Chapter 6: Creating Robust Electrical System. What you will learn: Key element for building a reliable DC electrical system Design strategies for in-room.

Slides:



Advertisements
Similar presentations
Electricity Chapter 13.
Advertisements

CL100D series DSP controlled Uninterruptible power supplies.
SOME OF THE MOST COMMON TESTING MISTAKES MADE BY TECHNICIANS PERFORMING VERIFICATIONS TO CAN/ULC The reason I know some of them is because I have.
This presentation is intended to assist you in troubleshooting basic problems that can occur with hardware and software. NOTE: This presentation contains.
NetSure™ RDB Series.
Setup/Installation/Operation of an Environmental Control Unit (ECU)
Preparing for Power Outages Like any other part of the infrastructure, electrical power to the campus can fail, either as an isolated incident (e.g., tripped.
Mark Heggli Consultant to the World Bank Expert Real-time Hydrology Information Systems Workshop Module 4: Data Management Solutions for a Modernized HIS.
S Explain parallel circuits, components, and safety of house wiring. S Develop a formula for power consumption and solve related problems.
Technician License Course Chapter 9 Lesson Module 20: Electrical Safety.
Technician License Course Chapter 9 Lesson Module 20: Electrical Safety.
Maintaining and Troubleshooting Computer Systems Computer Technology.
Direct Current Circuits
DATA CENTERS INTRODUCTION Dr. Natheer Khasawneh. Goal… How Data Centers are critical environments for companies. Aspects of a Data Center's physical component.
Electrical Power Systems
Residential Wiring Facts
Electrical Fundamentals
During a mains supply interruption the entire protected network is dependent on the integrity of the UPS battery as a secondary source of energy. A potential.
Charging System Service
1 Lesson 3 Computer Protection Computer Literacy BASICS: A Comprehensive Guide to IC 3, 3 rd Edition Morrison / Wells.
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE PV APPLICATIONS CODES AND STANDARDS EMERGENCY RESPONSE.
8/10/20151 THE BASICS OF INFRATECH HEATER CONTROLS.
Chapter 7 SYSTEM PROTECTION
Data Center Construction Project Updates and Experiences Gary Stiehr May 6, 2008 HEPiX Spring 2008.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
By Carlin Bright. Electricity The flow of electrons in a conductor.
Chapter 18 Direct Current Circuits. Sources of emf The source that maintains the current in a closed circuit is called a source of emf Any devices that.
MAINTAINING AND TROUBLESHOOTING COMPUTER SYSTEMS UNIT 6.
Pages  In this PowerPoint, write down everything that is RED!!
HVACR116 – Trade Skills Mechanical Drawings.
To bring electric current into a building, an electrician installs wiring. In a house, all of the wires usually come from one main box.
LP Series 11/31T - Uninterruptible Power Supply Product Management GE Consumer & Industrial Power Protection.
Technician License Course Chapter 5 Amateur Radio Equipment Lesson Plan Module 12: Power Supplies and Batteries & RF Interference (RFI)
Two Minute Drill #8 Copyright 2005 Ted "Smitty" Smith Practice Code Look Up.
Chapter 18 Direct Current Circuits. Sources of emf The source that maintains the current in a closed circuit is called a source of emf The source that.
Technological World. Electrical Function An electrical function is the role that a component plays in the control or transformation of electric current.
7.1.3 Student Book © 2005 Propane Education & Research CouncilPage Applying a Systems Approach to Gas Appliance Troubleshooting Troubleshooting.
1 INTRUSION ALARM TECHNOLOGY POWER SUPPLIES. 2 INTRUSION ALARM TECHNOLOGY Security systems shall have a primary power source and a secondary power source.
1 Safety and Preventative Maintenance. 2 MB, One megabyte - MB or M-byte - represents about 1 million (10 6 ) bytes. Precisely, 1 MB = = 1 kB x 1 kB =
Grounding, bonding, and ground fault currents
1 Lesson 3 Computer Protection Computer Literacy BASICS: A Comprehensive Guide to IC 3, 3 rd Edition Morrison / Wells.
20.3 Electric Circuits
Practical Electricity. Recap…  5 important formulae: Q = Charge (Coulomb) I = Current (Ampere) t = time (second) V = Voltage or potential.
Cabling Project. Your first responsibility, as the network designer, will be to have your client specify, in writing, the desired outcome of the project.
Home Electrical Systems. Behavior Objectives  Define the basics of Electrical Systems  Explain the basic principles of Electricity.  Describe the different.
The 13 Amp PLUG Fuse Insulating Casing Live Wire Neutral Cable grip Flexible Copper conductors Earth.
Utility Engineers, PC.  Generation  Transmission  Distribution.
35 Electric Circuits Electrons flow from the negative part of the battery through the wire to the side (or bottom) of the bulb through the filament inside.
NERC Lessons Learned Summary LLs Published in September 2015.
ELECTRICAL SYSTEMS. Chapter Twenty One: Electrical Systems  21.1 Series Circuits  21.2 Parallel Circuits  21.3 Electrical Power.
OCCUPATIONAL HEALTH AND SAFETY STANDARDS
SERVICE ENTRANCE EQUIPMENT
Copyright© 2005 Avaya Inc. All rights reserved Avaya UPS Training powerware.com/avaya.
HOUSE WIRING Final Review. Electricity Electricity = flow of electrons Conductor= electricity passes thru easily - Metal, water, person Insulator = restricts.
HOUSE WIRING NOTES. Electricity  Proton – positive charge  Electron – Negative charge  Electricity = flow of electrons Conductor= electricity passes.
Residential Wiring Unit 3 – Installation and Planning.
Series and Parallel Circuits
ELECTRICAL INSTRUMENTS ( service and utilization )
Electrifying! Ken McAuliffe Chapter 30. Summary Ken McAuliffe Explains the complexities of wiring a large building for electricity. Describes how electrical.
Data Management Solutions for a Modernized HIS
V7 UPS Sales Training.
PowerValue 11/31 T Sales Presentation
Personal Protective Equipment
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
“Ladder” Diagrams Chapter 6 - Ladder Logic LADDER DIAGRAMS ARE SPECIALIZED SCHEMATICS COMMONLY USED TO DOCUMENT INDUSTRIAL CONTROL LOGIC SYSTEMS.
Calculations: Transformers and Service Conductor Calculations
Overcurrent Protection— Fuses and Circuit Breakers
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
1.11: Robot Controller.
Electrical components and systems
Presentation transcript:

Chapter 6: Creating Robust Electrical System

What you will learn: Key element for building a reliable DC electrical system Design strategies for in-room and standby electrical infrastructure Best practice for labeling and system monitoring End-to-end testing procedures

Recommended Electrical system Features The system should be dependable and ensure the continuous running for DC components (servers, networking devices,…etc) Electrical system should be studied and planed carefully System features that need to be included in the design:

System features to avert unnecessary downtime. Isolated Power Avoiding Single Points of Failure Maintenance Bypass Options Remote Infrastructure Management

Recommended Electrical system Features (Cont.) Isolated Power – Different power source for DC equipments than other electrical devices in the building Avoiding single point of failure 1.provide standby power system 2.redundancy for critical devices and functions 3.physical separation for key systems 4.don’t share circuit breakers 5.plan for additional electrical power in the future

Recommended Electrical system Features (Cont.) Maintenance Bypass Options Design the system so that regular maintenance can be performed without the taking major components offline Remote Infrastructure Management Consider computer based building management system for mid and large size DC benefits of such systems would include 1.Early warning of problems 2.Savings in terms of staff and running costs Chosen system should provide high interoperability, easy to program, graphic interface and produce useful data metrics

In-Room Power Electrical infrastructure elements include: 1.Power distribution units 2.Circuit breaker panels 3.Electrical conduits 4.Wiring configurations Choose how to terminate, route and label the components Pre power cabinet locations with power receptacles

In-Room Power (Cont.) Determining Power Requirements: Electrical infrastructure should support the room with its full capacity (completely full with servers) The more information about incoming DC equipments the more accurate calculations for electrical needs Provide abundant number of circuits Basic formula for the maximum power needed: max kva =(volts * amps)/1000 example: for a DC with 50 cabinet locations each with two power strip (120 volts & 20 amps)

In-Room Power (Cont.) Power Distribution: Run flexible electrical conduits(whips) from large power distribution units(PDU) directly to each cabinets for small DC Use segmented power for large server environment (running electrical conduits from PDUs to circuit panels at the end of each row and then a subset of connections to server cabinet locations). This option would be easier to manage, less expensive more resistant to physical accidents Power Redundancy: Require for redundant power supply for each server and network equipment and plug each one into different receptacle

In-Room Power (Cont.) Figure 6-3. Direct-Connect Power Figure 6-4. Distributed (segmented)Power

In-Room Power (Cont.) Wiring, components &termination options: Be familiar with local power requirements (220/240 volts vs. 100/127 volts) and predominant power requirements for incoming equipments Good design practice: 1.Use flexible whips (easier to install, less expensive, rearranged quickly) 2.Use heavy gauge of wire (the lower the gauge the thicker the wire) 3.Don’t terminate more than one receptacle on a conduit 4.Avoid dirty power

In-Room Power (Cont.) Labeling & Documentation: Use thorough and unambiguous signage, labeling and documentations that is understandable by everyone Label power receptacles with the circuits they possess and the location in the circuit breaker panel where they originate. At that breaker panel, list all of the circuits it contains and which cabinet locations they are located at Use color-code to indicate parallel infrastructure Create a blue print of the room during construction (as-built) and keep it updated Mark electrical equipments that users need to stay away from it with hazard tapes

In-Room Power (Cont.) Convenience Outlets: Install convenience electrical outlets in multiple locations to be used instead of cabinet power outlets for rechargeable batteries, power drill, vacuum cleaner, …etc. Don’t connect these outlets to the standby power system Emergency Power Off (EPO) Required by fire codes in many countries Intended to prevent fire suppression materials from coming into contact with live electrical current EPO types: 1.Push-up button (easy to use, most common EPO controls) 2.Pop-up button (second frequently used, require a new piece of glass to restore power, accidental activation is less likely) 3.Control Knob (require the knob to be rotated 90 degrees to activate, better design, simple to use, accidental activation is less likely) It is highly recommended to cover EPO controls with a transparent plastic shell, wired to an audio alarm.

In-Room Power (Cont.) Figure 6-6. Sample Emergency Power Off Controls

Standby Power Aimed to keep servers & network devices running when main powers fails 3 factors for designing standby system 1.Redundancy (the more level of redundancy the more complex and expensive the system would be) 2.Simplicity 3.Cost Load requirements (start with max. kva load the room can produce and then adjust in 2 ways: 1.Size the standby infrastructure to handle 110 to 120 percent of the projected maximum power needs 2.Build out your standby infrastructure based upon what level of redundancy you want for your server environment Design the standby system to handle both network & server rooms if they are close to each other, otherwise, have separate standby infrastructure if the network room is far from the servers room

Standby Power (Cont.) Batteries: UPS is considered the most common source of standby power Use one UPS for each cabinet for small server environment or temporary DC as they are portable and inexpensive large floor-standing UPS model installed in the electrical room are used for all other size of DC as they are more robust, have greater capacity Run time term is used to identify how long standby infrastructure can support DC electrical load Required run time should be built on the assumption that the room is fully loaded

Standby Power (Cont.) Generators: Size the generator to support at least 10 percent more than DC maximum power capacity Skip installing generators in small server environment with reliable utility power and invest more in installing UPS that has 2 hrs of run time It is recommended to have generators that can run for 8 hrs before refueling Use enclosed protected area to install generators with short distance from DC 1.Protect against unauthorized employees 2.Protect against noise and vibration A good ventilation and enough space around the unite is required

Standby Power (Cont.) Monitoring Lights: Install monitoring lights high up on the both side of the wall inside (DC entrance, end of DC major aisles), outside and other strategic locations in the DC to indicate standby system activation Use different color demes for UPS and generators (avoid amber or white as they are used for fire alarms) Using large rotating beacon-style lights are recommended Installing monitoring lights outside the DC with an explanation signage with emergency phone number would help non DC users to report such incident

Standby Power (Cont.) Figure 6-7 Monitoring Lights for the Standby Power System

Labeling and Documenting Make the labeling consistent with the servers room as possible (using the same terms and labeling schemes) Maintain a wiring diagram and keep it current No common standards for orienting electrical switches, on common and simple practice is to mark on position for all circuits and switches

Installation and Grounding Installing of grounding system help protecting electrical infrastructure and people from excess electrical charges (generated by faulty circuits, static dischargers, or lightening strike) Grounding system usually involves copper wires connected to the building steel and linked to copper rod deep in the ground (moist soil) Install a second grounding system “Single Reference Grid” to provide more protection to servers and network devices from interference, it should be connected to each power distribution unite and air handler

Testing and Verification The contractor must perform a series of tests before any servers/devices are installed in the DC to make sure that the infrastructure work as it should be Area of testing 1.Load bank test (make sure that both UPS and generator can support the level of power as designed, the goal is to check the max. capacity and runtime of the UPS) 2.Injection test (injecting electrical current through circuit breakers to ensure that they perform correctly during a real life power spike) 3.Circuit & labeling verification (at least for the main breakers and recommended for all circuits) 4.Full power test (cutting DC utility power to verify transferring of electrical load to standby infrastructure and back again) 5.EPO system test (activating EPO controls to ensure that all power sources and outlets shutdown properly)

Testing and Verification (Cont.) Table 6-1. Typical Load Bank Test

Testing and Verification (Cont.) Table 6-2. Typical Full Power Test and EPO Check

Common Problems Power receptacles or circuit breakers are mislabeled (obtain a power tester and have two people verify all receptacles in the room) Monitoring lights for standby power are wired incorrectly (having monitoring lights configured to engage after 30-second which may result in no one will see UPS monitoring lights activation) Circuit breakers are left off (this may confuse people, they may think serious problem exists)