Mainframe Replication and Disaster Recovery Services.

Slides:



Advertisements
Similar presentations
Business Continuity Technology Peter Lesser (212) Peter Lesser (212) Kraft Kennedy & Lesser, Inc. 360 Lexington.
Advertisements

Distributed Data Processing
Introducing FailSafeSolutions Online Backup Software.
© 2014 Vicom Infinity Storage System High-Availability & Disaster Recovery Overview [638] John Wolfgang Enterprise Storage Architecture & Services
STANFORD UNIVERSITY INFORMATION TECHNOLOGY SERVICES IT Services Storage And Backup Low Cost Central Storage (LCCS) January 9,
MUNIS Platform Migration Project WELCOME. Agenda Introductions Tyler Cloud Overview Munis New Features Questions.
Skyward Disaster Recovery Options
Centres of excellence and first choice for healthcare providers Digital Archival Program Neville Pinto Team Leader - Server & Storage Services.
Backup and Disaster Recovery (BDR) A LOGICAL Alternative to costly Hosted BDR ELLEGENT SYSTEMS, Inc.
1 Disaster Recovery “Protecting City Data” Ron Bergman First Deputy Commissioner Gregory Neuhaus Assistant Commissioner THE CITY OF NEW YORK.
Presentation Cosmos Business Systems & IBM Hellas.
June 23rd, 2009Inflectra Proprietary InformationPage: 1 SpiraTest/Plan/Team Deployment Considerations How to deploy for high-availability and strategies.
Barracuda Backup Service Data Backup and Disaster Recovery.
1 © Copyright 2010 EMC Corporation. All rights reserved. EMC RecoverPoint/Cluster Enabler for Microsoft Failover Cluster.
Keith Burns Microsoft UK Mission Critical Database.
1© Copyright 2014 EMC Corporation. All rights reserved. CUSTOMER REFERENCES.
1© Copyright 2011 EMC Corporation. All rights reserved. EMC RECOVERPOINT/ CLUSTER ENABLER FOR MICROSOFT FAILOVER CLUSTER.
Module 5 Understanding SQL Server 2008 R2 Recovery Models.
1 Disaster Recovery Planning & Cross-Border Backup of Data among AMEDA Members Vipin Mahabirsingh Managing Director, CDS Mauritius For Workgroup on Cross-Border.
Copyright © 2006, SAS Institute Inc. All rights reserved. Data at its Best How to keep large data volumes in order and ensure high quality ? Milen Georgiev.
Disaster RTO SLAYearlyMonthly 99%3.65 days7.20 hours 99.5%1.83 days3.60 hours 99.9%8.76 hours43.8 minutes 99.95%4.38 hours21.56.
BACKUP/MASTER: Immediate Relief with Disk Backup Presented by W. Curtis Preston VP, Service Development GlassHouse Technologies, Inc.
IBM TotalStorage ® IBM logo must not be moved, added to, or altered in any way. © 2007 IBM Corporation Break through with IBM TotalStorage Business Continuity.
Module 8: Designing Active Directory Disaster Recovery in Windows Server 2008.
November 2009 Network Disaster Recovery October 2014.
DTS Disaster Recovery Service Fact and Fallacy By Marianne Chick, CBCP DTS Disaster Recovery Planner.
Disaster Recovery as a Cloud Service Chao Liu SUNY Buffalo Computer Science.
Business Continuity and Disaster Recovery Chapter 8 Part 2 Pages 914 to 945.
Chapter 11: Designing a Data Recovery Solution for a Database MCITP Administrator: Microsoft SQL Server 2005 Database Server Infrastructure Design Study.
1 EMC CONFIDENTIAL—INTERNAL USE ONLY EMC’s End-to-End Capabilities for Microsoft EMC helps you successfully plan, design, deploy and manage your Microsoft.
DotHill Systems Data Management Services. Page 2 Agenda Why protect your data?  Causes of data loss  Hardware data protection  DMS data protection.
Chapter 8 Implementing Disaster Recovery and High Availability Hands-On Virtual Computing.
David N. Wozei Systems Administrator, IT Auditor.
Meeting the Data Protection Demands of a 24x7 Economy Steve Morihiro VP, Programs & Technology Quantum Storage Solutions Group
NOAA WEBShop A low-cost standby system for an OAR-wide budgeting application Eugene F. Burger (NOAA/PMEL/JISAO) NOAA WebShop July Philadelphia.
Hadoop Hardware Infrastructure considerations ©2013 OpalSoft Big Data.
Co-location Sites for Business Continuity and Disaster Recovery Peter Lesser (212) Peter Lesser (212) Kraft.
By Srosh Abdali.  Disaster recovery is the process, policies and procedures related to preparing for recovery or continuation of technology infrastructure.
Data Center Back-up: Data Sustainability on a Budget Mike DeNapoli Enterprise Systems Engineer Double-Take Software.
Click to add text Introduction to the new mainframe: Large-Scale Commercial Computing © Copyright IBM Corp., All rights reserved. Chapter 4: Integrity.
Preventing Common Causes of loss. Common Causes of Loss of Data Accidental Erasure – close a file and don’t save it, – write over the original file when.
High Availability in DB2 Nishant Sinha
ENTERPRISE TIER 1 SAN STORAGE UPGRADE March 2014.
Microsoft and Symantec
Disaster Recovery: Can Your Business Survive Data Loss? DR Strategies for Today and Tomorrow.
Luminex Virtual Tape Storage System Brian Sullivan Director of Computer Operations Broward County Public Schools 1.
Data Disaster Recovery Planning Greg Fibiger 1/7/2016.
Disaster Recovery. Refer to the process,policy and procedure related to recovery or continuation of technology infrastructure critical to an organization.
Practical IT Research that Drives Measurable Results Leverage Server Virtualization for DR Affordability and Agility 1Info-Tech Research Group.
DISASTER RECOVERY PLAN By: Matthew Morrow. WHAT HAPPENS WHEN A DISASTER OCCURS  What happens to a business during a disaster?  What steps does a business.
U N C L A S S I F I E D LA-UR Leveraging VMware to implement Disaster Recovery at LANL Anil Karmel Technical Staff Member
Clint Kunz Data Platform Technology Specialist
Disaster Recovery Prepared by Mark Lomas Mark Lomas IT Infrastructure Consultant Storage & Servers.
BACKUP AND RESTORE. The main area to be consider when designing a backup strategy Which information should be backed up Which technology should be backed.
Enterprise Vitrualization by Ernest de León. Brief Overview.
Networking Objectives Understand what the following policies will contain – Disaster recovery – Backup – Archiving – Acceptable use – failover.
Database recovery contd…
Planning for Application Recovery
Integrating Disk into Backup for Faster Restores
Delivering Modern Data Management
Server Upgrade HA/DR Integration
Data Center Infrastructure
DTS Disaster Recovery Service Fact and Fallacy
MUNIS Platform Migration Project
Introduction to System Administration
Introduction to System Administration
What Do We Do? Managed IT services
Disaster Recovery Services
Business Continuity Technology
SpiraTest/Plan/Team Deployment Considerations
Presentation transcript:

Mainframe Replication and Disaster Recovery Services

Problem Statement: The GPAA has its own mainframe in one of our Data Centers. The CIVPEN (NATURAL/ADABAS), the core business application is hosted on the mainframe (Since 1992). The CIVPEN application comprise of two production Adabas Databases (Active Records) (History (Read only) records and growing) Other critical business applications are tightly integrated with the CIVPEN (Civil Pensions) application. Integration is primarily via COMPLETE’s HTTP Server. Towards Excellence2

Mainframe Replication and Disaster Recovery Services Problem Statement (cont): The GPAA does not have a DR facility with dedicated infrastructure for the mainframe (Used a Syndicated environment) In case of a disaster the recovery of the mainframe and application takes anything from 12 to hours (Tape based) - Current RPO = 1 hour – Business expected RPO – Not achievable. During the recovery time most of the other business applications are also unavailable due to the tight integration. This is not acceptable to our business and clients and need to be addressed. Towards Excellence3

Mainframe Replication and Disaster Recovery Services Objectives: Reduce the RTO and RPO to as minimal possible by employing new techniques and technology Move to a position where we have a ‘Hot Standby’ solution reducing the RPO significantly – to be in line with the other applications (minimal data loss and cross application data integrity problems ). There are various ways to replicate the data between the active and the warm standby platform but we will leave this to the innovation of the respondents. Move away from the recovery from Cassettes. The GPAA is in a modernisation phase where one of the objectives is to migrate the mainframe to a more modern Software Platform. Towards Excellence4

Mainframe Replication and Disaster Recovery Services Challenges and Points to note: The PLOGS/Archive logs are not switched on, on the History Database. The PLOGs/Archive logs are also not switched on, on the active database when we process our monthly Payment and Contribution Reconciliation runs. This is due to the volume of the transactions and the PLOGS that will be created. We protect ourselves by means of full backups before and after the respective runs (twice per month over weekends). Archiving of data from the Active database to the History database is done once a month (at least) and because the Archive database is Read Only we archive on a file mechanism rather than on a Record mechanism using Adabas utilities. During a DR or a DR test the GPAA’s mainframe support staff will operate the mainframe/LPAR dedicated to the GPAA at the Service Provider’s Data Centre. The GPAA will conduct regular verifications to ensure that the data on the two systems are fully in synch. Towards Excellence5

Mainframe Replication and Disaster Recovery Services Technical Information about Our Mainframe: IBM zBC12 Machine type: 2828 I02 Hardware model: H06 Capacity setting: I MIPS total, 150MIPS UP, 34MSU User memory: 16GB FICON (disk,CTC+tape)channels: 12*8GB/s MM Storage IBM DS8870 Towards Excellence6

Mainframe Replication and Disaster Recovery Services Technical Information about Our Mainframe (Cont): 3.6TB DASD storage dedicated disk storage for replication 140 MIPS (in case of Test or invocation). The full 140 MIPS should only be active in the case of a test or a real disaster. During the replication the MIPS utilization should be limited to the maximum capacity that will be required for the replication. The service provider to propose how many MIPS will be required for the replication. ZOS 2.1 capable operating system tape drives for bulk data restores and for backups Towards Excellence7

Mainframe Replication and Disaster Recovery Services Questions Towards Excellence8