Status of Modular Coil Design D. Williamson, 4/9/03 Prototype Winding Form - Interim model based on m50_e03 - PF/TF supports, poloidal break added - To.

Slides:



Advertisements
Similar presentations
C2 to C5 fit up review-R41 Review of MC Type C to C assembly clearances with C2 to C5 shell surface interface details 12/19/06 Rev 4.
Advertisements

NCSX Mod Coil C1 features requiring rework at PPPL.
Status of M50 Modular Coils Winding form models based on m50_256.z01 have been posted in Pro/INTRALINK Working on tee/clamps, wings, port openings, poloidal.
AB 11 22 33 44 55 66 77 88 99 10  20  19  18  17  16  15  14  13  12  11  21  22  23  24  25  26  27  28.
J.H. ChrzanowskiMod Coil R&D Update1 Modular Coil R&D Keystone Activities April 30, 2003 James H. Chrzanowski.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
Update on ARIES-CS Coil Structural Analysis X.R. Wang and A.R. Raffray ARIES Meeting PPPL, NJ October 4-5, 2006.
Single Category Classification Stage One Additive Weighted Prototype Model.
Progress in Configuration Development for Compact Stellarator Reactors Long-Poe Ku Princeton Plasma Physics Laboratory Aries Project Meeting, June 16-17,
Status of the Power Core Configuration Based on Modular Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Comparison of 2-FP and 3-FP CS Coil Geometry Configurations Contributors: T.K. Mau, Rene Raffray and The ARIES Team ARIES Meeting General Atomics, San.
Slide 1UCSB CMS Weekly Status MeetingCMS Tracker Rod Filters Sam Burke EE Rod Power Line Low-Pass Filter Study 3 August 2004 Sam Burke UCSB HEP Group.
Special Products Section 6.4. Find the product. (x + 2)(x + 2) (x + 3)(x + 3)
ITER In-Vessel Coils (IVC) Interim Design Review PDR Checklist Items C Neumeyer July 28, 2010 July 26-28, 20101ITER_D_3MAZCX.
MC Type-B fit up review1 Review of MC Type B assembly clearances reviewing A-to-B and B-to-C interfaces 3/1/07 Summary: Wing interfaces look okay between.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
ARIES AT Project Meeting - Princeton, NJ 18 Sept 00 1 ARIES-AT Toroidal Field (TF) and Poloidal Field (PF) Coils Tom Brown, Fred Dahlgren, Phil Heitzenroeder.
PATTERNS Ms. Loe bin/search/linfo.cgi?id=7547.
1 WBS 1 Design Analysis Status NCSX Analysis Meeting Dec 3, 2003.
Integers and Properties
Modular Coil Assembly Bolted Joint PDR 2/22/07. Objectives The review objectives include... Define the location of additional inboard bolts Finalize the.
Properties of Addition and Multiplication. Commutative Property In the sum you can add the numbers in any order. a+b = b+a In the product you can multiply.
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
May 19-20, 2004NCSX FDRLeonard Myatt 1 Linear Structural Analysis of the NCSX Modular Coil & Shell Leonard Myatt NCSX Final Design Review May 19-20, 2004.
Thermocouples Isolated Omega Type-E T/C as used on vessel, ~$30 ea In-house signal conditioning equipment Instrument one 3-coil set: Winding pack near.
Nonlinear Analyses of Modular Coils and Shell structure for Cooldown and Modular Coil EM Loads Part 2 – Results of Clamp Assembly, Wing Bags, Poloidal.
Results of Linear Stress Analyses for Modular Coils and Coil structure For 2T High Beta Currents at 0 Seconds and Initial Coil Shrinkage of in/in.
An Analysis of Shell Structure for Dead Load H.M. Fan PPPL September 16, 2005.
Adding SubtractingMultiplyingDividingMiscellaneous.
F. Dahlgren -SC Project Review of NCSX, April 8-10, 2008 PF, TF, & Trim Coil Supports (WBS-15) Core Base Support Structure (WBS-17) F. Dahlgren NCSX Coil.
Commutative and Associative Properties. Properties are rules in mathematics. You can use math properties to simplify algebraic expressions!
1 NCSX WBS HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.
1 MC Assembly over the VV FPA Station 3 FDR Review July 13, 2007 T. Brown.
Twisted Racetrack Analysis Update
NCSX M. Cole, P. Fogarty, K. Freudenberg, T. Hargrove, G. Jones, G. Lovett, B. Nelson, D. Williamson April 27, 2005 Modular Coil Type-C Final Design Review.
The Distributive Property
SC Project Review of NCSX, April 8-10, 2008 NCSX Field Period Assembly Mike Viola NCSX Field Period Assembly Manager NCSX Project Review April 8-10, 2008.
Determine the sequence of genes along a chromosome based on the following recombination frequencies A-C 20% A-D 10% B-C 15% B-D 5%
Modular Coil Metrology Data for Current Center Shift Calculation.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
1 Assembly Tooling PU Workshop on NCSX Cost & Schedule Princeton Plasma Physics Laboratory Princeton, NJ Mar 1-4, 2007 T. Brown Princeton Plasma Physics.
Editorial Wrap Up for Release The editorial task Adding LPF data (with atomic coordinates) Assigning Calculated pattern QM New and updated ICSD.
1.3 Segments and Measure The segment postulate Distance Formula.
Nonlinear Analyses of Modular Coils and Shell structure for Coil Cool-down and EM Loads Part 1 – Results of Shell Structure and Modular Coils H.M. Fan.
FEM Analysis of the Stage3 Support Frame H.M. Fan March 14, 2007.
The Design: Totally bolted, electrically isolated 6 top and 6 bottom inboard flange holes, with tapped holes in one flange and a thru holes in mating flange.
NCSX 21 March 2003 Reiersen - 1 PDR Preparations Wayne Reiersen NCSX Engineering Meeting 21 March 2003.
MATHEMATICS Algebraic Manipulation – Collecting like terms.
Twisted Racetrack Revisited Model Changes: Side A has 10 turns Clamps have been modified to as built geometry. Property Changes (linear results.
Data for Target Setting and Monitoring Course: Using CEM data in Practice Day 2 Session 3 Wed 30 th May 2012 Peter Hendry: CEM Consultant
A. Sim, CRD, L B N L 1 SRM Collaboration Meeting, Sep , 2005 SRM v3.0 LBNL Implementation Status Report Scientific Data Management Research Group.
NCSX VVSA / MCWF FDR A Systems Engineering Perspective Wayne Reiersen Bob Simmons NCSX VVSA / MCWF FDR May 19-20, 2004 PPPL.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
Stellarator Core Machine Configuration NCSX Project Meeting Dec 19-20, 2000 B. Nelson, M. Cole, P. Fogarty P. Goranson, G. Jones, D. Williamson O AK R.
1 MC B3 Inspection MTM data: dated 12/22/06 1/6/07 Pro/E model: b3_mtm_data_check.asm T. Brown / D. Williamson.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
PPPL Stellarator Program Overview Hutch Neilson NCSX Project Manager NCSX Program Advisory Committee Meeting #6 Princeton, NJ December 9, 2002.
1 NCSX radial build NCSX Project Meeting December 18, Modular coil build assumptions 2.Vessel build assumptions 3.FW/internal build assumptions.
南亚和印度.
Updates of the ARIES-CS Power Core Configuration and Maintenance
Warm up 1.) (3, 2, -4), (-1, 0, -7) Find the vector in standard position and find the magnitude of the vector.
تصنيف التفاعلات الكيميائية
Изразеното в настоящата презентация мнение обвързва единствено автора и не представлява официално становище на Комисията за финансов надзор Данил Джоргов.
Adding with 9’s.
Adding with 10’s.
Adding ____ + 10.
Practice makes perfect!
BETONLINEBETONLINE A·+A·+
Stellarator Program Update: Status of NCSX & QPS
Presentation transcript:

Status of Modular Coil Design D. Williamson, 4/9/03 Prototype Winding Form - Interim model based on m50_e03 - PF/TF supports, poloidal break added - To be superseded by Production Type-C Production Coils and Forms - WC, XV updated to m50_256.z01 - Tweak of shell surface, coil twist in progress - Pattern of clamps being optimized for space - Additional features are being added - Type-C model will become prototype

View at V=0 (NB Port)

Inboard View at V=0 (NB Port) AAB C

Inboard View at V=1/2 (FP Joint) CCBAB

Interface A-A

Interface A-B

Interface B-C

PDR Tasks