bracket Locations

Ready for Installation

Installation by Millipore John Halloran Millipore Corp.

Complete

Future Tasks Dispenser in Photocathode Lab – Cut hole into wall between Wet and Photocathode Labs. – Need either table or shelf for the MilliQ (type 1) dispenser. Fume hood dispenser – Need table or shelf for the MilliQ dispenser – Install feed tube for filling the Citranox or rinse tanks.