Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,

Slides:



Advertisements
Similar presentations
Restore Lawyer Creek Habitat: Targeting Steelhead and Chinook Salmon.
Advertisements

Implement Actions to Reduce Water Temperatures in the Teanaway Basin BPA FY 2002 Columbia Plateau Province Proposal Project ID #
Lawyer Creek Steelhead Trout Habitat Improvement Project presented by: Lewis Soil Conservation District.
Upper Toppenish Watershed Restoration Project ( ) Yakama Nation Division of Natural Resources.
US Army Corps of Engineers BUILDING STRONG ® Restoration and Regulation Discussion Joseph P. DaVia US Army Corps of Engineers-Baltimore Chief, Maryland.
Agua Hedionda Watershed Management Plan Copyright © 2005 Kenneth & Gabrielle Adelman. All rights reserved.
Shoreline Master Program Update Shoreline Master Program Update: Process Overview City of Benton City August 30,
Riparian Zone Habitat Assessment Vegetation and More.
Shingle Creek and West Mississippi Watershed Management Commissions Third Generation Watershed Management Plan.
Wetland Habitats: EMWMF Haul Road Remediation In 2005 a large haul road was constructed that resulted in loss of wetlands. To compensate for those losses,
Stream Geomorphology Leslie A. Morrissey UVM July 25, 2012.
North Carolina Ecosystem Enhancement Program (NCEEP) Project Implementation.
Living on the Edge Lake and River-Friendly Management for Waterfront Residents Elizabeth Riggs, Watershed Planner Huron River Watershed Council.
Proposed Stormwater Regulations Public Forum Richland County Government September 2009.
Project Collaboration In 1999, as a result of several years of monitoring of neotropical migratory birds such as the willow flycatcher, Jim Steele from.
Phase 3 interim report August  Local non-profit source water protection agency  Implementing “Getting to the Source”, with 82 recommendations.
Indiana 6217 Coastal Nonpoint Source Pollution Control Program – What it is, and What it Means!
Federal Realty Investment Trust (FRIT) Eastgate Shopping Center Chapel Hill, NC September 9, 2008.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Mitigation Categories 3 and 4 February 15,  Reminders:  Mitigation Category 3  WWH – GHQW  CWH – Inland Trout Streams  Class III PHWH  Mitigation.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Breewood Stream Restoration Montgomery County Capital Improvement Project to Stabilize the Breewood Tributary November 14, 2012 Sligo Middle School.
Greg Jennings, PhD, PE Professor, Biological & Agricultural Engineering North Carolina State University BAE 579: Stream Restoration Lesson.
Ecology and environment, inc. International Specialists in the Environment The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Analysis.
Urban Stream Restoration Case Studies: Challenges and Opportunities Alabama Water Resources Conference September 6-7, 2012 Greg Jennings, Darrell Westmoreland,
Morgan and Little Creeks Local Watershed Plan Totten Center, NC Botanical Garden 3 November 2004 Chapel Hill, NC
Golf Course Water Resources Best Management Practices TOOLBOX  Project Overview  Your Role in the Project April 2009.
Modern Urbanized Stream Water Quality Improvement Technologies Creating a Net Zero Water Quality Impact Solution in the Natural Environment.
US Army Corps of Engineers BUILDING STRONG ® 2012 Changes to Stream Mitigation Procedures and Guidelines Mike Moxey USACE, Mobile District IRT Chair May.
IMPACTS OF LAND DEVELOPMENT ON OREGON’S WATERS 2001 This slide show was borrowed from the internet but we added our own research when we presented it.
Impacts of Land Development on Oregon’s Waters 2001.
Tar-Pamlico Watershed Assessment. Proposed Water Quality Improvement Projects Improvement project types Model scenarios Targeted projects Stakeholder.
Project Activity: Riparian Zone Restoration Scott Compton, Watershed Program Manager Valles Caldera National Preserve.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
SFS Best Practices Presentation Key “Best Practice” Drivers for the Crop Sector 1.Reduce Nutrient, Sediment and Herbicide Runoff 1.Riparian buffer strips,
Greg Jennings, PhD, PE Professor, Biological & Agricultural Engineering North Carolina State University BAE 579: Stream Restoration Lesson.
I-90 Snoqualmie Pass East Project Tanya Lamb Urban Geography, GEOG 481 Description 15-mile stretch Hyak (MP 55.1) to Easton (MP 70.3) 2010 scheduled to.
How do humans affect watersheds and the hydrologic cycle ?
Teaching where science and policy intersect by developing a river restoration plan on a local stream Gabrielle David Department of Earth and Environmental.
Mission, Brender, and Yaksum Creeks Habitat Conditions Low flows and associated high temperatures affect distribution and abundance of native species.
Understanding Creeks, Rivers, and Riparian Areas.
Becky Houdek - Assistant Planner Minnehaha Creek Watershed District Minnehaha Creek Reach 14 Feasibility Study Insert photo.
Importance of the Lower Wenatchee River in Salmon Recovery* The Lower Wenatchee is a critical migration corridor for all ESA listed species Of the total.
Design Kickoff Meeting Becky Houdek, MCWD
Coos Watershed Association Watershed Restoration Projects.
Regenerative Stormwater Conveyence: An Integrated Approach to Sustainable Stormwater Planning on Linear Projects 2009 IOCET Adapting to Change Presented.
Lake Raleigh Wetland Creation Feasibility Study NC State Centennial Campus Melanie Carter, Jennifer Burdette, Amanda Jones.
Urban Watershed Restoration: Putting Plans Into Action Tanis Douglas Bowker Creek Initiative Coordinator Capital Regional District, Victoria BC.
Laguna Canyon Creek Protection and Restoration. Major Watercourse Laguna Canyon Creek is a major watercourse. The City identifies it as that and treats.
Nason Creek Salmon Habitat Conditions* Development, and road building have affected riparian (streamside) habitat, large woody debris and gravel recruitment.
University of Kentucky College of Agriculture Landscape Architecture Franklin-Simpson County Riparian Land Management Riparian Opportunities in Simpson.
Natural Riparian Resources Water Landscape & SoilVegetation.
NHACC Annual Meeting 2014 New Approaches to Restoring NH’s Rivers Natural Channel Design and Dam Removal Peter J. Walker.
Natural Riparian Resources Vegetation Landscape/Soil Water.
Agricultural Soil and Water Conservation Stewardship
October 26, 2016 Amanda Gumbert Extension Water Quality Specialist
Little Rapids Habitat Restoration St
Hydrosphere Notes Part 9-Land Use.
Henrico County Stream Assessment / Watershed Management Program
Issaquah-Fall City Road
Jason Throneberry Aquatic Ecologist.
FEMA and Stream Restoration
Riparian Vegetation.
Common Stream Habitat Problems
Kristel Riddervold Environmental Sustainability Manager
Kastanis- Existing Conditions
Stream Management Implementation Program Schoharie Watershed Advisory Committee Meeting October 24th, 2018.
City of Austin Watershed Protection Department CIP Project design/implementation Thank you for the opportunity to show the committee what the Watershed.
Shaver Creek Permitting
Presentation transcript:

Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach, NC State Univ Dan Clinton, NC State Univ Mac Haupt, NC WRP Dave Mayes, City of Wilmington

Overview Goal: Improve the water quality, stability, ecological function, and aesthetics of streams flowing through the Pine Valley Country Club Location: Middle Branch of Hewletts Creek including approximately 3,300 feet of perennial stream channel Purpose of Presentation:  Describe proposed stream restoration project  Seek feedback on proposed stream restoration, vegetated buffer enhancement, and stormwater management

NC Wetlands Restoration Program Established in 1996 to restore wetlands, streams and riparian buffer areas for the purposes of improving:  Water Quality  Aquatic and Terrestrial Habitat  Floodwater Prevention  Pollution Prevention  Overall Watershed Function Through State resources the NCWRP can fund: design, permit acquisition, construction and long term management of the site.

Defining the Problem Watershed Issues:  Closed and impaired shellfish waters  Urban stormwater runoff  Nutrient inputs resulting in algal blooms  Sediment inputs  Growth and development  Channelized streams Land Based Physical Impacts:  Eroding stream channel = loss of golf course property and loss of aesthetic values

Existing Stream Conditions Unstable eroding streambanks Poor water quality Poor vegetation (exotic species)

Project Objectives & Benefits Stabilize streams on PVCC property Improve water quality in Hewletts Creek and downstream shellfish waters Improve natural stream & floodplain functions Improve stormwater management & provide additional water source for PVCC Establish native vegetation Improve stream crossings (culverts & bridges) Improve aesthetics of stream corridor

Stream Restoration Adjust stream conditions based on reference reaches such that natural stream functions are improved: Channel geometry modification Instream structures Bank stabilization Riparian vegetation

transports the water and sediment produced by its watershed maintains its dimension, pattern, and profile while neither degrading nor aggrading Rosgen, 1994 Stable Stream

Problems  Water quality  Habitat loss  Floodplain functions  Land degradation Causes  Channelization  Land use changes  Loss of buffer Unstable Streams

BKF Not Incised BHR = 1.0 ER > 2.2 Water Table Stable Stream

BKF BHR > 1.0 ER < 1.4 Incised Channel Water Table

Priority 2 Restoration New Stable Channel with Lower Floodplain Bankfull Bench BKF Incised Channel

Priority 2 Restoration Plan View Top of Bank New Excavated Channel & Floodplain Top of Bank Replace Old Channel Incised Channel

Pine Valley Golf Course Phase 1 Length = 1000 ft Construction Cost = $125,000 Completed May 2001

Proposed Schedule Spring 2003: Complete design & permit applications Summer 2003: Hire construction firm November 1, 2003: Begin construction January 2004: Complete construction February 2004: Plant streambanks & floodplain

What Can the Project Provide for PVCC? New stormwater pond can be used for irrigation New culvert replacements will provide vehicle crossings New footbridge replacements Cart path relocations Fill soil used to enhance driving range drainage Ornamental plants (large trees & shrubs)

City of Wilmington Perspectives If NCWRP constructs this project:  Technique – stream restoration for mitigation credits  Schedule – now  Cost – paid by State (8,000,000 population) If City constructs this project:  Technique – stream restoration or other environmentally friendly method  Schedule – Council approval of Capital Improvement Budget; $70+ M of identified needs; $500,000/yr of new projects  Cost – paid by City (92,000 population) If PVCC constructs this project:  Technique – your choice as long it is permittable  Schedule – based on priorities of the Country Club  Cost – paid by members of the club (400 members - $1500/member)