ROCK ISLAND DISTRICT Mississippi River Maintenance Spare Miter Gates.

Slides:



Advertisements
Similar presentations
UMR = Balance of Environment and Transportation 1. Pool # 8 - Environmental Management Project 2. Transportation Route – human habitation & settlement.
Advertisements

Marine Construction SCM 330 Tyler Mason Pratt Tyler Mason Pratt
New Ways to Play and the Panama Canal Presentation By: Rhayven Coats & Jessica Reed.
Flood Control America presents The Invisible Flood Control Wall ™
INTRODUCTION TO INFRASTRUCTURE: AN INTRODUCTION TO CIVIL AND ENVIRONMENTAL ENGINEERING Chapter 4: Transportation Infrastructure.
Service Technology Accountability Results. Intralox & Hydrolox What We Do Water Screens Automotive Baking Beverage Container Corrugated Fruit and vegetable.
Fire Response Recommendation Upon dispatch to an industrial accident: Battalion needs to confirm location of incident - north side, south side, or in.
FIELD TRIP TO THE ARAL SEA September Northern hills at Butakov Bay (Small Aral)
Upper Mississippi River - Illinois Waterway System Feasibility Study Extended Lock Design Concept.
Chapter 8 Lesson 1 Test – Monday, January 10, 2011.
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Dredging Lance Engle Dredging Project Manager St. Louis District WEDA – Midwest 2012.
Building Strong! IHNC SURGE BARRIER GIWW MRGO. Building Strong! Trestle Construction About 2000’ of trestle allows precision installation of piles and.
Summit’s “TOOLBOX SAFETY TALK”
SAFETY TALK - SLIDE 1 OF 10 Elkhart Products Corporation 02/00 WELCOME THANKS TO ELKHART PRODUCTS CORPORATION FOR THIS “TOOLBOX SAFETY TALK” OSHA 29 CFR.
Boom Assembly Ladder Manitowoc Lattice Boom Cranes.
CPE Rebuild Facility 10/20/11. CPE Cloud Peak Energy (CPE) is one of the safest producers of low sulfur, high quality, subbituminous coal in the United.
Hoop Tech Clamp Assembly and Attachment. Contents of package.
One Corps Serving the Armed Forces and the Nation Navigation Lock and Dam Inspection and Emergency Repairs Workshop April 2006 Mel Price – Auxiliary.
Minimalist Human Mars Mission Surface infrastructure discussion July 26 th, 2008.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
2004 BRASS INSTALLATION HARDWARE. BRASS INSTALLATION FOR 2004 TOP AND BOTTOM SEXTANTS ONLY PROCEEDURE AND FIXTURES FOR TOP AND BOTTOM ARE SIMULAR.
Fire Service Ladders Module 1.
Belleville Locks & Dam Barge Accident on 6 Jan 05 John Clarkson
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Oakland Jr. High – STEM Classes – Project Update and 3D Printing March 26, 2015.
The In's and Out's of Locking Through a Dam By RiverBill.
Page1 Canal Boat Captain The year is 1848 and you are a canal boat captain. It is your job to transport a boat full of goods from Fort Wayne, Indiana to.
Development of Weir-Wall Contour-Matching PIT Tag Antennas for John Day Dam Adult Ladders PTAGIS Field Office Kennewick, Washington April 2015.
1 Great Lakes Observing System and Marine Operations Edison Boat Club – June 21 st, 2011 An ISO 9001:2008 Company.
The Invisible Flood Control Wall ™ Flood Control America presents.
STATE WIDE SIGN GUIDE This guide will demonstrate various sign mounting products and procedures for construction and maintenance.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
Magdeburg Water Bridge
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Presentation for 2012 WEDA Midwest.
Scotland, UK A Scottish Story Between the ports of Grangemouth and Falkirk the Forth & Clyde canal, was excavated in 1777 connecting the east coast of.
One Team: Relevant, Ready, Responsive, Reliable 1 Hannibal L/D Ohio River - Quoin Block Failure 110-ft x 1200-ft Main Lock Sep & Nov 2005 Pittsburgh District.
Research and Development Inland Waterways Conference 7 March 2007 Improved Hydrodynamic Design/Detection and Evaluation of Scour at Dams John E. Hite,
One Corps Serving the Armed Forces and the Nation Mel Price Locks & Dam Miter Gate Inspections Navigation Lock and Dam Inspection and Emergency Repairs.
 Balsa Wood Bridge 8 th. How Does a Bridge Stay Up?
Development of Bolt-on Low Profile Overflow / Orifice PIT Tag Antennas for John Day Dam Adult Ladders PTAGIS Field Office Kennewick, Washington November.
1 Smart Rivers Conference September 15, 2011 New Orleans, Louisiana “Status of Inland Waterways Infrastructure Funding”
How to Build a Divider Wall By Charysse Roberson.
Wisconsin’s Chamber Commercial Waterways of the Midwest MACE Transportation Panel November 4, 2015 Doubletree, Minneapolis, MN Jason Culotta Director of.
BUILDING STRONG ® Rock Removal on the Middle Mississippi River 1 RRAT 2014.
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
Rotating System Students: DINESH JOSHI RAJNISH VERMA RAMDEEN BISHNOI
“If you think we’ve got problems now... and …what can we do about it” Transportation Day-Pittsburgh May 17, 2007 James R. McCarville Port of Pittsburgh.
Port of Pittsburgh Commission James R. McCarville Met Coke Conference – Pittsburgh November 2, 2010 Welcome to the Port of Pittsburgh.
Measures of ecological patency on River Lieser and Moselle.
ORKA support - status report Scope of conceptual design task Develop a conceptual design for how to support the ORKA detector inside the CDF detector Develop.
US Army Corps of Engineers BUILDING STRONG ® Inner Harbor Navigation Canal Lock 2016 Dewatering Marine Industry Day USACE - New Orleans District 20 May.
Western Rivers/ Inland/ Great Lakes
Chapter 6.  Moveable rigs include drilling barges, drill ships, jack-up rigs, and semisubmersible rigs.  Offshore rigs use a device called a top drive,
EXPLORING VOLUME The volume of a solid is the number of cubic units
Town of Brighton, Department of Public Works
Hire Different Varieties of Lifting Gear in UK
Visit us online at Crane Truck Sydney Services By DELTA TRANSPORT.
ELKHART PRODUCTS CORPORATION
SBN Far Detector Installation & Integration
Infrastructure, Innovation and Standardization
USACE Standardization of Navigation Infrastructure
PIANC Work Group SMART Rivers 2017
Assembly instructions for M-K all bolt together hoppercone kit.
Shipping and Transport College Rotterdam
Illinois Waterway 2020 Consolidated Closure
Planting Forest Trees.
Valve stem “gag” mechanism
EXPLORING VOLUME The volume of a solid is the number of cubic units
Bunker Wall Design Wall ESS
Presentation transcript:

ROCK ISLAND DISTRICT Mississippi River Maintenance Spare Miter Gates

Mississippi River Project Location Map / Field Sites

Mississippi River Project Office Location: Near LeClaire Ia. Lock and Dam No. 14 & Auxiliary

Spare Gate System The spare miter gates are constructed from a set of 8 modules of varying heights. The modules are stacked to match the height of the service gate they are replacing. Each set includes the modules to construct a gate for either or both sides and the barge to store them. The barge includes vacant pads to assemble the gate, store up to two service gates, rigging and bolting required to assemble the gate.

Spare Gate Info Three Spare Gate Barges with gates are currently in service with one under construction The two in service and the third under construction are very similar and fit the same locks. One barge with accompanying gate sections will only fit Locks 19,26, and 27.

Spare Gate Info The first gate barge was constructed in 1941 at Ingalls Shipyard. It is 274 feet long and 40 feet wide. The second barge is very similar and is the same length but is 50 feet wide. The third barge is under construction at Eastern Shipyard. It will be 40 feet wide and 300 feet long. The largest barge is unique and only accommodates horizontally framed gates at Locks 19,26,&27. It measures 61’3” wide by 322’-9” long.

Spare Gate Top Section With Section to be Removed

Attaching New Section to Top

Pick Up New Section

Reattach Bottom Section

St. Paul District Main Gates UpperMain Gates LowerAux Gates UpperAux Gates Lower Lock Height UnitsBankHeightUnitsBankHeightUnitsHeightUnits 227'-0"AFECR30'-0"AGCR20'-0"ADB31'-9 5/8"AHGC 325'-0"AECR30'-0"AGCR27'-0"AFEC 420'-0"ACL23'-0"ADCL20'-0"AC 520'-0"ACR23'-0"ADCR23'-0"ADC 5A27'-0"AFECR27'-0"AFECR27'-0"AFEC 623'-0"ADCL25'-0"AECL25'-0"AEC 723'-0"ADCR25'-0"AECR23'-0"ADC 827'-0"AFECL30'-0"AGCL27'-0"AFEC 927'-0"AFECL33'-0"ADGCL30'-0"AGC 1025'-0"AECL30'-0"AGCR30'-0"AGC

Rock Island District Main Gates UpperMain Gates LowerAux Gates UpperAux Gates Lower LockHeightUnitsHeightUnitsBankHeightUnitsHeightUnits 1125'-0"AEC30'-0"AGCR30'-0"AGC 1225'-0"AEC30'-0"AGCR30'-0"AGC 1325'-0"AEC30'-0"AGCL30'-0"AGC 1423'-0"ADC27'-0"AFECR 1531'-9 5/8"AHGC31'-9 5/8"AHGCL31'- 9 5/8"AHGC31'-9 5/8"AHGC 1623'-0"ADC27'-0"AFECL25'-0"AEC

Rock Island District Main Gates UpperMain Gates LowerAux Gates UpperAux Gates Lower LockHeightUnitsBankHeightUnitsBankHeightUnitsHeightUnits 1725'-0"AECL30'-0"AGCL27'-0"AFEC 1823'-0"ADCL30'-0"AGCL23'-0"ADC 1925'-0"Vert.LR53'-2"R 2020'-0"ACR27'-0"AFECR27'-0"AFEC 2127'-0"AFECL33'-0"ADGCL33'-0"ADGC 2227'-0"AFECR33'-0"ADGCR30'-0"AGC

Rock Island District Illinois Locks Main Gates Upper Main Gates Lower Aux Gates Upper Aux Gates Lower Lock HeightUnitsHeightUnitsHeightUnitsHeightUnits Peoria17'-6"ABNA LaGrange17'-6"ABNA

St. Louis District Main Gates UpperMain Gates LowerAux Gates UpperAux Gates Lower LockHeightUnitsBankHeightUnitsBankHeightUnitsHeightUnits 2425'-0"AECR33'-0"AHGCR30'-0"AGCNA 2527'-0"AFECR35'-0"AEGCR35'-0"AEGCNA

Weight of Service Gates WEIGHT OF ONE GATE LEAF WITHOUT MUD AND ICE HEIGHTWEIGHT IN TONS

Spare Gate “A” Section

Spare Gate Section “C”

Spare Gate Section “D”

Spare Gate Section “E”

Spare Gate Section “F”

Spare Gate Section “G”

Spare Gate Section “H”

“Quad Cities” Gate Lifter

TESTING THE QUAD CITIES 220 TON AT 60 FT. RADIUS

Quad Cities Picking Lock 19 Gate

Setting Spare Gate Lock 19

Removing Spare at Lock 19

Removing top half of Spare

MV BETTENDORF, QUAD CITIES, SPARE GATE BARGE, & CARGO BARGES

MV BETTENDORF & TOW

MV ROCK ISLAND PUSHING PART OF STRUCTURE MAINTENANCE PLANT

MV ROCK ISLAND & TOW

Maintenance Support Our maintenance crews are available and looking for work the Winter of We can provide crane support up to 350 tons with the Quad Cities. We can provide mechanical dredging, debris removal or rock placement with two modern crane barges accompanied with reliable push boats. We have extensive experience with gate repairs or any related heavy steel field fabrication and construction

Old River Lock 85’ Miter Gate & Quad Cities

ASSISTED GATE CHANGE INDUSTRIAL CANAL LOCK - New Orleans District

Mechanical Dredging

Contact Information James B. Wilson Chief Mississippi River Maintenance Section