Advisors Dr. Liguang Tang (http://www.jlab.org/~tangl) Dr. Dave Mack (http://www.jlab.org/~mack/) for the beam modulation team Nuruzzaman (http://www.jlab.org/~nur/)

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

Y. R. Roblin, G2P review, 1/17/ HALLA G2P readiness review Yves Roblin, CASA.
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Lumi Analysis for HAPPEx III / PREX Presented by: Luis Mercado UMass - Amherst 5/18/2007.
Y. R. Roblin, Apr 23, 2009 Hall D Fast Feedback System Performance and configuration.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
The TIMING System … …as used in the PS accelerators.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Report of the NTPC Test Experiment in 2007Sep and Others Yohei Nakatsugawa.
New Methods for Precision M ø ller Polarimetry Dave Mack Jefferson Lab ( for Dave Gaskell ) May 20, 2006 PAVI06 Precision M ø ller polarimetry Beam kicker.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
HKS Analysis Status Report HKS Analysis Status Report Liguang Tang (Hampton/JLAB) Hall C User Meeting, Jan. 15, 2011 HKS has data taken in 2005 (E01-011)
Hall A Parity Workshop (May 10, 2002), 1 Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
COMPTON POLARIMETRY Collected data Cavity power Status on counting methods Systematic errors and hardware issues.
RF voltage and frequency interlocks A. Butterworth MP review 17/6/2010.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
Nuruzzaman ( Hampton University Group Meeting 1 st November 2011 Beamline Optics Using Beam Modulation for the Q-weak Experiment.
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Hovanes Egiyan Jefferson Lab. Main Hall B Beamline Components Beam Tuning Procedure HV System in Hall B Temperature Sensors Summary 10/19/ Hovanes.
Advisors Dr. Liguang Tang ( Dr. Dave Mack ( Nuruzzaman ( APS April Meeting.
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
1 Calorimeter in G4MICE Berkeley 10 Feb 2005 Rikard Sandström Geneva University.
March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
CLAS12 CalCom Activity: a progress report V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 meeting, June 14 th 2012.
The 1 st year of TMS operations Stéphane Bart Pedersen BE-BI-SW November 2011.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
Moller Polarimeter Q-weak: First direct measurement of the weak charge of the proton Nuruzzaman (
Elke Zimoch, EPICS Workshop 2004 Japan EPICS at the Protein Crystallography Beamlines of the SLS.
12 GeV MOLLER U PDATE TO THE H ALL A C OLLABORATION Juliette M. Mammei.
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
June 27, 2014 Nuruzzaman University of Oxford The Q-weak Beam Modulation System and Transverse Asymmetry in the N-to-Δ Transition.
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
A New, Robust Beam Modulation Strategy for the Q p weak Experiment Nuruzzaman ( Advisors: Dr. Dipangkar Dutta (
TOF Emittance Emittance measurements with the TOFs Mark Rayner 4 December 2008.
62cm 64cm. DAQ status and Plans DAQ –Timing tuning –Which tools to learn (SC, Event monitor, GPIO, MIDAS, DIP, laser, storage, analysis) Plan with beam.
Nuruzzaman ( Beam Modulation System for the Q-weak Experiment at Jefferson Lab.
Pb-Parity and Septum Update Presented by: Luis Mercado UMass - Amherst 12/05/2008 Thanks to Robert Michaels, Kent Pachke, Krishna Kumar, Dustin McNulty.
A New, Robust Beam Modulation Strategy for Hall-C and Hall-A Nuruzzaman ( Advisors: Dr. Dipangkar Dutta (
Youth, Family, and Contextual Characteristics Predicting Violence Exposure: Disruptive Behavior Disorder Symptoms as a Moderator Penny S. Loosier, Michael.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
"North American" Electronics
Luminosity Monitor Status
Status of the AGATA installation at GANIL
F.Guber, A.Ivashkin INR, Moscow
Hall A Compton Electron detector overview
Current Status of the T2K Experiment

Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
I Alexander Nass for the JEDI collaboration
Physics Interpretation of PREX
Particle ID Diagnostics in the MICE Beamline
Cooler e-source Magnetized Beam LDRD Progress Report
Experiment DAQ and trigger GMn SBS Collaboration Meeting
Rack installation and local tests for the MEBT Chopper Rack
Cooler e-source Magnetized Beam LDRD Progress Report
Presentation transcript:

Advisors Dr. Liguang Tang ( Dr. Dave Mack ( for the beam modulation team Nuruzzaman ( Collaboration Meeting 18 th September 2010

OPTIM SimulationHardware IssuesDiagnostics Analysis Future Plans 3

4

Beam Parameter Modulation Amplitude Current through 1 st Coil I 1 (A) Field Integrals for 1 st Coil BdL 1 (G-cm) Current through 2 nd Coil I 2 (A) Field Integrals for 2 nd Coil BdL 2 (G-cm) Tune Parameters (BdL 2 / BdL 1 ) X250 μm X΄4 μrad Y160 μm Y΄3μrad N.B: Assuming 1 A= 330 G-cm Calculation scaled to move beam by X= 250μm, X´= 4μrad, Y= 160 μm and Y´= 3μrad 5 OPTIM SimulationHardware IssuesDiagnostics Analysis Future Plans

Beamline Coils X1X1 Y1Y1 Y2Y2 X2X2 SRF E BSY Service Building BMOD1BMOD1 X1X1 X1X1 Y1Y1 Y1Y1 X2X2 X2X2 Y2Y2 Y2Y2 LEM Current Transducer X1X1 Y1Y1 Y2Y2 X2X2 TRIM-I Power Amp. BPMs BMOD2BMOD2 Hall-C GUI CONSOLE Q p weak PV Daq. Q p weak Cage I O C hCnmrhCnmr TRIUMF ADC JLAB ADC 6 OPTIM SimulationHardware IssuesDiagnostics Analysis Future Plans

0.015 V 1.65 G-cm = 7 OPTIM SimulationHardware IssuesDiagnostics Analysis Future Plans

X1X1 10 μm Target 2 nd Coil 1 st Coil -10 μm 2.5 μm IC Dump 8 OPTIM SimulationHardware IssuesDiagnostics Analysis Future Plans

9

10 Run # 5230 Raster: 2x2 Beam Current: 5 μA Target: OUT Main Detector: ON Mode: Single Coil Modulation Modulation Current: 0.06 A OPTIM SimulationHardware IssuesDiagnostics Analysis Future Plans Dedicated test runs for beam modulation taken during the summer are on 08/09/2010

11 OPTIM SimulationHardware IssuesDiagnostics Analysis Future Plans

12 FG X FG Y OPTIM SimulationHardware IssuesDiagnostics Analysis Future Plans

13 LEM X LEM Y OPTIM SimulationHardware IssuesDiagnostics Analysis Future Plans

14 3H09X 3H09Y OPTIM SimulationHardware IssuesDiagnostics Analysis Future Plans

15 +PMT -PMT OPTIM SimulationHardware IssuesDiagnostics Analysis Future Plans

16 (+PMT)+ (-PMT) OPTIM SimulationHardware IssuesDiagnostics Analysis Future Plans Target OUT

17 3H09X 3H09Y OPTIM SimulationHardware IssuesDiagnostics Analysis Future Plans Target OUT

Hardware connections were checked and verified several times. Necessary corrections are being modified in software. Do test runs after all the corrections (with beam and without beam). Analyze data and verify everything is working. Need 2-3 hours test with beam to achieve desired tune parameters to get pure position and angle at target. (assuming beam modulation hardware, software, BPMs are in working condition) Extract detector sensitivities. 18 OPTIM SimulationHardware IssuesDiagnostics Analysis Future Plans

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans 19

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans 20

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

Beamline Coils X1X1 Y1Y1 Y2Y2 X2X2 SRF E 22 BSY Service Building BMOD1BMOD1 X1X1 X1X1 Y1Y1 Y1Y1 X2X2 X2X2 Y2Y2 Y2Y2 LEM Current Transducer X1X1 Y1Y1 Y2Y2 X2X2 TRIM-I Power Amp. BPMs BMOD2BMOD2 Hall-C GUI CONSOLE Q p weak PV Daq. Q p weak Cage I O C hCnmrhCnmr TRIUMF ADC JLAB ADC Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

23 Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

24 Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

25 Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

26 Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

27 Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

28 Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans 3H09X 3H09Y

29 Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans

X1X1 X2X2 07A X Y 09B C 07B 07A 09B C 07B 07A Target cosθ sinθ cosθ -sinθ X Y 07C X E X´ Y Y´ i X E X´ Y Y´ T Y X 07A Y X 07C Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans 30

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans 31

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans 32

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans 33

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans 34

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans 35

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans 36

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans θ1θ1 θ2θ2 Z=0 Z=d 1 Z=d 2 Where z x / y Forward Beamline 37

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans  We are squeezing our function generators, etc, into a VME crate already in the BSY. We may be asked to upgrade the IOC in that crate. (All the hardware are installed for modulation)  Need to pull some cables from the BSY service building to our parity DAQ in the Q p weak cage (All the cables are pulled and connections are checked several times)  GUI need to be tested (Its working fine)  LEM rack under construction in Accelerator Division. (Constructed and installed) 38

Basics OPTIM Simulation Hardware Issues Diagnostics Analysis Future Plans 39

OPTIM SimulationHardware IssuesDiagnostics Analysis Future Plans 1 mm -1 mm 1 mm -1 mm 1 mm -1 mm 1 mm X X´ Y Y´ 40

1 mm -1 mm 1 mm -1 mm 1 mm -1 mm 1 mm X X´ Y Y´ 41 OPTIM SimulationHardware IssuesDiagnostics Analysis Future Plans