LFR plant assessment against a Fukushima-like scenario Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European.

Slides:



Advertisements
Similar presentations
NuScales Passive Safety Approach Update September 2011 Contact Information: Bruce Landrey Chief Marketing Officer Dr. Jose N.
Advertisements

Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
Assessing the Challenges Resulting from the Events at Fukushima Daiichi Nuclear Power Station A Preliminary Discussion March 25, 2011 Walter L. Kirchner.
Safety Implications of the Fukushima Nuclear Accident Sheldon L. Trubatch, Ph.D., J.D. Vice-Chairman Arizona Section American Nuclear Society.
LEADER Project: Task 5.4 Analysis of Representative DBC Events of the ETDR with RELAP5 G. Bandini - ENEA/Bologna LEADER 5 th WP5 Meeting JRC-IET, Petten,
1 ACPR Advanced, cost competitive, proven technology, and reliable The Third Generation Nuclear Reactor.
ACADs (08-006) Covered Keywords Components, functions, operation, Auxiliary feedwater, Startup, hot standby, plant cooldown, emergency. Description Supporting.
Overview of Incident at Fukushima Daiich Nuclear Power Station (1F) (Informal personal observations) April 2011.
EUROTRANS: WP1.5 Technical meeting, Karlsruhe, November 27 – 28, XT-ADS DHR Conceptual Design L. Mansani
Safety Features at KKNPP Insight of. Location: The Kudankulam is located on the coast of the Gulf of Mannar, at 25 kM to the north- east from Kanyakumari,in.
EUROTRANS - Helium cooled EFIT Probabilistic assessment of different DHR designs Karlsruhe, November Sophie EHSTER, Laurent VINCON.
Sea Fukushima Dai-Ichi: Status before the Earthquake Units 1, 2, and 3 operate at full power. Steam produced by water boiling in the reactor vessel flows.
Source: NRC Flickr Gallery, Courtesy Entergy Nuclear UCS Backgrounder on Pilgrim’s January 27, 2015 Event February 3,
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
Fukushima Incident Preliminary Analysis, Consequences and Safety Status of Indian NPPs Part-1 Dr. S.K.Jain Chairman & Managing Director NPCIL & BHAVINI.
EuropeAid/131555/C/SER/RS Safety Procedures in the Chemical Industry Ernst SIMON, Styrian Regional Government, Austria Belgrade, December 2013.
SAFETY OBJECTIVES FOR GENERATION III NPP APPLIED TO EPR DESIGN OPTIONS PRESENTATION 26 – 29 September 2010, Nesebar, Bulgaria WATTELLE Emmanuel IRSN, France.
RISK ENGINEERING, Ltd. Reliability – Safety - Management Engineering Services - Software Development 10, Vihren str., 1618 Sofia, Pavlovo, Bulgaria, phone.
DECEMBER 2010 ISTOG MEETING NEW Q & A CARD DISCUSSION.
ACADs (08-006) Covered Keywords Containment Isolation, actuation logic, Description Supporting Material
Outcome of the EU Nuclear Safety Stress Tests Andrej Stritar Chairman, ENSREG.
What about Japan?. Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6.
LEADER/ELECTRA Safety Workshop: Petten February 2013 IRSN presentation on its document “ Overview of Generation IV (Gen-IV) reactor designs Safety.
1 BREI Conducted Comprehensive Independent Reviews of Passive Heat Removal Systems with Ejectors-Condensers Euratom DEEPSSI Project for the design and.
LEADER WP3 Conceptual Design Status KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, Luigi Mansani
ALFRED System Configuration Luigi Mansani
Nuclear Thermal Hydraulic System Experiment
ALFRED and ELFR design overview Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European LFR Industrial Plant.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
Fukushima Lessons Learnt and Follow-up Activities of Rostechnadzor Alexey Ferapontov, Acting Chairman Second European Nuclear Safety Conference
March 11, 2011 to Present. Presentation Overview Reactor Design and FeaturesChronology of EventsCurrent Status of Each ReactorRecovery Actions Kashiwazaki-Kariwa.
LEADER Project Analysis of Representative DBC Events of the ETDR with RELAP5 and CATHARE Giacomino Bandini - ENEA/Bologna Genevieve Geffraye – CEA/Grenoble.
LEADER WP3 Conceptual Design Status KIT Campus North, Karlsruhe, Luigi Mansani
Page 1 Petten 27 – Feb ALFRED and ELFR Secondary System and Plant Layout.
Analysis of Representative DEC Events of the ETDR with RELAP5 LEADER Project: Task 5.5 G. Bandini - ENEA/Bologna LEADER 5 th WP5 Meeting JRC-IET, Petten,
Agenda Background Update on Fukushima Daini Update on Fukushima Dai-ichi – Summary of Events at Fukushima Dai-ichi Summary of Radiation and Reports.
LEADER achievements and next steps 4 th GB MEETING of the LEADER project Genova May 10 th 2013 Alessandro Alemberti
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Defence in Depth Safety Culture Lecturer.
Low Power and Shutdown PSA IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
IAEA International Atomic Energy Agency Occupational Radiation Protection during High Exposure Operations Lecture 2-2 Lessons Learnt from Occupational.
THE FUKUSHIMA NUCLEAR ACCIDENT ON THE TECHNOLOGY DEVELOPMENT OF NEW NUCLEAR POWER PLANTS 1.IRSHAD NURHAKIM BIN NORAHIM (ME088151) 2.LEE SZE TENG (ME087909)
MEHB 513 Introduction on nuclear technology assignment GROUP MEMBERS:ID: SEEH CHONG CHIN ME YEE QIAN WAHME TING DING PINGME LIM JIA YINGME
I Overview of EU-APR1400 II Design Concept of Safety Systems III
1 Nuclear Power Technology Development Westinghouse View Kiev March 2012 Dr. Nick Shulyak AP1000® is a registered trademark in the United States of Westinghouse.
Enhancing Safety at America’s Nuclear Energy Facilities U.S. Industry’s Fukushima Response Joseph Pollock, Nuclear Energy Institute Christopher H. Mudrick,
MI Shielding Machine Protection Credit D. Capista March 7,2010.
Plant & Reactor Design Passive Reactor Core Cooling System
Enhancing Safety at America’s Nuclear Energy Facilities U.S. Industry’s Fukushima Response Joseph Pollock, Nuclear Energy Institute Christopher H. Mudrick,
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Benefits and limitations of RIDM by Géza.
FLEX Mitigation Strategies Overview (Rec 4.2) Fukushima Regulatory Response Workshop April 5, 2012.
Version 1.0, May 2015 SHORT COURSE BASIC PROFESSIONAL TRAINING COURSE Module V Safety classification of structures, systems and components This material.
Japanese Nuclear Accident And U.S. Response April 20, 2011.
Generator Operation. Video of Generator synchronizing.
DCPP Performance Based on NRC Performance Indicators
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
Pressurized Water Reactor
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions
Fukushima Lessons Learned
Grid Stability and Safety Issues Associated With Nuclear Power Plants
Session Name: Lessons Learned from Mega Projects
Severe accident management at Paks NPP
Summary of the Earthquake and Situation of the Kashiwazaki-Kariwa NPP
IAEA International Conference on Topical Issues in Nuclear Installation Safety, 6-9 June, 2017 Investigation of performance of Passive heat removal system.
BASIC PROFESSIONAL TRAINING COURSE Module VII Probabilistic Safety Assessment Case Studies Version 1.0, July 2015 This material was prepared.
Japanese Nuclear Accident And U.S. Response
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
New Regulatory Requirements in Japan
Presentation transcript:

LFR plant assessment against a Fukushima-like scenario Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European LFR Industrial Plant (ELFR), and European Lead Cooled Training Reactor (ELECTRA) Joint Research Centre, Institute for Energy and Transport, Petten, the Netherlands, 27–28 February 2013 Luigi Mansani

Technical Workshop; Joint Research Centre, Petten, the Netherlands, 27–28 February 2013 Definition of a Fukushima-like scenario  Seismic event Fukushima Peak Ground  0.52g  Tsunami 30 min after seismic events* Assumed peak tsunami height of 9.0 m Sustained flood level ≤ 5.2 m Water steadily recedes over 5 hours * Fukushima was impacted by the tsunami 56 minutes after the initial seismic event.

Technical Workshop; Joint Research Centre, Petten, the Netherlands, 27–28 February 2013 Seismic Design Basis and Seismic Margins LFR designed for a Safe Shutdown Earthquake (SSE) of 0.3g (as requested by EUR) 2D seismic isolators under the primary building adopted (application to LFR System is on going in SILER project) All equipment required to mitigate accident for first 72 hours located within the Primary Building A Seismic Margin Assessment (SMA) will be performed to evaluate, for each relevant System Structure and Component (SSC), sequence-level High Confidence, Low Probability of Failures (HCLPFs) This analysis has been already performed for GEN III plants (AP1000, EPR), showing that the SSCs required for safe shutdown have a HCLPF > 0.50g

Technical Workshop; Joint Research Centre, Petten, the Netherlands, 27–28 February 2013 Flooding Design Basis and Margins  LFR designed for a probable maximum flood level up to site grade elevation  flooding not exceeding plant grade would not affect safe shutdown components  In case of extreme events with flood greatly exceeding the basis: Containment would remain unaffected  core protected 24-hour & 72-Hour Safety-Related Batteries will be located in the Auxiliary Building at elevation above the plant grad with watertight doors  1E DC actuation power and 1E DC display power available Even with a postulated loss of all AC and DC power, fail-safe nature of passive safety features results in their automatic actuation for decay heat removal

Technical Workshop; Joint Research Centre, Petten, the Netherlands, 27–28 February 2013 Effect of Seismic Event  Impact on Structures and Components All major site buildings remain structurally intact 1E electrical / I&C equipment remains functional Passive safety equipment remains functional  Immediate Effects Loss of Offsite Power: Switchyard/Transmission Failures Trip of Main Turbine/Generator: High Vibration Conservatively assumed All active systems fail Standby Diesel Generators fail to start ( not necessary for safety systems and accident mitigation)

Technical Workshop; Joint Research Centre, Petten, the Netherlands, 27–28 February 2013 Tsunami Effect  Containment Area  unaffected  Radwaste, Auxiliary, Turbine, Annex, and Diesel Buildings Elevations below grade completely inundated External tanks (water and fuel oil) not available Standby Diesel Generators inoperable

Technical Workshop; Joint Research Centre, Petten, the Netherlands, 27–28 February 2013 Accident Mitigation  Reactor tripped Due to LOOP, the coupling electromagnet is switch off and the absorber assemblies are free to rise up  Decay heat removal DHR (Isolation Condenser) would be actuated by PMS DC power for valves actuation provided by the Class 1E batteries If the valves are not yet actuated before tsunami, the Air Operated Valves “fail open” on loss of DC power Short ‐ Term  prior to Tsunami (0 ‐ 30 minutes) After Tsunami  Operation of DHR not impacted by the flood for 72 hours

Technical Workshop; Joint Research Centre, Petten, the Netherlands, 27–28 February 2013 Accident Mitigation  Long-Term Shutdown (Post-72 Hours Operation) Supplemental resources required at 72 hours from prearranged sources, connected to built-in hook-ups Small portable AC power units for ancillary loads only, to power portable pumps and PAMS I&C Fire trucks or portable pumps, used to transfer water to Isolation Condenser tanks Alternate water sources available at plant: Misc water tanks; dirty water / sea water permissible

Technical Workshop; Joint Research Centre, Petten, the Netherlands, 27–28 February 2013 Ultimate Mitigation Measures  In the very unlikely scenario leading to the loss of all heat sinks with unavailability of both DHR systems, the heat can be extracted injecting water in the reactor cavity, between the reactor and safety vessels  In case of reactor vessel breach, the decay heat can still be removed by the same system that cools the concrete of cavity walls  Such very ultimate provisions are possible because Lead is chemically inert with air and water so that fire fighters or dedicated rescue troops can flood the reactor with water

Technical Workshop; Joint Research Centre, Petten, the Netherlands, 27–28 February 2013 ALFRED Thank you for your attention