Jeff Poupart Water Quality Permitting Section Chief NCDENR / Division of Water Resources.

Slides:



Advertisements
Similar presentations
By Chris Ford and James Hughes ( ) ( )
Advertisements

The Entergy facility is a boiling water reactor with a rated core thermal power level of 1912 MW, providing a gross electrical output of 620 MW. The facility.
Storm Water Regulation: What’s Next? Presented to: September 30, 2014.
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
The Past, Present and Future of Coal Ash Management in Virginia Presentation to the State Water Commission June 23, 2014.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
Notices of Violation, Orders to Cease Operation and Consent Orders.
GEORGIA ENVIRONMENTAL PROTECTION DIVISION SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM.
Governor’s State Water Law Review Committee Recommendations 1982: Implementation Update David G. Baize Bureau of Water.
Deborah M. Smith United States Magistrate Judge District of Alaska LAWS AND LAW ENFORCEMENT RELATED TO FRESHWATER ECOSYSTEMS Second Asian Judges Symposium.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
Coal Ash Ponds The Romeo and Juliet Story of Coal Fired Power Plants Society sees them as toxic together, but currently, one cannot exist without the other.
Locating and Eliminating Illicit Connections June 28, 2006 James Walls.
The North Carolina Dam Safety Program. Our Responsibilities Administration and enforcement of the Dam Safety Law of 1967 and the supplementary Administrative.
2014 Dan River Ash Release-Summary and Update NC Water Resources Congress October 30, 2014.
Waters of the United States Conference of Western Attorneys General July 22, 2014 Deidre G. Duncan.
Trends in Stormwater Permitting Joyce Brenner, P.E. Chief of Stormwater Policy, Planning, and Permitting Division of Environmental Analysis Caltrans Headquarters.
Forest Practices Code Transition Larry Pedersen Chief Forester, MOF.
What’s In Your Water? A Discussion of Threats To Virginia’s Water Quality March 27-­28, 2015 William and Mary School of Law Dr. John L. Daniels, P.E. Professor.
Water Resources In the United States: Perspectives and Challenges by Dr. Jerome Delli Priscoli Institute for Water Resources US Army Corps of Engineers.
Inspection Records and Reports NC DWR, Raleigh Regional Office 3800 Barrett Drive Raleigh NC (919)
Staying on Top of Permits & Public Comments Public Comments Policy Track: Sunday, February 28, :30 pm.
By Ian Mongold DAN RIVER (NC) COAL ASH CONTAMINATION.
Storm Water Pollution Prevention Training
Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator
1 Natural Resource Damages (NRD) – James Woolford Director – Federal Facilities Restoration and Reuse Office/OSWER NGA – Federal Facilities Task Force.
Lake Erie HABs Workshop Bill Fischbein Supervising Attorney Water Programs March 16, 2012 – Toledo March 30, Columbus.
NPDES Compliance Update NCMA Workshop April 1, 2015.
Water Sources and Pollution. Where does our water come from? It comes from 2 sources: 1.Surface water: above ground in lakes and rivers. –Most large cities.
Carrin Williams.  Purity of Waters Act  To assure supplies of clean drinking water  Clean Streams Law  To protect the streams from pollution.
 Why are we here?  Without regulations, rivers used to catch fire. Rules and Regulation.
Claytor Hydroelectric Project Water Quality Study Mark Hutchins, Project Manager January 25, 2007.
Hydrostatic Testing Draft General Permit Draft Permit Stakeholder Outreach Meeting April 23, 2015 Moderated by: Lillian Gonzalez, Unit Manager, Permits.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Surface Water Standards Triennial Review and Implementation Connie Brower Nikki Remington-Julie Grzyb-Sandra Moore NC Division of Water Quality.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
Overview of Civil Judicial Enforcement. Civil Judicial Enforcement  Who may file civil judicial environmental enforcement actions in U.S.? Federal Government.
Advisory Committee Kickoff Meeting SWRCB Program to Develop Sediment Quality Objectives for Enclosed Bays and Estuaries of California July 29, 2003 CAL/EPA.
NTEC -- April 24, Utility Air Toxics Regulatory Finding National Tribal Environmental Council April 24, 2001 William H. Maxwell U.S. EPA OAQPS/ESD/CG.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
WATER QUALITY TOPICS ENFORCEMENT – ARE FINES BECOMING A WAY OF LIFE AT THE DEQ By:Donald D. Maisch Supervising Attorney, Water Quality Division Office.
McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 18 Environmental Law.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
Administrative Law The Enactment of Rules and Regulations.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
Counterclaims Addressing the other side and how to do it effectively.
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
Reclamation of Abandoned Mine Lands: EPA Perspective.
SUPPLEMENTAL ENVIRONMENTAL PROJECTS. KEY CHARACTERISTICS OF A SEP Projects must improve, protect or reduce risks to public health or environment. Projects.
Department of Public Works Submittal of Comments to the County of Los Angeles on the Draft Environmental Impact Report and Proposed Alternatives for the.
Water Quality Rulemaking in Response to S.L
The Fish Kill Mystery For notes and information regarding this activity, please visit:
NPDES Permitting for Coal Ash Ponds in North Carolina EMC Meeting January 12, 2012 Sergei Chernikov, Ph.D. 1.
Connie Brower NC DENR Division of Water Resources.
Department of Environmental Quality January 13, 2016 Environmental Review Commission.
David K. Paylor Virginia State Board of Health March 17, 2016.
Presentation to City Council January 28, Spill Summary January 9, 2014: At least 7500 gallons of an industrial chemical 4-Methylcyclohexanemethanol.
All Sampling Sites March 21, Surface water sampling started February 3 rd Daily until early March Weekly since then.
GEORGIA PACIFIC WEST PROPOSED INTERIM ACTION Public Meeting & Open House – July 12, 2011.
Eden North Carolina Coal Ash Spill Initial Emergency Response North Carolina Emergecy Management Conference Sunset Beach, NC, 2014.
Department of Environmental Quality
Kansas Experience in Technical Negotiations for Tribal Water Right Settlements Symposium on the Settlement of Indian Reserved Water Rights Claims, Great.
Trace Elements in Dan River Sediment after the 2014 Coal Ash Spill Ricardo P. Fernandez, Caleb Shockley, and Madeline E. Schreiber Department of.
Sacramento County Stormwater Quality Program
Pesticides Dashboard and ECHO
Department of Environmental Quality
Mercury TMDL Review & Permitting Strategy Update
EPA Region IV and ADEM NPDES Permit Coordination
Unit 5 Overview In this unit, you will be given an opportunity to apply information presented in the previous units. You will be given a scenario involving.
Sacramento County Stormwater Quality Program
Presentation transcript:

Jeff Poupart Water Quality Permitting Section Chief NCDENR / Division of Water Resources

Questions? Does the New Law Really Impact Facilities other than Duke Has the Coal Ash Challenge changed How DWR interacts with Regulated Industries? 2

Does the New Law Really Impact Facilities other than Duke? Simple answer Yes and No Yes some spill reporting requirements changed No If you don’t burn coal or store combustion residuals

Has the Coal Ash Challenge changed How DWR interacts with Regulated Industries? First let’s start with some background on coal ash

So how did this coal ash stuff start?

TVA Kinston Power Plant

How did we get here In 2012, the Catawba Riverkeeper Foundation and SELC settled suits with SCE&G and Santee Cooper under which they agreed to remove 2.4 million tons and 1.3 million tons of coal ash from the Catawba- Wateree River near Columbia, South Carolina and another plant near Myrtle Beach SELC issues 60 day Notice of Intent to sue in NC to Riverbend and Asheville Duke power plants Spring 2013 NC DENR files for injunctive relief in superior court eventually expands to all 14 plants

How did we get here Throughout 2013 and into 2014 Cases and initial proposed settlement work their way through various court procedures and evidence discovery and motions In the mean time there was another high profile case not related to ash but related to coal that had the publics interest

January 9, 2014 Freedom Industries Charleston, West Virginia Release of up to 7,500 US gallons of crude 4- methylcyclohexanemethanol (MCHM) into the Elk River Crude MCHM is a chemical foaming agent utilized in the processing of coal Outcome Up to 300,000 residents within nine counties were without access to potable water Injuries 169+ affected 14 hospitalized

Groundhog Day February 2, 2014 Pipe collapses at Dan River Facility

~ 30,000 – 39,000 tons of ash from primary ash basin ~ 24 – 27 million gallons of ash basin water What was released?

How and when was the spill stopped? 1. First attempted using an inflatable bladder 2. This process failed several times 3. Next tried to plug pipe at failure point. 4. This process failed due to instability of ash 5. Designed a plug system to fill the pipe from the outlet end with grout/concrete 6. This process was successful on Feb 8 th

48” pipe plugged on Feb. 8 th Plug design used to seal 48”pipe Grout/concrete pumped in to pipe

…So where did all the coal ash go?

Dan River Long Term Remediation Sec. Skvarla requested EPA take role of lead agency under CERCLA for response to Dan River release Response crosses state lines Long term activities being coordinated by Stakeholders Group consisting of EPA, NC DENR, VA DEQ, US FWS, US Army Corps of Engineers, US Coast Guard, Rockingham County, Danville, South Boston, Clarksville and Duke Energy Stakeholders Group meets every Wednesday in Eden, NC Stakeholders Group share and discuss sampling results: - Chemical analyses, sediment sampling, fish community, benthic data, fish tissue, etc. Stakeholders Group coordinate and collaborate to establish long term remediation plan

First coal ash deposit identified immediately downstream of the 48” pipe outlet. Removal of ash deposit completed early March.

Surface Water – through June 2014 Surface Water – through June 2014 Arsenic has decreased from 40 ug/L to less than 2.0 ug/L at Draper Landing by mid-March Arsenic has decreased from 40 ug/L to less than 2.0 ug/L at Draper Landing by mid-March Aluminum & Iron remain elevated at all stations due to background contributions Aluminum & Iron remain elevated at all stations due to background contributions All data posted on DWR website All data posted on DWR website

Sediment Sediment 100 yards from release: 100 yards from release: Aluminum, Arsenic, Barium, Copper, Iron, Mercury Above EPA Screening Values Aluminum, Arsenic, Barium, Copper, Iron, Mercury Above EPA Screening Values Danville: Danville: Aluminum, Boron, Iron & Strontium Above EPA Screening Values Aluminum, Boron, Iron & Strontium Above EPA Screening Values

Fish Tissue – First round = background Nothing above federal and state guidelines

Surface water sampling started February 3 rd Surface water sampling started February 3 rd Daily through mid- March Daily through mid- March Weekly mid-March to May Weekly mid-March to May Twice/month June-July Twice/month June-July Monthly beginning August Monthly beginning August

NC NC – 3 Stations – Hwy 14, VA Line & Milton – Monthly surface water, yearly fish tissue, yearly benthos Duke Duke – Continuing monitoring – Natural Resources Damage Assessment and Restoration Agreement

Unauthorized Surface Water Discharges Types of Unauthorized Discharges Engineered e.g. dam toe drains Unengineered seeps and weeps

How is permitting of seep determined The flow and pollutant concentration of the unpermitted discharge is compared with the dilution flow of the stream it flows int0 if there is no reasonable potential to violate water quality standards the discharge is given monitoring only, no limits in the permit. Examples of drought flow in River at various coal power plant sites Buck 1030 cubic feet second 554 MGD Asheville 306 cfs or 165 million gallons per day Mayo, Roxboro discharge into Reservoir no dilution must meet standard at end of pipe

How is permitting of seep determined As seeps flow change in flow appear and disappear NC has taken the approach of aggregating the seeps together and estimating total flow plus additional factor this will mean that unless significant changes occur major modification of permit not necessary Seeps combined outfall Monthly monitoring for 18 different parameters in draft permit

Current Situation We have received applications to modify or renew permits for all 14 affected coal fired plants We have tentatively agreed on a process for permitting potential dewatering discharges as flows are diverted from ash ponds 1 st round of three draft NPDES permits are Went to Public notice and Hearing is April 8

Has the Coal Ash Challenge changed How DWR interacts with Regulated Industries? Largest fine in NC DWR History $25.1 Million for groundwater contamination at Sutton plant Every single piece of paper back and forth between the company is up on the internet Press releases issued for almost every interaction Often picked up by AP or other news service

Has the Coal Ash Challenge changed How DWR interacts with Regulated Industries? Multiple court actions filed Federal and State Thousands of public comments received on original settlement Unprecedented level of Third party interaction (SELC and Riverkeepers et al)

Has the Coal Ash Challenge changed How DWR interacts with Regulated Industries? Intense involvement by EPA Region IV on every aspect of every action we take Increase in Frequency of monitoring and number of parameters sampled Every word and every sampling result in the history of the each facilitates’ file scrutinized

Litigation Trend in NC What if DWR doesn't’t take a formal enforcement action 1st Lawsuit American Canoe Assoc vs. City of Greensboro 1998 mostly failure to monitor violations DWR received four Notices of Intent to sue under CWA from SELC just last year. EPA ECHO website of all compliance date and Internet make it much easier for public to be aware of violations. Increased interest in permit issuance under Article 150 B of state statutes DWR developing new enforcement tools

Has the Coal Ash Challenge changed How DWR interacts with Regulated Industries? Yes and No No, We are still the courtesy professional regulators we were on Feb 1, 2014 Yes, the world has changed communication occurs in a flash where traditional and social media look for the next big thing (e.g. In the picture is the dress white and gold or blue and black) Yes, Once the focus has started on an issue even the smallest detail receives laser focus

Has the Coal Ash Challenge changed How DWR interacts with Regulated Industries? Yes Citizens are more educated and involved a few minutes on Google ® and anyone can become an “expert” on a pollutant or an industrial sector or a permitting process We both the regulators and industry need to continue to strive to make sure that ALL documentation is accurate We have to continue to work together to maintain and build public trust that we are protecting the environment

Has the Coal Ash Challenge changed How DWR interacts with Regulated Industries? Our responsibility is to continue to issue permits, conduct inspection and take proper compliance and enforcement actions when necessary Industry’s responsibility is to consistently audit their processes, analyze risk and maintain pollution control systems to avoid being the next big environmental issue.

Question/Answer