Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP 8.5.3 group Gif++ User Meeting 11/07/2014 Outline Status.

Slides:



Advertisements
Similar presentations
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Advertisements

DCS workshop 13-14/6/2005G. De Cataldo, CERN-CH and INFN bari1 Common FSM’s updates An exercise to design the standard FSMs for the DCS, the HV and the.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
L. Granado Cardoso, F. Varela, N. Neufeld, C. Gaspar, C. Haen, CERN, Geneva, Switzerland D. Galli, INFN, Bologna, Italy ICALEPCS, October 2011.
Clara Gaspar, November 2012 Experiment Control System LS1 Plans…
System Integration Tool Basic Introduction. „System Integration Tool “2Content I.Nomenclature I.Nomenclature II.Introduction II.Introduction III.Implementation.
CERN - IT Department CH-1211 Genève 23 Switzerland t The High Performance Archiver for the LHC Experiments Manuel Gonzalez Berges CERN, Geneva.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
BOE/BME – MDT: DCS For the 2 BOE, DCS needs to handle 2 x 2 HV (1 ch/multilayer) 2x LV 2x JTAG, associated 2 MDMs/ELMBs Monitoring of T, B and CSM sensors.
Scaling Up PVSS Phase II. 2 Purpose of this talk Start a discussion about the next phase of the Scaling Up PVSS Project. Start a discussion about the.
MDT PS DCS for ATLAS Eleni Mountricha
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
ATLAS MDT Power Supply DCS Anastasios Iliopoulos 15/08/2006.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
ALICE DCS Meeting.- 05/02/2007 De Cataldo, Franco - INFN Bari - 1 ALICE dcsUI Version 3.0 -dcsUI v3.0 is ready and will be soon posted on the ACC site.
1 Responsibilities & Planning DCS WS L.Jirdén.
TPC Prototype III TPC module anode HV edge LV module analog digital Cool sensor Gas sensor Shift Expert DCS Ch Skirt.
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
Status of Farm Monitor and Control CERN, February 24, 2005 Gianluca Peco, INFN Bologna.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Controls EN-ICE FSM for dummies (…w/ all my respects) 15 th Jan 09.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
XXVI workshop on resent developments in High Energy Physics and Cosmology Ancient Olympia,16-19 April 2008 Tsarouchas Charilaos NTUA Detector Control System.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
Alarm Handling Oliver Holme 7 th November Guidelines & Strategies All provide recommendation to use Framework Classes Standard severities/behaviour/colours.
Preparation of chamber training g. passaleva. Gaps to be trained We have O (100) gaps that have tripped at least once since June At a quick glance they.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
ONCS Subsystem Status Chris Witzig (BNL), Stephen Pate (NMSU) DC Meeting PHENIX Collaboration Week 22-June-1998 Chain Test Software Subsystem Support Tests.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
DCS Meeting - 17/6/2002 G. De Cataldo, A.Franco - INFN Bari - 1 The implementation of the HMPID DCS in the PVSS-JCOP Framework The Liquid Circulation and.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
PVSS an industrial tool for slow control
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Institute of Nuclear Physics Polish Academy of Sciences
ATLAS MDT HV – LV Detector Control System (DCS)
ProtoDUNE SP DAQ assumptions, interfaces & constraints
Cosmic Ray Tracker and Detector Control System at the GIF++
RPC HV&LV status Introduction HV power supply tender
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System: towards the final system
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status and latest developments Next Steps Gif++ CERN July 11th 2014A. Polini, M. Romano1

Hardware Status (July 2014) Material installed –1 CAEN mainframe (SY PS A-1531 A-1532) –1 (non EASY) HV board A-1526P (6ch 15 kV+) –1 Branch Controller A-1676 –2 PC (courtesy of ATLAS DCS, spare of past generation) DELL PowerEdge 1950 Also installed ( on loan from ATLAS Muons) –EASY 3000 Crate –1 ADC A-3801 (128ch) Recently added: (from CMS Muons group) –1 CAEN mainframe (SY-1527) –1 (non EASY) HV board A-1526N (6ch 15 kV+) B. 190 GIF Gif++ CERN July 11th 2014A. Polini, M. Romano2

Test Location in B190 (old GIF) (i) 2 CAEN Mainframes + 2 HV A3516 (P & N) boards, 6ch each, 12 KV 1 branch controller A EASY crate + 1 ADC A3801 (128 ch) + 2 patch-panels (4x32 pair connectors  16x8 pairs) All up and working  System being developed/used in conjunction with existing GIF CMS GIF Setup HV + HV - New from CMS Muon 128 ch ADC ENV+ Det monitoring Gif++ CERN July 11th 2014A. Polini, M. Romano3

Test Location in B190 (old GIF) (ii) 2 computers (Dell PE-1950) installed in CMF (NSC ATLAS_GIF_DCS) Hostnames: pcgifdcs01, pcgifdcs02 Windows 2008 Server R.2 PVSS 3.8 and WinCC-OA 3.11 More computers to come in September (when ATLAS DCS PCs are refurbished) Gif++ CERN July 11th 2014A. Polini, M. Romano4

Overall Status and Latest Developments First steps in order to define protocols and intercommunication with GCS (Gilles/Roberto) First steps to define and allocate servive for Central Oracle data archiving (M. Gonzales, Martin J.) Common effort (NTUA), project for common developments within RD51 and AIDA. Expressed interest in GIF++ use and development from CMS Muon group. First meeting started. Dedicated DCS WinCC software being developed. New DCS Software developer/contact Marino Romano (Aida+INFN Bologna). Gif++ CERN July 11th 2014A. Polini, M. Romano5

Software Status (i) Collecting user requests and building up template for the GIF++ project. Running WinCC project on pcgifdcs02 OPC connection to the two CAEN Mainframes Possibility of Monitoring/Setting HV/ADC boards. User Interface and tools being developed using RD51 DCS project as skeleton Added FSM based features Made some tweak to RD51 panels –Removed the dependencies to the old naming conventions Gif++ CERN July 11th 2014A. Polini, M. Romano6

Software Status (ii) Using RD51 DCS project as skeleton Added FSM basic features Made some tweak to RD51 panels –Removed the dependencies to the old naming conventions Group handling, settings and build FSM buttons should be used only by experts –Been working mainly on “Group handling” –More software details in backup slides (work in progress) Gif++ CERN July 11th 2014A. Polini, M. Romano7

Plans and Outlook Status: System in Building 190 getting close to be ready for preliminary operation Collaboration with RD-51, NTUA, CMS group established. Options for synergies (existing GIF tests) Software development ongoing: basic functionalities to control the HW already available. System can be used to test parts of the final system (ENV sensors etc). Next Steps: Proceed in the development, define the operation constraints, communication protocols and specifications following users’ requests Schedule: The whole system can be moved anytime to the final location following the GIF++ detector and infrastructure schedule Gif++ CERN July 11th 2014A. Polini, M. Romano8

Backup Gif++ CERN July 11th 2014A. Polini, M. Romano9

selection.pnl (accessed via “Group Handling”) Current status: Now an HV channel can be assigned to multiple groups (the list of “parent” groups is saved in an user defined DPE in the fwCaenChannel DPT) It’s possible to remove a channel from the selected channels by right-clicking on it Added filter masks (device type, locations, dp name and alias) Made the panel smart enough to be able to assign both HV and ADC channels to the various groups Long-term TODO: Revamp the authentication protocol Gif++ CERN July 11th 2014A. Polini, M. Romano10

generateFSM2.pnl (accessed via “Build FSM”) Still not working as intended –Generate FSM button: creates an FSM (named as the string in the “FSM name” field) Loops over all groups Creates a LU for each not-empty group Create a DU for each HV in the group –Remove FSM button: deletes the FSM named as the string in the “FSM name” field –Open node button: opens the FSM UI for the selected FSM (just like the Open FSM button in the main panel) Gif++ CERN July 11th 2014A. Polini, M. Romano11

FSM UI (work in progress) Gif++ CERN July 11th 2014A. Polini, M. Romano12

FSM UI Very basic setup: The top node contains 4 logical units (1 for each not empty group) of type HVOperation Each HVOperation node contains the DUs (HV channels) assigned to the corresponding group Each HV channel can be operated both individually or in bulk (configure, switch on/off, recover, etc.) The table on the right shows the current monitored values as well as the settings. Trends (with history, once we have a DB) can be displayed by right clicking on the cells Intermediate layers are expected to be inserted between the Top node of the group and the HVOperation nodes. Something like Top Node  Group X  HV Operation  Enviromnent  etc… Gif++ CERN July 11th 2014A. Polini, M. Romano13