EGEE-II INFSO-RI-031688 Enabling Grids for E-sciencE www.eu-egee.org EGEE and gLite are registered trademarks Network in EGEE Building end-to-end network.

Slides:



Advertisements
Similar presentations
Connect. Communicate. Collaborate NTUA/GRNET Interdomain SLAs Enforcement Framework in Real QoS-Enabled Networks C. Marinos, A. Polyrakis, V. Pouli, M.
Advertisements

Dave Jent, PI Luke Fowler, Co-PI Ron Johnson, Co-PI
The LHC Computing Grid – February 2008 The Worldwide LHC Computing Grid Dr Ian Bird LCG Project Leader 15 th April 2009 Visit of Spanish Royal Academy.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks R. Brunetti INFN-Torino The Italian Regional.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Network trouble ticket standardisation -
Connect. Communicate. Collaborate The Technological Landscape of GÉANT2 Roberto Sabatino, DANTE
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE II - Network Service Level Agreement (SLA) Establishment EGEE’07 Mary Grammatikou.
Frédéric Hemmer, CERN, IT DepartmentThe LHC Computing Grid – October 2006 LHC Computing and Grids Frédéric Hemmer IT Deputy Department Head October 10,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Romanian SA1 report Alexandru Stanciu ICI.
INFSO-RI Enabling Grids for E-sciencE Federated Network Performance Monitoring for the Grid K. Kavoussanakis, EPCC, The University.
INFSO-RI Enabling Grids for E-sciencE SA2 and JRA4: Network Services K. Kavoussanakis, EPCC, The University of Edinburgh J-P. Gautier,
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
GGF12 – 20 Sept LCG Incident Response Ian Neilson LCG Security Officer Grid Deployment Group CERN.
Enabling Grids for E-sciencE ENEA and the EGEE project gLite and interoperability Andrea Santoro, Carlo Sciò Enea Frascati, 22 November.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The network monitoring in grid context Operations.
INFSO-RI Enabling Grids for E-sciencE GRID sites connectivity database design Anthony Teslyuk, RRC KI JRA4, SA2 Meeting 4 th EGEE.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE – paving the way for a sustainable infrastructure.
INFSO-RI Enabling Grids for E-sciencE Plan until the end of the project and beyond, sustainability plans Dieter Kranzlmüller Deputy.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Next steps with EGEE EGEE training community.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Next steps with EGEE Gergely Sipos
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Multi-level monitoring - an overview James.
INFSO-RI Enabling Grids for E-sciencE Service Provision Architecture TNLC Meeting ― Athens, Mathieu Goutelle (SA2, CNRS.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks IPv6 test methodology Mathieu Goutelle (CNRS.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA1: Grid Operations Maite Barroso (CERN)
EGEE-III-INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-III All Activity Meeting Brussels,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The EGEE User Support Infrastructure Torsten.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-III Network activity overall Xavier.
EGEE is a project funded by the European Union under contract IST Network Resources Provision Jean-Paul Gautier SA2 manager Cork meeting,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE Support for New and Existing Users Gergely.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGI Operations Tiziana Ferrari EGEE User.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Going from EGEE-NA ES cluster to EGI SSC.
EUROPEAN UNION Polish Infrastructure for Supporting Computational Science in the European Research Space Operational Architecture of PL-Grid project M.Radecki,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Vassiliki Pouli
Enabling Grids for E-sciencE EGEE-II Meeting EGEE-II SA2 activity Tziouvaras Chrysostomos, MSc NTUA, 14 th March 2006.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Update on Network Performance Monitoring.
EGEE-II INFSO-RI Enabling Grids for E-sciencE End-to-End Service Level Agreement Provisioning and Monitoring for End-to-End QoS.
INFSO-RI Enabling Grids for E-sciencE NRENs & Grids Workshop Relations between EGEE & NRENs Mathieu Goutelle (CNRS UREC) EGEE-SA2.
INFSO-RI Enabling Grids for E-sciencE The EGEE Project Owen Appleton EGEE Dissemination Officer CERN, Switzerland Danish Grid Forum.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Deliverable DSA1.4 Jules Wolfrat ARM-9 –
INFSO-RI Enabling Grids for E-sciencE Institution of SLAs TNLC Meeting ― Athens, Afrodite Sevasti (SA2, GRNET)
SA2 : Network Resource Provision All Activity Meeting – 17 March SA2 Execution Plan for the first year Jean-Paul Gautier SA2 Manager CNRS/UREC.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks UK-Ireland-France Regional Participation.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operations Automation Team Kickoff Meeting.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
INFSO-RI Enabling Grids for E-sciencE SA2 and JRA4: Network Services K. Kavoussanakis J-P. Gautier.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA1 & SA2-ENOC Interactions status and plans.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN Operations WS: Introduction & Objectives.
EGEE is a project funded by the European Union under contract IST JRA4 Overview Javier Orellana JRA4 Coordinator EGEE Kick Off Meeting SA2.
All Activities Meeting – 13/14 Jan SA2 Execution Plan for the first year Franck Bonnassieux CNRS/UREC EGEE is proposed as a project funded by.
INFSO-RI Enabling Grids for E-sciencE NPM Security Alistair K Phipps (NeSC) JRA4 Face To Face, CERN, Geneva.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN Operational model: Roles and functions.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks What all NGIs need to do: Helpdesk / User.
INFSO-RI Enabling Grids for E-sciencE Network Services Development Network Resource Provision 3 rd EGEE Conference, Athens, 20 th.
LHCOPN operational model Guillaume Cessieux (CNRS/FR-CCIN2P3, EGEE SA2) On behalf of the LHCOPN Ops WG GDB CERN – November 12 th, 2008.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Grid is a Bazaar of Resource Providers and.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ROC model assessment AP ROC ShuTing Liao.
INFSO-RI Enabling Grids for E-sciencE EGEE general project update Fotis Karayannis EGEE South East Europe Project Management Board.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks CYFRONET site report Marcin Radecki CYFRONET.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operations automation team presentazione.
Javier Orellana EGEE-JRA4 Coordinator CERN March 2004 EGEE is proposed as a project funded by the European Union under contract IST Network.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Introduction to Grids and the EGEE project.
Connect. Communicate. Collaborate Place your organisation logo in this area End-to-End Coordination Unit Marian Garcia, Operations Manager, DANTE LHC Meeting,
Enabling Grids for E-sciencE Agreement-based Workload and Resource Management Tiziana Ferrari, Elisabetta Ronchieri Mar 30-31, 2006.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Trouble Ticket exchange standardization Mathieu.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operating an Optical Private Network: the.
INFSO-RI Enabling Grids for E-sciencE TNC 2005 Networking activities in EGEE Mathieu Goutelle (CNRS UREC, France) EGEE-SA2 activity.
Bob Jones EGEE Technical Director
Ian Bird GDB Meeting CERN 9 September 2003
SLR, SLS and SLA issues Afrodite Sevasti SA2 participant
Networking support (SA2) tasks for EGI
Presentation transcript:

EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Network in EGEE Building end-to-end network services for the Grid Mathieu Goutelle – CNRS UREC, France EGEE-II SA2 “Networking support”

Enabling Grids for E-sciencE EGEE-II INFSO-RI GridNets 2006 – – San Jose, CA, USA 2 Outline Short presentation of EGEE, The network in EGEE: –Network services? –EGEE focus on end-to-end services in a multi-domain context. Network services: –Resource reservation, –Service Level Agreement. Operational services: –Monitoring, –EGEE Network Operational Centre. Summary & conclusion

Enabling Grids for E-sciencE EGEE-II INFSO-RI GridNets 2006 – – San Jose, CA, USA 3 EGEE in a nutshell… EGEE: –1 April 2004 – 31 March 2006 –71 partners in 27 countries, federated in regional Grids EGEE-II: –1 April 2006 – 31 March 2008 –91 partners in 32 countries –13 Federations Objectives: –Large-scale, production-quality infrastructure for e-Science –Attracting new resources and users from industry as well as science –Improving and maintaining “gLite” Grid middleware

Enabling Grids for E-sciencE EGEE-II INFSO-RI GridNets 2006 – – San Jose, CA, USA 4 EGEE in a nutshell… More than 20 applications from 7 domains: –Astrophysics:  MAGIC, Planck –Computational Chemistry –Earth Sciences:  Earth Observation, Solid Earth Physics, Hydrology, Climate –Financial Simulation:  E-GRID –Fusion –Geophysics:  EGEODE –High Energy Physics:  4 LHC experiments (ALICE, ATLAS, CMS, LHCb)  BaBar, CDF, DØ, ZEUS –Life Sciences:  Bioinformatics (Drug Discovery, Xmipp_MLrefine, etc.)  Medical imaging (GATE, CDSS, gPTM3D, SiMRI 3D, etc.) –Multimedia –Material Sciences –…

Enabling Grids for E-sciencE EGEE-II INFSO-RI GridNets 2006 – – San Jose, CA, USA 5 EGEE Infrastructure Country participating in EGEE Scale (June 2006): ~ 200 sites in 40 countries ~ CPUs > 10 PB storage > jobs per day > 100 Virtual Organizations

Enabling Grids for E-sciencE EGEE-II INFSO-RI GridNets 2006 – – San Jose, CA, USA 6 Network infrastructure Connects 32 NRENs Over 3M users

Enabling Grids for E-sciencE EGEE-II INFSO-RI GridNets 2006 – – San Jose, CA, USA 7 Network infrastructure (cont.)

Enabling Grids for E-sciencE EGEE-II INFSO-RI GridNets 2006 – – San Jose, CA, USA 8 End-to-end network services? What type of services? –Network services are available to the EGEE sites:  Premium IP and similar (QBSS e.g.),  “lightpath” or network resource reservation,  IPv6, multicast… –Operational services are available to the EGEE sites:  Monitoring of the network (local & backbone),  Operational data (incident, maintenance). How to ensure the service continuity along the path? –In the last mile? –In a multi-domain context? What about service availability, interface standardization, inter-domain agreements, etc.

Enabling Grids for E-sciencE EGEE-II INFSO-RI GridNets 2006 – – San Jose, CA, USA 9 EGEE focus Network services: –Network resource reservation:  Bandwidth Allocation and Reservation (BAR),  Dedicated talk on that subject (see session 1, “End to End Bandwidth Allocation and Reservation for Grid applications”). –Service Level Agreement (SLAs):  End-to-end SLAs? Operational services: –Monitoring:  Network Performance Monitoring (NPM),  Dedicated talk on that subject (see session 2, “Federated Network Performance Monitoring for the Grid”). –Coordination of operational actions:  Concept of the EGEE Network Operational Centre (ENOC).

Enabling Grids for E-sciencE EGEE-II INFSO-RI GridNets 2006 – – San Jose, CA, USA 10 Network resource reservation Based on the framework currently being built by the GÉANT2 project: –Hides the multi-domain, multiple technologies issues; –Provides at the Grid level:  A seamless interface for service requests at the “customer” layer;  High-level view of the network, with request of characteristics and not of a particular service;  Reduced configuration lead-time;  A description of the service level. Issues remain: –A component (BAR, see dedicated talk) gives access to these interfaces at the middleware layer, but the application layer is not yet ready; –Need of sub-management of the macroscopic reserved resource at the Grid level; –What about domains outside the GÉANT2 cloud?

Enabling Grids for E-sciencE EGEE-II INFSO-RI GridNets 2006 – – San Jose, CA, USA 11 Quick look at the BAR architecture Clear demarcation between the Grid and the network: –The network is hidden from the Grid (technology, multi-domain issues…); –The Grid is hidden to the network (only knows one “EGEE” user); –Allows a two-stage process (reservation & activation) suitable in a Grid context;

Enabling Grids for E-sciencE EGEE-II INFSO-RI GridNets 2006 – – San Jose, CA, USA 12 SLAs “SLAs”? –Description of the characteristics of the service provided (e.g. after a successful resource reservation request); –Provided by each domain crossed by the data path; –Either manually filled in by a human or automatically if the request is all handled by software. –Definition of templates in cooperation with GÉANT2:  Based on previous work inside EGEE and answers from GÉANT2 to some open issues (procedures, demarcation point…) SLA template: –Administrative part (contact, duration, troubleshooting procedures); –SLS (Service Level Specification) part. The SLA is formed using the individual SLAs provided by all domains along the end-to-end path.

Enabling Grids for E-sciencE EGEE-II INFSO-RI GridNets 2006 – – San Jose, CA, USA 13 SLAs (cont.) EGEE end-to-end SLA template: –Concatenation of the individual SLAs in each participating domains; –SLA between the border of the NRENs cloud (border-to-border SLA); Difficulty to accommodate and take into account the “last mile”: –If the “last-mile” network is not participating (no resource reservation system, no SLA, etc.); –Try to address this with static information on these networks to provide service characteristics to the user/application. border-to-border connectivity end-to-end connectivity

Enabling Grids for E-sciencE EGEE-II INFSO-RI GridNets 2006 – – San Jose, CA, USA 14 SLA institution All domains involved in network services provisioning to EGEE as part of the existing network infrastructure hierarchy have to be categorized as one of: –Compliant with the Premium IP service, –Supportive of the Premium IP service, –Indifferent to the Premium IP service.

Enabling Grids for E-sciencE EGEE-II INFSO-RI GridNets 2006 – – San Jose, CA, USA 15 EGEE focus Network services: –Network resource reservation:  Bandwidth Allocation and Reservation (BAR),  Dedicated talk on that subject (see session 1, “End to End Bandwidth Allocation and Reservation for Grid applications”). –Service Level Agreement (SLAs):  End-to-end SLAs? Operational services: –Monitoring:  Network Performance Monitoring (NPM),  Dedicated talk on that subject (see session 2, “Federated Network Performance Monitoring for the Grid”). –Operational Interface with the network:  Concept of the EGEE Network Operational Centre (ENOC).

Enabling Grids for E-sciencE EGEE-II INFSO-RI GridNets 2006 – – San Jose, CA, USA 16 Monitoring Not Yet Another Monitoring Framework! –Role of a Mediator between the various monitoring frameworks and the various clients (diagnostic tools, middleware, etc.); –Network Performance Monitoring (NPM) gives access to data collected at existing monitoring frameworks (site, backbone); –Use of the NMWG interface to access those frameworks and republish data; –Special requirements for some middleware components for faster access to data.

Enabling Grids for E-sciencE EGEE-II INFSO-RI GridNets 2006 – – San Jose, CA, USA 17 Operational Interface The network infrastructure of EGEE is mainly served by a set of NRENs via GÉANT2; Need of an entity coordinating all the NOCs involved and the Grid Operations: –Concept of an end-to-end Coordination Unit (GÉANT2); –Providing an end-to-end operational support. A single point of contact as an operational interface between EGEE and GÉANT2/NRENs dealing with: –Network problems troubleshooting, –Interactions with network providers and Grid sites, –Notifications from NRENs, –Network SLA installation and monitoring. Two Functional Entities inside EGEE: –EGEE Network Operational Centre (ENOC); –A Network Trouble Ticket Manager – GGUS.

Enabling Grids for E-sciencE EGEE-II INFSO-RI GridNets 2006 – – San Jose, CA, USA 18 ENOC From the EGEE point of view: –GGUS acts as the first line support (interacts with the user); –Support units are the second level support; From the NRENs’ point of view: –EGEE (via the ENOC) is a single entity; –The ENOC is the only point of contact for the NRENs (submitter of the problem). GGUS Users Support Units ENOC NRENs GÉANT2 EGEENetwork

Enabling Grids for E-sciencE EGEE-II INFSO-RI GridNets 2006 – – San Jose, CA, USA 19 ENOC (cont.) Main challenges: –To create a network support structure inside EGEE; –To define the associated network operational procedures. The ENOC is the user support for network failures: –End-to-End network problems troubleshooting; –Coordination unit of the actions of all the entities involved in a network incident; –Try to have an overall view of the end-to-end service, gathering information from all the involved domains; –SLA Management: installation and monitoring. ENOC Operational Procedures have been defined and validated during the first phase of EGEE; EGEE-II will fully implement ENOC.

Enabling Grids for E-sciencE EGEE-II INFSO-RI GridNets 2006 – – San Jose, CA, USA 20 ENOC (cont.) ENOC Service: –Collect tickets from NRENs which agree to provide them to the ENOC; –Forward to GGUS the ones that seem relevant (possible impact on the Grid infrastructure); –Receive tickets assigned to ENOC by the GGUS 1 st level support; –Troubleshoot them with the help of monitoring tools; –Contact identified faulty domains or reassign ticket to the associated site if there is no evidence of a backbone problem (e.g. LAN issue). Main Issues: –Load on the ENOC team (amount of info, etc.); –Heterogeneity of systems the ENOC has to deal with (languages, trouble ticket format, monitoring, etc.).

Enabling Grids for E-sciencE EGEE-II INFSO-RI GridNets 2006 – – San Jose, CA, USA 21 ENOC status ENOC team is ready!  5 people (2 FTE) including one dedicated to it. ENOC receives operational information from GÉANT2 and 10 NRENs (more to come):  About 80% of all the EGEE sites covered;  An average of 5 tickets handled per day;  8 different languages. Building tools to follow up or enhance the network support:  Network Operational Database (interconnection of administrative domains between the EGEE resource centres);  TT parsing and filtering tool;  Dashboard to present overall status of the “EGEE network”.

Enabling Grids for E-sciencE EGEE-II INFSO-RI GridNets 2006 – – San Jose, CA, USA 22 EGEE expectations Towards a better solution against our “multi-domain” and “end-to-end” issues Seamless access to network monitoring data:  GÉANT2 will provide such access (PerfSonar), from multiple domains, aggregating data from multiple frameworks; Network resource reservation:  Requests expressed not in terms of service but of characteristics;  The choice of the underlying technology to fulfil them is up to the network;  Answer to a request = SLA (depending of the current network status & load);  What about the last mile? The non-NRENs domains? Standardization of the operational interface:  Trouble Ticket format (data schema and exchange format);  Access method.

Enabling Grids for E-sciencE EGEE-II INFSO-RI GridNets 2006 – – San Jose, CA, USA 23 Summary & conclusion Focus on providing end-to-end services in a multi- domain context: –Hiding the network complexity from the Grid (users, middleware, Grid support); –Hiding the Grid complexity from the network (single point of contact, operational interface); Many building blocks depend on the providers: –Resource reservation frameworks, SLA installation, backbone monitoring; –Fortunately, EGEE and GÉANT2 built up a strong collaboration! Many things remains pending: –Mainly on the operational side (homogenization of the network interface); –How to cope with domains outside the GÉANT2 cloud? The two infrastructures need to collaborate on these aspects.

Enabling Grids for E-sciencE EGEE-II INFSO-RI GridNets 2006 – – San Jose, CA, USA 24 Thank you for your attention!