Chapter Twelve Capital Allocation: Real Options. Copyright © Houghton Mifflin Company.All rights reserved. 12–2 Intertemporal Decision Making Winners.

Slides:



Advertisements
Similar presentations
1 Options. 2 Options Financial Options There are Options and Options - Financial options - Real options.
Advertisements

CHAPTER 14 Real Options.
1 Finance: Net Present Value 8.1 ECON 201 Summer 2009.
Chapter 22 - Options. 2 Options §If you have an option, then you have the right to do something. I.e., you can make a decision or take some action.
Basic Macroeconomic relationships
MGT 821/ECON 873 Options on Stock Indices and Currencies
© Paul Koch 1-1 Chapter 10. Basic Properties of Options I. Notation and Assumptions: A. Notation: S:current stock price; K:exercise price of option; T:time.
11-1 By Donglin Li CHAPTER 12 Cash Flow Estimation and Risk Analysis Relevant cash flows Sunk cost Opportunity cost Incidental effect Risk Analysis.
Chapter 8: Strategy and Analysis Using NPV
Chapter 4 Real Options and Project Analysis
Chapter 4 New Venture Strategy Copyright¸ 2003 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted.
Copyright © 2003 Pearson Education, Inc.Slide 17-1 Chapter 17 Real Options.
4. Project Investment Decision-Making
Spreads  A spread is a combination of a put and a call with different exercise prices.  Suppose that an investor buys simultaneously a 3-month put option.
Options and Derivatives For 9.220, Term 1, 2002/03 02_Lecture17 & 18.ppt Student Version.
Option Theory and Housing Jeff Kelsh. Housing  Owning a house is a right and not an obligation, therefore it is an option.  Option to buy or rent 
Chapter McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. 1 A Brief History of Risk and Return.
Options on Stock Indices and Currencies
Value maximization and options Economics 234A. Course web page (near future) 
Chapter 16: Real Estate and High-Risk Investments Garman/Forgue Personal Finance Ninth Edition PPT slide program prepared by Amy Forgue and Ray Forgue.
Prof. Ian Giddy New York University Valuation of New Ventures.
Aswath Damodaran1 Session 20: The Option to Delay Valuing patents and natural resource reserves.
Chapter 16 Real Estate and High-Risk Investments.
Chapter 5 (cont’d) Costs (Long-Run). Sony Morita: Came to U.S. in 1955 hoping to sell his new radio. His story is illustrated in this diagram
Chapter 20 Option Valuation and Strategies. Portfolio 1 – Buy a call option – Write a put option (same x and t as the call option) n What is the potential.
Option Theory Implications for Corporate Financial Policy.
Chapter 1 Overview of a Financial Plan
Copyright © 2003 McGraw Hill Ryerson Limited 25-1 prepared by: Carol Edwards BA, MBA, CFA Instructor, Finance British Columbia Institute of Technology.
Chapter 24 Fundamentals of Corporate Finance Fourth Edition Options Slides by Matthew Will Irwin/McGraw Hill Copyright © 2003 by The McGraw-Hill Companies,
Professor XXXXX Course Name / # © 2007 Thomson South-Western Chapter 18 Options Basics.
Chapter 15 – Arbitrage and Option Pricing Theory u Arbitrage pricing theory is an alternate to CAPM u Option pricing theory applies to pricing of contingent.
Understanding options
8- 1 McGraw Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved Chapter 8 Net Present Value and Other Investment Criteria.
MINICASE.
Chapter 4 --Value-driven Management -- Arbitrage u Explain how arbitrage works to ensure that the prices of financial claims are equal to the present value.
Chapter 10: Options Markets Tuesday March 22, 2011 By Josh Pickrell.
Chapter 7 Fundamentals of Corporate Finance Fifth Edition Slides by Matthew Will McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc.
Chapter 10 Principles of Corporate Finance Eighth Edition A Project is Not A Black Box Slides by Matthew Will Copyright © 2006 by The McGraw-Hill Companies,
CORPORATE FINANCE III ESCP-EAP - European Executive MBA 24 Nov a.m. London Project Appraisal-Dealing with uncertainty I. Ertürk Senior Fellow in.
Chapter 16 Investment Information and Transactions Lawrence J. Gitman Jeff Madura Introduction to Finance.
Chapter Sixteen Physical Capital and Financial Markets.
Options (1) Class 19Financial Management,
Chapter Six Real Interest Rates. Copyright © Houghton Mifflin Company. All rights reserved.6 | 2 Investors care about how much they can purchase with.
Chapter Six Profit Maximization: Seeking Competitive Advantage.
Chapter 3 Performance Copyright © Houghton Mifflin Company.All rights reserved. 3–23–2 Market Process Recall the survey -- scarce goods and resources.
Chapter 4 --Value-driven Management -- Arbitrage u Explain how arbitrage works to ensure that the prices of financial claims are equal to the present value.
© 2010 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible Web site, in whole or in part.
FIN 614: Financial Management Larry Schrenk, Instructor.
1 Chapter 20 Benching the Equity Players Portfolio Construction, Management, & Protection, 4e, Robert A. Strong Copyright ©2006 by South-Western, a division.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Basics of Real Options.
Page 1CS March 2002 Value Based Software Reuse Investment A Review Susan K. Donohue Department of Systems and Information Engineering.
Chapter 19 An Introduction to Options. Define the Following Terms n Call Option n Put Option n Intrinsic Value n Exercise (Strike) Price n Premium n Time.
Real Options Thinking IOM580 Hiroshi Ochiumi 1. Traditional NPV Analysis Discounts future cash flows to their present value. In 1970, 57% of large corporations.
Lecture 2.  Option - Gives the holder the right to buy or sell a security at a specified price during a specified period of time.  Call Option - The.
ECON 201 Lecture 4-5(a) Finance: Net Present Value & Benefit/Cost Analysis.
Capital Budgeting and Financial Planning Course Instructor: M.Jibran Sheikh.
CAPITAL BUDGETING &FINANCIAL PLANNING. d. Now suppose this project has an investment timing option, since it can be delayed for a year. The cost will.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Basics of Financial Options.
Lecture 03.0 Project analysis Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved McGraw-Hill/Irwin.
 Start with a specific measurable goal ◦ Save $ to open an IRA  Pay Yourself First ◦ Set up a direct deposit to a personal club account. ◦ Open.
1 Real Options Ch 13 Fin The traditional NPV rule is a passive approach because … The traditional NPV approach assumes  mangers do not have influence.
Options on Stock Indices and Currencies Chapter 15 Options, Futures, and Other Derivatives, 7th International Edition, Copyright © John C. Hull
Chapter Five The Demand Curve and the Behavior of Consumers.
1 CHAPTER 12 Real Options Real options Decision trees Application of financial options to real options.
Chapter 1 Overview of a Financial Plan. Copyright ©2014 Pearson Education, Inc. All rights reserved.1-2 Chapter Objectives Explain how you benefit from.
Copyright © 2002 South-Western Financial options Black-Scholes Option Pricing Model Real options Decision trees Application of financial options.
Chapter 2 : Goals, Value & Performance
17 Chapter Financial Management. 17 Chapter Financial Management.
Chapter 10. Basic Properties of Options
Options.
Presentation transcript:

Chapter Twelve Capital Allocation: Real Options

Copyright © Houghton Mifflin Company.All rights reserved. 12–2 Intertemporal Decision Making Winners of a $1 million lottery (net after taxes) in Florida wanted to sell their tickets. The lottery paid $50,000 per year for 20 years. What would you pay for the ticket?

Copyright © Houghton Mifflin Company.All rights reserved. 12–3 Intertemporal Decision Making Present value Future value

Copyright © Houghton Mifflin Company.All rights reserved. 12–4 Intertemporal Decision Making Net present value is the present value of cash flow less the cost of the investment. NPV = $50 + $50 - $60 (1+r) (1+r)2

Copyright © Houghton Mifflin Company.All rights reserved. 12–5 Intertemporal Decision Making Suppose the cost of capital, r, is 10%. Then: NPV = $50 + $50 - $60 (1+.1) (1+.1)2 = $50(.909) + $50(.826) - $60 = $ $ $60 = $26.75

Copyright © Houghton Mifflin Company.All rights reserved. 12–6 Capital Allocation Microsoft is moving into further development of windows, the internet, and other areas. The manager of software development for residential users has requested $500 million for new facilities. The manager of software development for commercial users has requested $1 billion for facilities and research. The manager for software production has requested $5 billion over two years for additional facilities.

Copyright © Houghton Mifflin Company.All rights reserved. 12–7 Intertemporal Decision Making So the NPV of each project would be calculated, and then what? The highest NPV is chosen? All NPV above zero are chosen? Focusing on economic profit means focusing on those investments returning more than all costs, including capital costs.

Copyright © Houghton Mifflin Company.All rights reserved. 12–8 Options The NPV approach is a NOW or NEVER. But, it is possible that an investment would look different a year or two from now. Perhaps the allocation of resources should be considered in terms of an option -- having the choice of making the allocation now, later, or never.

Copyright © Houghton Mifflin Company.All rights reserved. 12–9 Options A stock option enables the owner to “exercise” the option -- buy or sell the stock -- at a specific price, the “strike price.” A call option allows the owner to buy the stock. A put option allows the owner to sell the stock.

Copyright © Houghton Mifflin Company.All rights reserved. 12–10 Options Executive pay is often put in terms of stock options. The executive is given the option of purchasing several shares of stock at a specified price. If the stock price rises above the specified price, the executive may exercise the option, thereby purchasing the stock at the exercise price and selling it at the current stock price.

Copyright © Houghton Mifflin Company.All rights reserved. 12–11 Options Many business opportunities have the same features as options. 1.Rubbermaid’s entrance into China is an example. 2.Lincoln Electric’s expansion into other countries is also an example.

Copyright © Houghton Mifflin Company.All rights reserved. 12–12 Options (cont’d) 3.Ben and Jerry’s expansion. 4.Hollywood Entertainment’s introduction of three new movies. 5.Brand name expenditure, product line extension, price changes, relocation, facility changes, new markets, and so on, are others.

Copyright © Houghton Mifflin Company.All rights reserved. 12–13 Real Options When resources are considered rather than just stock, the opportunity is referred to as a real option. A real options approach may be useful: a)When uncertainty is large enough that more information could be valuable. b)When the value seems to be more in future possibilities than current cash flow. c)When there will be project updates and midcourse changes.

Copyright © Houghton Mifflin Company.All rights reserved. 12–14 Valuing Options To know if considering an opportunity as an option is useful, we must determine a value for the option. Suppose a NPV is negative, but it is possible to delay making a decision for a couple of years. This option has a value if there is any chance the NPV could change during those two years.

Economic Value (NPV) + interest 0 1 increasing Volatility Probably never neverInvest now Maybe now Probably later Maybe later

Copyright © Houghton Mifflin Company.All rights reserved. 12–16 Valuing Options Consider the following two projects: Project 1Project 2 Asset value100m Capital cost90m110m NPV10m-$10m TimeNow2 yrs Value VolatilityO4 RegionnowProbably later

0 1 Probably never neverInvest now Maybe now Probably later Maybe later Economic Value (NPV) + interest increasing Volatility

Copyright © Houghton Mifflin Company.All rights reserved. 12–18 Valuing Options The Black-Scholes option pricing formula gives the value of each call option as: Project 1 Project 2 $10 $23.24

Copyright © Houghton Mifflin Company.All rights reserved. 12–19 Managing the Value of Options Having defined an option and determined its value is really the first step. The most important step is managing the value of options. Uncertainty -- volatility -- increases the range of potential outcomes. This is good if a decision can be deferred.

Copyright © Houghton Mifflin Company.All rights reserved. 12–20 Managing the Value of Options As time passes, that is, as it gets closer to the now or never time, the value of the option declines. The position on the pricing diagram moves upward and to the left. The value of an option will rise if: a)The value of a project can be increased. b)The capital costs can be decreased. c)The likelihood that the project’s value will change increases.