Economic Analysis Concepts. 2 Is the project justified ?- Are benefits greater than costs? Which is the best investment if we have a set of mutually exclusive.

Slides:



Advertisements
Similar presentations
Lecture-1 Financial Decision Making and the Law of one Price
Advertisements

The Economics Of Road Investment
Economic Principles of PPP Valuation CAPITAL BUDGETING.
Net Present Value and Other Investment Rules Chapter 5 Copyright © 2010 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies,
9-0 Chapter 9: Outline Net Present Value The Payback Rule The Discounted Payback The Average Accounting Return The Internal Rate of Return The Profitability.
Key Concepts and Skills
TOPIC 3 Investment Appraisal.
Hawawini & VialletChapter 7© 2007 Thomson South-Western Chapter 7 ALTERNATIVES TO THE NET PRESENT VALUE RULE.
Chapter McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. 9 Net Present Value and Other Investment Criteria.
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. 9 Net Present Value and Other Investment Criteria.
Chapter McGraw-Hill Ryerson © 2013 McGraw-Hill Ryerson Limited 9 Prepared by Anne Inglis Net Present Value and Other Investment Criteria.
1 Capital budgeting Learning objectives Understand the concept of capital budgeting i.e. long term investments The nature and scope of investment decisions.
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. 9 Net Present Value and Other Investment Criteria.
Capital Budgeting Net Present Value Rule Payback Period Rule
Net Present Value and Other Investment Criteria
Net Present Value and Other Investment Criteria
0 Net Present Value and Other Investment Criteria.
P.V. VISWANATH FOR A FIRST COURSE IN FINANCE 1. 2 Decision Criteria NPV The Payback Rule Accounting Rate of Return IRR Mutually Exclusive Projects The.
Study Unit 10 Investment Decisions. SU – The Capital Budgeting Process Definition – Planning and controlling investment for long-term projects.
Chapter 9 INVESTMENT CRITERIA Pr. Zoubida SAMLAL GF 200.
Chapter 4. Economic Factors in Design The basis of design decisions will be economics. Designing a technically safe and sound system will be only part.
Engineering Economics in Canada Chapter 10 Public Sector Decision Making.
Economic Analysis Concepts. 2 Is the project justified ?- Are benefits greater than costs? Which is the best investment if we have a set of mutually exclusive.
Unit 3 (cont.): Economic Analysis— Cost-Benefit Analysis 2.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Net Present Value and Other Investment Criteria Chapter 9.
CHAPTER 12 THE CAPITAL BUDGETING DECISION Capital Expenditures Decision §CE usually require initial cash outflows in hope of future benefits or cash.
Benefit Cost Ratio Asso. Prof. Dr. Vanchai Rijiravanich Siam University Jan
NPV and Other Investment Criteria P.V. Viswanath Based partly on slides from Essentials of Corporate Finance Ross, Westerfield and Jordan, 4 th ed.
1 Capital investment appraisal. 2 Introduction As investments involve large resources, wrong investment decisions are very expensive to correct Managers.
VI-Economic Evaluation of Facility Investments 1. Project Life Cycle and Economic Feasibility 2.Basic Concepts of Economic Evaluation 3.Costs and Benefits.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Net Present Value and Other Investment Criteria Chapter Nine.
PROJECT EVALUATION. Introduction Evaluation  comparing a proposed project with alternatives and deciding whether to proceed with it Normally carried.
HDM-4 Applications. 2 Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards.
AEC 422 Fall 2014 Unit 2 Financial Decision Making.
9-0 Net Present Value and Other Investment Criteria Chapter 9 Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
CHAPTER 8 CAPITAL BUDGETING Correia, Mayall, O’Grady & Pang Copyright Skystone © Objectives n At the end of the chapter, you should be able to;
Hawawini & VialletChapter 71 ALTERNATIVES TO THE NPV RULE.
Investment Decisions and Capital Budgeting
10-1 The Basics of Capital Budgeting Should we build this plant?
Investment Appraisal Discounting Methods
A Comparison of Approaches to Investment Analysis John Favaro Proc. Fourth International Conference on Software Reuse, 1996, IEEE Computer Press, p
Unit 4 – Capital Budgeting Decision Methods
1 Capital Budgeting Capital budgeting - A process of evaluating and planning expenditure on assets that will provide future cash flow(s).
COST BENEFIT ANALYSIS- PUBLIC SECTOR INVESTMENTS Lucky Yona.
Capital Budgeting The Capital Budgeting Decision Time Value of Money Methods of Capital Project Evaluation Cash Flows Capital Rationing The Value of a.
Chapter 6 Investment Decision Rules
BNFN 521 INVESTMENT APPRAISAL Lecture Notes Lecture Three.
CHAPTER TEN Capital Budgeting: Basic Framework J.D. Han.
Capital Budgeting Decide how to invest money so that its value is maximized.
CHAPTER NO. 4 CAPITAL BUDGETING. 2 Capital and Capital Budgeting Capital: is the stock of assets that will generate a flow of income in the future. Capital.
Basics of Capital Budgeting. An Overview of Capital Budgeting.
Software Project Management
CHAPTER 9 Net Present Value and Other Investment Criteria.
1 Cost-Benefit Analysis Public Economics Minda DC. Eduarte.
Introduction to Economics of Water Resources. Public or private Excludability (E): the degree to which users can be excluded Subtractability (S): the.
Evaluation of Low Volume Roads Rodrigo Archondo-Callao Senior Highway Engineer, ETWTR January 10, 2008 The World Bank.
IS NPV IS SUPERIOR TO IRR
0 Corporate Finance Ross  Westerfield  Jaffe Seventh Edition 6 Chapter Six Some Alternative Investment Rules.
Investment Appraisal. Investment appraisal This refers to a series of analytical techniques designed to answer the question - should we go ahead with.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
Other Criteria for Capital Budgeting Text: Chapter 6.
Capital Budgeting Techniques. Capital budgeting is the process of evaluating capital projects, projects with cash flows over more than one year. The four.
DMH1. 2 The most widely accepted objective of the firm is to maximize the value of the firm. The financial management is largely concerned with investment,
CIMA P2 Advanced Management Accounting
Investment Appraisal - Is it worth it?
Economic Concepts Christopher R. Bennett
Introduction to Economics of Water Resources Lecture 5
Project Feasibility Analysis
GCE PROFESSIONAL BUSINESS SERVICES AS 3
Presentation transcript:

Economic Analysis Concepts

2 Is the project justified ?- Are benefits greater than costs? Which is the best investment if we have a set of mutually exclusive alternatives? If funds are limited, how should different schemes be ranked? When should the Application systembe built or upgraded? Questions & Decisions (1)

3 What standard of Development should be used? Are anycomplementary investments required? Questions & Decisions (2)

4 All appraisals need a framework or model for: a) Forecasting changes b) Evaluating those changes Appraisal Framework

5 Costs and benefits are measured in terms of invested money Systemdevelopment and maintenance costs are compared with estimates of the direct primary benefits going to system users Economic prices are used in constant terms Components of Economic Analysis (1)

6 Costs and Benefits are forecast over the planning time horizon (usually between 5 and 10 years) Future Benefits are valued  less time cosumption Components of Economic Analysis (2)

7 The cost to the economy of development and maintenance may differ from the financial cost because of : Type of work taxes The Organizations will usually be concerned with ECONOMIC costs. Economic and Financial Prices

8 In an Economic Appraisal we use ECONOMIC (or SHADOW) prices NOT FINANCIAL prices Adjust financial prices as follows: Exclude all taxes and cost and subsidies Use the planning discount rate not financial market rate If overvalued exchange rate then value imports and exports more highly Use the opportunity cost of worker Standard Conversion Factors (SE) are now widely used for road construction costs Use of Economic Prices

9 Management (including design and supervision) Workers Hardware Materials (Others) Environment Project Costs

10 Reduced operating costs (VOC) How.... Primary Effects (1)

11 Changes in Internal output Changes in services Changes in industrial output Changes in consumers behavior Changes in Profit Other Effects

12 Captures primary benefits Advantages: Simple, cost based, traffic approach dependent on predicting changes in usage Disadvantages: May not address critical factors during development or social access Consumers’ Surplus Approach

13 Captures secondary benefits Advantages: Draws attention to changes in output (key economic activity) Disadvantages: No reliable way of predicting response - impact studies give widely different answers - For most projects benefits are just invented ! Producers’ Surplus Approach

14 Increased Farmgate Price Lower Input Costs Price & Costs per Unit of Output Output O1O2 P2 P1 Example Producers’ Surplus

15 Any economic analysis should be designed to give maximum usage and benefits But we must avoid double counting. Do not add primary and secondary benefits In a competitive economy the consumers’ surplus approach should be adequate Coverage and Double Counting

16 Economic analysis involves a comparison of “With” and “Without” project cases An unrealistic “Without” case (i.e. with little maintenance) can give a false result A range of “With investment” cases should be analyzed to find the best solution Economic Comparisons

17 Development benefits arise from a combination of increased work load and reduced transport costs. Benefits may also include : Increased production Increased service provision Increased industrial activity Development Benefits

18 Economic Decision Criteria NPV IRR 3 NPV/CFYRR Project economic validity Mutually exclusive projects Project timing Project screening 1 Under budget constraint 2 Notes: 1. check for robustness to changes in key variables (sensitivity analysis) 2.with incremental analysis

19 The Net Present Value (NPV) of a project alternative relative to the without project alternative is the sum of the discounted annual net benefits. The Internal Rate of Return (IRR) is the discount rate at which the NPV is zero. NPV and IRR

20 1.If the NPV is positive, for the chosen discount rate, then the alternative is acceptable. 2.If the NPV is negative, for the chosen discount rate, then the alternative is unacceptable. 3.If the NPV is zero, for the chosen discount rate, then the alternative is indifferent to the without project alternative. NPV Decision Rule

21 When comparing project-alternatives, the Net Present Value (NPV) is used to select the optimal project-alternative (alternative with highest NPV) The Internal Rate of Return (IRR) or the B/C ratio are not recommended to compare alternatives of a given project Comparison of Alternatives

22 An Appraisal is carried out before an investment is made. Everything is uncertain. A Post evaluation may be made say 5 years after the investment. The investment is known and 5yrs of with case are known. The without case is unknown as is the remainder of the with case. Appraisals & Post Evaluations (1)

23 In Both Cases forecasting and evaluation models are required to come to an answer. Hence we can never be certain about the viability of an investment ! Appraisals & Post Evaluations (2)

24 Cost Effectiveness Analysis (CEA) Compares the cost of interventions with its predicted impacts and it is used where the benefits cannot be measured in monetary terms, or where the measurement is difficult It includes provisions that (a) the objectives of the intervention are indicated and are clearly part of a ampler program of objectives (such as reduction of the poverty); and (b) the intervention represents the smaller cost alternative of obtaining the indicated objectives It produces effectiveness indicators, such as Total Beneficiary Population per Investment or Investment per Beneficiary Population