TRIRIGA 10.3.2 / 3.3.2 Beta Registration Jim DeGroot 9/17/2013.

Slides:



Advertisements
Similar presentations
MY NCBI (module 4.5). MODULE 4.5 PubMed/How to Use MY NCBI Instructions - This part of the: course is a PowerPoint demonstration intended to introduce.
Advertisements

A Producer’s Guide to Chubb’s SMART Application Platform
Five Steps in 5 Minutes Close deals faster, more easily, more often! 1.Start a Quote: Input deal amounts and review the available lease options 2.Create.
HP Support Agreement Manager Tools Support Contract Assistant (SCA) Quick Reference Guide September 2006.
SAM 2007 v3.0 The Student Experience Including SAM Projects and Course Assess assignments.
Program Management Portal: Overview for the Client
GP2013 (R2) New features in GP2013 (R2). New Ribbon for windows Edit List is the Print button on the right without the paper background Action pane can.
PROACTIS: Supplier User Guide
Using PantherFile A guide for UWM students Welcome and Navigation Welcome to Using PantherFile, a guide for UWM students. You can link directly to the.
Presented by Office of Distance Education of Learning Technologies.
MIP Workbench: Revisions FEMA Learning Management System FEMA REVISION LEAD.
MIP Workbench: Revisions FEMA Learning Management System Audit Lead.
Bullseye Bullseye was rolled out to our user base on Friday, January 30. I wanted to take this opportunity to give everyone an update on a.
Go to Slide Master View to edit Footer 1 Introduction to the Online Help Desk Unit Liaison Meeting June 19, 2009.
1 Introduction to OBIEE: Learning to Access, Navigate, and Find Data in the SWIFT Data Warehouse Lesson 2: Logging in and out of OBIEE This course, Introduction.
TRIRIGA Anywhere 10.4 Beta Registration Steps
Program Management Practice Program Management Portal: Overview for the Client © 2011, 2015 BM Corporation 1.
Project & Portfolio Management Software. Definitions and processes Navigation and overview How to create and edit a project: – General details – Resources.
DuPont E-Sourcing Supplier Participation January 2012.
Designed By: Technical Training Department
Overview of New Behind the Blackboard for Blackboard Customers APRIL 2012 TM.
PROACTIS: Supplier User Guide Contract Management.
Hosted Exchange The purpose of this Startup Guide is to familiarize you with ExchangeDefender's Exchange and SharePoint Hosting. ExchangeDefender.
Quick Reference Guide Welcome TEST USER Version_NSU_ HELP RETIREMENT MANAGER DEMO FEEDBACK.
Introduction: This VCSS training session has been developed to provide : I.A quick overview of VCSS II.A walk through of the main VCSS features III.Solutions.
Copyright © 2013, Oracle and/or its affiliates. All rights reserved. Insert Information Protection Policy Classification from Slide 12 1.
Denise Luther Senior IT Consultant Practical Technology Enablement with Enterprise Integrator.
1. 2 INTRODUCING 3 What is iREMS? A newly designed Secure System Integrated Real Estate Management System ( iREMS ) that replaces the previous Real Estate.
Software Updates © Copyright 2011 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
QuickStart Toolkit & Template Extension Module Webinar 10 th of December 2009.
You can access the MyYSU Portal through the YSU website [
Instructors begin using McGraw-Hill’s Homework Manager by creating a unique class Web site in the system. The Class Homepage becomes the entry point for.
Activating Clarity  Activating Clarity  Activation  Online Activation  Fax Activation  Review and Verify Activation and License Terms  Updating.
Module 3: Administrator Set-Up Intuit Financial Services University Internet Banking Certification Training.
Copyright © 2006, Infinite Campus, Inc. All rights reserved. User Security Administration.
Project Management Inspections and Reviews 1 February.
Staff Module and Summary of Changes 1. Icon Changes: Page 3 Signing In and Password/Pin Changes: Page 4 Logging Out: Page 8 Staff Module Changes: Page.
©2013 JPMorgan Chase & Co. Proprietary and Confidential smartdata.gen2 Expense Report Training.
VLSC December 2009 Release Release Date: December 7th, 2009.
MassHealth Medicaid Management Information System (MMIS) Provider Online Service Center (POSC) Technical Upgrade January 13, 2016.
Part 1 Slide 1 4 Steps to Conducting a Complete MarcoPolo Field Training 4 Steps to Conducting a Complete MarcoPolo Field Training A Field Trainer’s Guide.
Staff Module and Summary of Changes 1. Icon Changes: Page 3 Signing In and Password/Pin Changes: Page 4 Logging Out: Page 8 Staff Module Changes: Page.
Global Field Operations From Vision to Value Cisco Confidential1© 2011 Cisco and/or its affiliates. All rights reserved. Access to PMC Partner Training.
Upay User Guide WELCOME TO UPAY This guide is aimed to help you to use the Upay website. To launch Upay you will need to navigate to
Vodafone India Partner On-boarding Quick Start Guide.
IT Desktop Management GoToMeeting – Online Meeting Service Attendee Guide May 2007 Prepared by Angela Mars IT Education and Training.
Step 1 Lead Notifications Dear Partner, New leads have been assigned to your organization based on customer preference and are available for you.
IT Desktop Management GoToMeeting – Online Meeting Service Organizer/Presenter Guide May 2007 Prepared by Angela Mars IT Education and Training.
DHHS Open Window Office of Procurement & Contract Services Login & Set up Profile.
Microsoft Customer 2 Partner Connector Quick Reference Guide
© 2014 RENTPAYMENT | 1 HOMEOWNER USER GUIDE. 10 © 2015 DUESPAYMENT | 2 TABLE OF CONTENTS Welcome To DuesPayment 3 DuesPayment Support 4 Main Menu 9 Make.
1 State of Connecticut Core-CT Continuing Education Initiative Asset Management for Asset Processors.
© 2013 IBM Corporation IBM UrbanCode Deploy v6.0 Support Enablement Training Jenkins plug-in 1 November 2013.
Migration to Central Data Exchange (CDX)
Getting Started with... Business Partner Express
Program Management Portal (PgMP): What’s New in R8 for the Client
Partner Program Platform Training Partner Self Service
Consumer Cloud Monitoring – Beta Sprint Demo
Program Management Portal (PgMP): What’s New in Release 16.1
My Oracle Support (The next generation Metalink experience) lynn
Expense Report Training
System Navigation and Test Launch
Navigating PartnerNet
Optimizing Efficiency + Funding
How to Create and Start a Test Session
Contract Payment Reporting Module (CPRM)
LEAP 360: Accessing EAGLE 2.0.
Banner 9: Financial Aid Francesca Sisto Di Emidio Sr. User Liaison
Password Reset and Access Management
Presentation transcript:

TRIRIGA / Beta Registration Jim DeGroot 9/17/2013

2 Notices References in this material to IBM products, programs, or services do not imply that they will be available in all countries in which IBM operates. This material, including any plans contained in the material, may change at any time at IBM's sole discretion, based on market opportunities or other factors, and are not intended to be a commitment to future content, including product or feature availability, in any way. Statements regarding IBM's future direction or intent are subject to change or withdrawal without notice and represent goals and objectives only. Please refer to Terms of Use for more information.

3 Agenda Schedule overview Brief content overview Registration Process Documentation link

4 Schedule overview 4Q2013 TRIRIGA / releases 09/17/13 Hosted Beta registration begins 10/02/13 Hosted Beta kick-off meeting 10/02/13 Hosted Beta begins 10/11/13 Hosted Beta code refresh 10/18/13 Request for Beta feedback surveys 10/24/13 Beta survey feedback due 11/01/13 End of Hosted Beta

5 Content overview Link to Transparent development site – /index.htmlhttp:// /index.html

6 Content overview – Lease Accounting 1.Support the current International Financial Reporting Standards (IFRS) as defined by International Accounting Standards Board (IASB) for international TRIRIGA customers 2.Enhancements to support the calculations required by the most recent FASB/IASB Exposure Draft (both Type A and Type B leases) 3.All enhancements in this release done for both Real Estate and Asset Leases 4.Enhancements to the Amortization schedule, Straight-line schedule and NPV calculations based on customer and partner feedback The inclusion of Tenant Improvements, Index Adjustments and Residual Value in the calculations Calculate Amortization over Lease term (as well as Likely term) Calculate NPV using the straight line schedule (this incorporates the payments over time) Support for payments In Advance or In Arrears 5.Enhancements to Adjustment and Amendment Adjust for amendments due to expansion (lease obligation) or extension/reduction (lease term) CPI rent schedule adjustment should update the Straight-line rent 6.Enhancements to lease accounting-related graphs (current standard vs. Exposure Draft) to accommodate the enhancements noted above

7 Content overview – Time to Value An initiative to aid in shorter system implementation and setup time with a focus on the Space Management application 1.Quick Start Guide –Product Installation –Core data setup plus CAD Integration –Security and Portals –Process overviews 2.Portfolio Data Migration Kit –Preconfigured Staging Tables and DataConnect Jobs –Geography, Organization, Location, People modules 3.Contact Role Management –Tooling to support initial setup and ongoing maintenance of contact roles –Geography, Organization, Location, Asset, People, Contracts and Projects modules

8 Content overview - Accessibility Accessibility: Include accessibility support of the Capital Projects module including keyboard accessibility for all functionality and keyboard navigation support, without requiring specific timings for individual keystrokes. 1.Primary Navigation: Provide support for Menu, Banner, Project Selector Keyboard support including Tab and Arrow Key navigation for primary menu Navigation and selection functions Defined hierarchy for screen reader functions Banner will be navigable and all actions accessible (includes the project selector dialogue) 2.Portal: Improved keyboard and screen reader support for portal sections including table and navigation/link sections. Navigation, including Accessible Rich Internet Application (WAI-ARIA) support for portal section listing and navigation. All portal section header controls accessible. Content, including GWT Based tabular sections, Navigation type selections, HGrid Control, and non-graphical charts. 3.Record Runtime: Keyboard and screen reader by way of Accessible Rich Internet Applications (WAI-ARIA) constructs for record runtime components. 4.Gantt Equivalent Facilitation Task creation, editing, dependency management all to be provided in form based solution Critical path calculation to be accessible from the platform and exposed in the standard form based solution 5.Charting Equivalent Facilitation Provide non-graphical, table based alternatives with appropriate controls to facilitate information access Investigation for alternative accessible charting solutions

9 Registration Process – Part 1 1) The following URL will take you the entry page for Tivoli Early Programs. 2) Once there, you will be required to create an IBM.com ID if you do not already have one. 3) After you have created your IBM.com ID, please login. 4) The next page will prompt you for an Entitlement or Access Key. Please enter the key provided in step #5.

10 Registration Process – Part 1 (continued) 5) Your Access Key is : UCBLV27K2Q (sample only) 6) You will be routed to accept the Early Programs license - attached below. 7) Upon accepting this license, you will be brought to the overview page of the TRIRIGA early program site. You will see three main links for Overview, Support and Cloud. On the Support tab, you will find contacts for the program. On the Cloud tab, you will find the required links to begin the process to access the IBM Early Programs Cloud. Please navigate there.

11 Registration Process – Part 1 (continued) 8.) Once on the Cloud page, step one provides the link to accept the license to access early release software on our network (attached below for reference). Accepting this license will notify me that you have accepted all of the required terms and I will send a follow-up with your Early Programs Cloud Credential that will allow you to proceed to step 2, download the Cisco AnyConnect client and connect through the EP Cloud Gateway to the hosted TRIRIGA image.

12 Registration Process – Part 2 To access the IBM TRIRIGA beta instance, you will now need to use the EP Cloud credential to download and install the Cisco AnyConnect VPN client. 1) Please return to the IBM TRIRIGA Early Programs Website. NOTE: You must login using your IBM.com ID and credential that you created, not the EP cloud login. 2) Once there, please navigate to the cloud tab:

13 Registration Process – Part 2 (continued) 3)Step 2 on the cloud tab has the link to download the VPN client. Selecting it will take you to the remote access login page 4) Please select SWG_EP_Cloud as the group. Username will be your internet id and the Password is the credential provided in this 5) Successful login will attempt to do a browser based installation of the VPN client. Should the download/installation fail, you should be provide a link to manually download the installer. 6) After successful installation of the VPN client, please try to connect. If the Connect To: is empty, please enter this value: asa003b.centers.ihost.com 7) Upon successful connection, you should be able to access the beta system at:

14 Documentation link Documentation will be located on the wiki here prior to Hosted Beta start date. This is on the IBM Developer Works: wikis/home?lang=en#!/wiki/IBM%20TRIRIGA1/page/Op en%20Beta%20documentation