Raine Cotton  Registered DG settlement is in accordance with Protocol Section 6.6.3.2 as Real-Time Energy Imbalance at a Load.

Slides:



Advertisements
Similar presentations
GEORGIA POWERS SMALL POWER PRODUCERS FUNDAMENTALS.
Advertisements

TNT Commercial Operations Working Meeting Betty Day, Kenneth Ragsdale, BJ Flowers April 6&7, 2004.
Distributed Generation (DG)
Demand Response in Connecticut Presented by: Bob Laurita ISO New England December 2, 2004.
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Ramping and CMSC (Congestion Management Settlement Credit) payments.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
ERCOT Billing, Settlement Disputes & Data Extracts
October 28, 2014 Update to RMS 1. * Reviewed and Discussed: * ERCOT Protocols and Retail Market Guide Requirements * TDSPs’ Data Processes for IDR vs.
Nodal Pricing in an LMP Energy Market
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
ERS Update for DSWG June 1, Agenda June – September 2012 Procurement XML Project Update Clearing Price discussion NPRR 451 Q & A.
COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) April 2015 Update to COPS.
Current DG Framework for Competitive Areas of ERCOT DREAM TF September 28, 2015.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Distributed Generation Registration Threshold Protocols Section 16.5 (5) ERCOT Staff DER Workshop June 18, ERCOT Public.
Distributed Energy Resources Concept Document Discussion ERCOT Staff DREAM Task Force Aug. 25,
Distributed Generation Task Force November 29, 2007 TAC Report.
Lead from the front Texas Nodal 1 Private Use Networks SIG Paper Review TPTF Meeting (version :15)
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
PRR 547 – Trading Hubs CMWG Presentation to WMS October 21, 2004.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
PRS Response to Steel Companies’ Appeal of NPRR’s 351 and 378 Tom Payton on behalf of PRS August 4, 2011 Disclaimer: This response attempts to capture.
GENERATION PROTOCOL AND SETTLEMENT TODAY COMET WG / RMS Workshop Electric Reliability Council of Texas May 2, 2007.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
1 UFE Workshop Sponsored by COPS October 19, 2004.
DREAM November Meeting. Agenda Introduction and Expectations Path to becoming a Resource Node – ERCOT Registration process for non-modeled resources –
SPP Presentation Stakeholder Meeting April 16, 2008 Austin, Texas UPDATE: Retail Open Access for ETI within SPP.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
1 SMD and Efficiency Programs Standard Market Design (SMD) –Implemented March, 2003 –Major feature, locational assignment of costs and locational price.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
GTBD Forecasting Using SCED to Produce Projections of Future LMPs Floyd J. Trefny February 17, 2011.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
1 Presentation MIT November 14, 2011 Metering Issues Taskforce (MIT) Elimination of Time Error Correction Potential Impact on Wholesale Settlements.
2003 State of the Market Report ERCOT Wholesale Electricity Markets.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Distributed Generation Registration June 30, 2008.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
Wholesale Electricity Spot Market (WESM)
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
October 13, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements Task.
Overview of Market Reforms and the WESM
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
1 Nodal Stabilization Market Call December 27, 2010.
COPS DECEMBER 2013 UPDATE TO RMS 12/18/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Third Party DR Self-Deployment Loads in SCEDv2 Subgroup Sept. 18, 2015.
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Interconnecting Wind & Solar Energy in Texas
Principal Load Profiling and Modeling
Distributed Generation Task Force
John Dumas Director, Wholesale Market Operations
Reflecting Losses in DR within ERCOT August 22, 2012
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
The New Texas Wholesale/Retail Market
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Presentation transcript:

Raine Cotton

 Registered DG settlement is in accordance with Protocol Section as Real-Time Energy Imbalance at a Load Zone  Compensated at the Load Zone Settlement Point Price (SPP). ◦ Average of Real-Time LMPs at Electrical Buses in the Load Zone for which the DG is located  Less than 10MW and connected below 60KV

 Real-Time Energy Imbalance Payment or Charge at a Load Zone ◦ The payment or charge to each QSE for Energy Imbalance Service is calculated based on the Real- Time Settlement Point Price for the following amounts at a particular Load Zone Settlement Point: ◦ (h) The aggregated generation of its Non-Modeled Generators in the Load Zone.  The payment or charge to each QSE for Energy Imbalance Service at a Load Zone for a given 15-minute Settlement Interval…

 Minor Protocol modification would allow DG to participate in a more market based approach  Specifically, if DG were guided by a Market approach then DG may be able to play a larger role in relieving congestion

 Change DG’s compensation to the LMP that is the most logically connected existing LMP

 DG can provide generation much faster than larger Resources (construction and ramp)  Interconnection is typically far shorter and more straight forward ◦ Interconnection process is directly between the TDSP and generator with less involvement with ERCOT ◦ Compared with the cost to interconnect at Distribution Voltage, interconnection cost per MW at Transmission Voltage can be prohibitive for DG.

 Investments do not have to be as long term compared to typical “larger plants” because there is a fluid secondary market of smaller equipment  Project development time is shorter ◦ Permitting ◦ Land ◦ Funding  Could provide bridge to more permanent and/or larger installation

5.2 MW

*This example would exceed 10MW threshold

West Texas Oil and Gas growth causes congestion

We ship Gas behind the congestion to Power Plants

And then struggle to get power back

There is only so much generation that distribution lines can accommodate; however, just because a node is congestion it does not mean that there is only one downstream distribution line for DG

Example: Congested Node

Nodes having “congestion” pricing signals because of upstream congestion Congested Node

 While DG cannot solve all congestion issues it can play a role.  We have a market structure in place that is currently sending pricing signals so why not allow the market to help determine when DG is feasible?

 Current DG players may not want to change their pricing structure ◦ Allow changes going forward ◦ Make it an opt-in program  Increase of staff time “studying logical nodes” ◦ Set minimum size for program (i.e. >1MW) ◦ Charge fee to offset cost ◦ The reality is that the logical node will be evident without much effort

 What about REPs? ◦ Contract price based on applicable LMP ◦ If a generator is going to be exporting energy (not just net metering) is direct to QSE an option?  Startup and Ancillary Energy? If DG is being compensated for production at the LMP price should energy consumption be priced the same Blackbox (no import of energy)

 Having DG LMPs assigned to existing Nodes may help the modeling of DG  There is currently no incentive for a moderately sized DG to help relieve congestion even though it is often moderate and small loads that ultimately cause congestion  We are already settling at the Load Zone SPP so perhaps changing to a Logical LMP will not be a difficult Protocol tweak

 This idea will produce actual electrons flowing to a physical location that is in need of power as determined by the market ◦ Physical, not paper solution

Raine Cotton