Duke Energy Carolinas Smart Grid Investment Grant Tim Bradberry Tim. NASPI Work Group Meeting October 12-13, 2011 1.

Slides:



Advertisements
Similar presentations
Advanced Energy Conference New York, NY October 31, 2012
Advertisements

The Western Interconnection Synchrophasor Program (WISP ) Update Vickie VanZandt Joint Synchronized Information Subcommittee Salt Lake City August 10,
WISP RFI for Applications response summary
Using Synchrophasors for Preventing Cascading Outages
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
ISO New England Smart Grid Investment Grant Update David Bertagnolli – NASPI Working Group Meeting October 12-13,
Marianna Vaiman, V&R Energy
Idaho Power Update JSIS Meeting March 3, Infrastructure PMU installations: 24 PMU sites: 15 WISP PMU Installations: 5 WISP PMU sites: 3 WISP installations.
New Energy Horizons Opportunities and Challenges Update on IEEE PC Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement.
Reliable Power Reliable Markets Reliable People Challenges and Opportunities in the Power Industry in Alberta CERI Conference October 22 & 23, 2007 Warren.
Washington DC October 2012 A Vision for an Advanced Supervision and Control System for the Electric Grid Ramón A. León XM S.A. E.S.P Colombia.
AMI & Grid Data Analytics & Analysis Management Platform Page  1 What does this platform offer? Our tool is a next generation grid management software.
and Trend for Smart Grid
Synchrophasors: Improving Reliability & Situational Awareness
SmartGridCity™: A blueprint for a connected, intelligent grid community Presented to the Utah Public Service Commission May 13, 2009.
1 Grid Modernization – A Strategic Imperative for 2050 Advanced Energy Conference May 1, 2013 By Carl Imhoff Electric Infrastructure Sector Manager Pacific.
1 MISO Business Plan: Enhanced Reliability, Customer Service & Market Implementation James P. Torgerson, President & CEO Midwest ISO December 17, 2003.
Introduction to Phasor Measurements Units (PMUs)
North American Synchrophasor Project Initiative NASPI Work Group Meeting Oct , 2011 Joseph H. Schaefer Florida Power & Light.
1 Value now. Value over time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Using OSIsoft to Become Compliant James Cosgrove, Northeast Utilities.
Update to AABE on DOE Smart Grid Investment Grants and Smart Grid Regional Demonstrations Christopher Irwin Smart Grid Standards and Interoperability Coordinator.
NASPI Proposed Maturity Model for Synchrophasor Deployment Alison Silverstein (NASPI) Ryan Quint (Dominion Virginia Power) Kyle Thomas (Dominion Virginia.
NASPI overview and update
CAISO Update JSIS Meeting March, Infrastructure 92 Connected PMUs 64 Substations 7 PDCs reporting (BPA, PG&E, SCE, SDG&E, APS, SRP and NVP) Redundant.
American Transmission Company Smart Grid Investment Grant Update Jim Kleitsch NASPI Work Group Meeting October 12-13,
Advanced Metering Infrastructure
“Discovery Across Texas” New Technology Solutions for Wind Integration in ERCOT Synchrophasor Project Status Update Bill Muston Oncor Electric Delivery.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
I NTEGRATION OF S YNCHRO -P HASOR M EASUREMENTS IN P OWER S YSTEMS S TATE E STIMATION FOR E NHANCED P OWER S YSTEM R ELIABILITY Hassan Ghoudjehbaklou,
Academic Experience with Wide Area Sensors by Virgilio Centeno Virginia Tech PSC, Distributed Generation, Advanced Metering and Communications March 9,
James Brehm Senior Strategist Compass Intelligence.
Synchrophasor Measurement Implementation in ERCOT
© 2011 New York Independent System Operator, Inc. All Rights Reserved. Smart Grid Investment Grant Project Update Jim McNierney Enterprise Architect New.
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
U.S. Energy Information Administration Independent Statistics & Analysis ERUS 2014 Bulk Power and Reliability Proposed Changes to Form EIA-411.
1 Jon Sudduth Project Engineer, Intelligent Grid Deployment SWEDE April 26, 2011.
CCET as a Forum to Help Resolve Interoperability Issues Grid-Interop Stakeholders Coordination Panel Nov 11-13, 2008 Atlanta, GA Milton Holloway, Ph.D.
1 Floyd Galvan October 12-13, 2011.
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
V&R Energy’s Project under PRSP: Grid Operator’s Monitoring & Control Assistant (GOMCA) Marianna Vaiman, V&R Energy JSIS Meeting.
Phasor Measurement Units
Vermont Electric Power Company, Inc Vermont’s eEnergy Smart Grid Initiative Kerrick Johnson Vice President for External Affairs.
1 Application of Synchrophasor Technology To CREZ System CREZ Technical Conference January 26, 2010 Navin Bhatt American Electric Power.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
CASE STUDY Disturbance event comparing PMU and SE voltage angle difference in ERCOT Prakash Shrestha Operations Engineer Advanced Network Application.
1. U.G.ZALTE, EX-DIRECTOR (OPERATIONS) –MSETCL, A.R. KULKARNI. DATE: NOVEMBER 2013 CIGRE TUTORIAL AND COLLOQUIUM ON SMARTGRID MYSORE, KARNATAKA.
WebEx Cloud Connected Audio Enterprise
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Pacific Northwest Smart Grid Demonstration Project  Largest Smart Grid Demonstration.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Preparing the Proposal Designing and Supporting Computer Networks – Chapter 9.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA - WISP Project NASPI Work Group Meeting October 12-13, 2011 Scott Lissit – Project Manager,
PJM Interconnection Smart Grid Investment Grant Update
1 © A. Kwasinski, 2015 Cyber Physical Power Systems Fall 2015 Security.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
Security and Resilience Pat Looney Brookhaven National Laboratory April 2016.
Findings from the DOE-OE Smart Grid Communications Program Meeting Validating the need for enhanced focus on smart grid communications research.
Workshop February 4, Idaho Power Smart Grid Vision At Idaho Power, our smart grid vision remains focused on seven major characteristics : 1.Enhance.
MISO – Synchrophasor GPA Users Forum Sept 7th, 2011.
ISO-NE Synchrophasor Related Projects
Maximizing Use of Synchrophasor Technology for Everyday Tasks
Utility Needs and Smart Grid for Major Storm Events
SCE Utility Update JSIS Meeting March, 2015.
Authors : P. Mukhopadhyay, Abhimanyu Gartia, Samit Kumar Saha,
Harvard CRM Service Strategy
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Irvine Smart Grid Demonstration Distribution Volt / Var Control
WISP Follow on Reporting.
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Preparing the Proposal
Presentation transcript:

Duke Energy Carolinas Smart Grid Investment Grant Tim Bradberry Tim. NASPI Work Group Meeting October 12-13,

Project participants Duke Energy Carolinas – Megan Vutsinas, energy.com, energy.com – Tamara Harrison, energy.com, energy.com – 104 PMUs and 2 PDC systems to be installed Vendors: Alstom Grid, SEL, Cisco, OSIsoft 2

Project Map 3

Project Timeline 4

PMUs [Total (completed) project data except for installation pace] 1 transmission owner in project and 104 PMUs Transmission elements monitored by PMUs – 12 elements >345 kV (500 kV) – 92 elements ≥230 – 345 kV (230 kV) – 0 elements < 230 kV 100% of TOs regional footprint monitored by PMUs (based on load) 52 substations with PMUs – 2 PMUs/substation monitoring different elements 30 Samples/second PMU sampling rate Stand Alone SEL 351A PMU installation rate (stations) – # installed: 14 total, 13 new, 1 replacement by 9/30/11 22 total, 20 new, 2 replacement by EOY 2011 – # installed: 48 total, 45 new, 3 replacement by EOY 2012 – # installed: 52 total, 49 new, 3 replacement by May

PDCs and Communications [data below for completed project] PDCs – 2 BA/TO control centers with PDCs (using openPDC); each center has 1 primary and 2 regional clusters (see next slide) – Archive/database status 70 terrabyte 12 months of data to be readily accessible Communications system – Communication across TO’s private network – Utilize fiber or microwave for high bandwidth (≥512 kbps) – Primarily owned by TO with some leased circuits – Interested in Phasor Gateway 6

PDC System Design 7

Major operational applications using phasor data Plan to share data with external RCs & TOs as requested Wide-area situational awareness* – Proposal is to use Alstom e-terravision – Would integrate into the Alstom EMS – Evaluating options to ensure tool(s) implemented increases SA – Spring 2013 operational date State estimation* – Alstom EMS being upgraded to allow PMU data to be used in State Estimation – Fall 2012 operational date Near term (less than three years) applications – Post-Event Analysis* – Model Validation Long term (beyond three years) POTENTIAL applications – Angle and Voltage Stability – Other applications not yet mature, but will be monitored and revisited *Applications that we are focused on and feel provide the greatest initial benefit 8

Challenges and lessons learned What have been your biggest technical challenges to date? – Overwhelming amounts of data – Data hard to read when raw, needs to be scrubbed for users to look at – Getting the data into our historian (PI) What have been your biggest programmatic or execution challenges to date? – Dealing with unfamiliar regulations (e.g. Davis-Bacon) – Mechanics of metrics reporting Other lessons or insights about – PMU performance, installation experience or cost Sometimes difficult to tell if getting bad data or event occurred Signals dropping randomly, determined happened when train went by – Communications system design and performance Hard to have full redundancy with the amount of data & bandwidth required – Interoperability Clock and PMUs need same parity, or firmware update required Data extraction in a format that can be used as input to other apps – Physical or cyber-security Stand alone PMUs because of cyber Deployment slowed because tie to communications upgrade In-the-field inspections after install lead to some changes for better security – Data archiving What to archive (raw vs. compressed, compression settings, duration, etc) 9

Other things we should know about your project? Finalizing agreement with university and data analytics company for data manipulation and advanced applications (e.g. visualization, base lining, event detection, stability) Evaluating best support of the openPDC 10