DBCP Technical Workshop 2004 Data Acquisition and Telemetry Systems 1 METOCEAN Data Systems SVP B Model Improvements By Bernie Petolas, P. Eng. METOCEAN.

Slides:



Advertisements
Similar presentations
DBCP Workshop, Chennai October 2004 David Meldrum and Duncan Mercer Scottish Association for Marine Science Further refinements in the use.
Advertisements

What is FastLane? What is the MEP program? How it can benefit you? Where do solutions come from? How can you get started?
Presented by: Mayra Pazos And Erik Valdes Drifter Data Assembly Center NOAA/AOML Collaborators: Rick Lumpkin and Shaun Dolk DBCP XXV – Paris, France, 28.
Atlantic Demonstration Buoys: Preliminary Results by: Rick Lumpkin, Mayra Pazos, Craig Engler Presentation by: Craig Engler & Mayra Pazos National Oceanic.
1 AO Milan 40MM Manufacturing Support Capabilities J. Fine & J. Solgaard January 28, 2004.
Magnetic Bearing Preliminary Design Review Team miniMuffin Lauren Glogiewicz Jacob Beckner Kevin Bodkin James Holley Philip Terry.
Data Buoy Cooperation Panel Hester Viola
CSP: Commercials Service for Palm Zachi Sharvit, Elad Eldor PostPC [2003/2004]
PURSUE Project PP S Enhancement of the EECE Introductory Laboratories Through LabVIEW Data Acquisition System Presented by Michael J. Elyea.
FIRST Robotics A view from the Systems Engineering Perspective Chris Mikus January 2, 2006 Rev 0.2.
Presentation to Data Buoy Cooperation Panel XVII J-CAD (JAMSTEC Compact Arctic Drifter)
Iridium WOCE/SVP/BP Buoy METOCEAN WOCE/SVP/BP/Iridium By Bernie Petolas, P. Eng. Product Manager METOCEAN Data Systems Ltd. Dartmouth NS B3B 1R9 Canada.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Recruitment Info Session January 26 th, Agenda 2 The Team Our Goal Technical Organization Timeline Recruiting and Expectations.
Workshop A Performance Boosting Tools Reality Check: Are you a Lean, Mean Manufacturing Machine ? The Matrix: Performance Measurement System.
A Comparative Analysis of SE to LSS (Lean Six Sigma) William “Bill” Fournier 15 May, 2012.
Environment Canada Participant Report for IABP-18 Toulouse, June 2008 Edward Hudson Arctic Meteorologist: International Polar Year and Marine.
Lean Manufacturing & its relevance to onshore bottling from a contract bottling perspective.
© Copyright 2010 Dresser-Rand Gasket Cell Relocation [Revision: May, 2011] Team Members: Cody Willmart, Aaron Marcotte, Jacky Li, Daniel Swol, Tyler Borden.
Makes it possible for customers to; Focus on their core activities Expand through flexible production capacity Reduce their total cost Release tied-up.
NDIA Software Committee Paul R. Croll, CSC Michael H. McLendon, OSD/DDR&E/SE NDIA Systems Engineering Division Meeting August 18, 2010.
Vermont ASQ Meeting March 24, 2005 Jeffrey S. Solomon General Dynamics Burlington, VT Kaizen: Focused, Fast Team Improvement.
Copyright © 2014 Acuity Institute LLC. All rights reserved. Acuity Institute Lean Professional for Service Acuity Institute Overview Lean Professional.
Agenda Week 1 Define Day 1 Introductions & Agenda LSS Overview
SVP-Barometer Drifter Performance Jeffrey Wingenroth VP and General Manager Technocean, Inc. Cape Coral, Florida USA
Lean Manufacturing Chapter 15 pp June 29, 2012.
Introduction to Competency Frameworks
The DBCP – GHRSST Pilot Project: an update How to make a silk purse out of a sow’s ear (How to make good wine out of bad wine) David Meldrum
King Mongkut’s University of Technology Thonburi
Drifting Buoy Update: WOTAN and Iridium
New developments to progress Smart Buoy Idea Motyzhev S.*, Horton E.**, Lunev E.*,Kirichenko A.*,Tolstosheev A.*,Yachmenev V.* * Marine Hydrophysical Institute.
Chapter 16: Product Design and Manufacturing
Data Buoy Cooperation Panel Hester Viola
AVAPS II DROPSONDE Overview
Capacity of HRSST-2 buoys to measure SST with a high degree of accuracy Pierre Blouch E-SURFMAR Operational Service Manager.
WP3 – Task 3.6 Surface drifters Author: Pierre Blouch (EUMETNET) Date: 10 th June 2015 Version:1.0.
Kerstin Forrester, President May 25, IMPROVEMENT EFFORTS Pathways participants – Lean Manufacturing –Sponsored by ONR, BIW, MEP Assessed all facets.
Portable Rechargeable Output Power Supply (PROPS) Final Presentation April 24, 2008.
Optimization of Wind and Storage Dispatch for Enhanced Market Opportunities Kwami Senam Sedzro Ph.D. Student, Electrical Engineering Lehigh University.
Scrumm meeting. Mechanical Done. Tire vs belt? Tire chosen. What to do? Do a prototype of a car. Continue with design.
1 © 2004 Superfactory™. All Rights Reserved. Lean Manufacturing Overview Superfactory Excellence Program™
1 Lean Manufacturing Overview Lean Manufacturing Overview
Lean Solutions © Fujitsu Canada Lean Solutions © Fujitsu Canada Exclusive Proposal Revision March 12, 2010 Exclusive Proposal EO9007 – Measurement and.
Scrumm meeting. Mechanical Done. Work on RFID attachments Started designing top Working on encoders What to do? Work on design encoders.
Evaluation of SVP-BW drifters thanks to deployments near moored buoys DBCP-18 workshop - Martinique October 2002 By Pierre Blouch Presentation :
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
Max do Val Machado Raquel A. F. Mini Antonio A. F. Loureiro DCC/UFMG DCC/PUC Minas DCC/UFMG IEEE ICC 2009 proceedings Advisor : Han-Chieh Chao Student.
Harmonizing Standards and Enhancing Technical Capacity in Measurement and Verification of Energy Savings of Projects or Organizations (Concept Note submitted.
Lab 05: System Analysis 1 (Wind Tunnel Testing) Advanced Energy Vehicle.
LOW POWER SENSOR NODE DESIGN When A Node Is Joining ZigBee Network Yoon Mo Yeon RTLab. KNU.
Surface Velocity Profiler (SVP)
Lean Manufacturing Series
The Manufacturing Council of IFMA Presents:
Pull Manufacturing and Just In Time
IAQ Symposium – 2nd IAQ World Quality Forum Kaizen System Implementation Balázs Németh, PhD
Planning Actual execution of maintenance & upgrade
(B.P :51) ( B:P52 ).
Peer Review Agenda (Suggested).
ניהול איכות בדיקות קבלה של התוכנה
Lean Hospitals: Improving Quality, Patient Safety, and Employee Engagement Ch. 4 Observing the Process and Value Streams Presented by Dr. Joan Burtner.
Argos Performance of WOCE Drifters at Half and Full Transmission Power
Drifters’ drogues: on or off?
P09712 Commercial Roll Line Shrink Reduction
The Impact of Lean manufacturing on WIL to the productivity of Industry Introduction Methodology Results Conclusions.
Forensic Engineering A Quick Overview.
REGENERATIVE BRAKING IN MASS TRANSIT By Ch. Sai Ram, Assoc.Professor,
ADS 2028 Phase 1 V2.2 NW Transmission Wheeling Rates
Glass’s Pocket Evaluator
Argos Performance of WOCE Drifters at Half and Full Transmission Power
Detailed Design Review: P18001
Presentation transcript:

DBCP Technical Workshop 2004 Data Acquisition and Telemetry Systems 1 METOCEAN Data Systems SVP B Model Improvements By Bernie Petolas, P. Eng. METOCEAN Data Systems Ltd. Dartmouth NS B3B 1R9 Canada

DBCP Technical Workshop 2004 Data Acquisition and Telemetry Systems 2 Agenda Engineering, Manufacturing and Quality Upgrades to SVP B: –Mechanical Improvements –Electrical Improvements PTT, Sensor and Battery Improvements –Testing and Verification Quality Assurance/Lean Manufacturing Conclusions SVP B

DBCP Technical Workshop 2004 Data Acquisition and Telemetry Systems 3 Mechanical Improvements New Hull Magnet Location Mini Drogue Tether and Attachments Drag Ratio Testing and Verification SVP B

DBCP Technical Workshop 2004 Data Acquisition and Telemetry Systems 4 Electrical Improvements Updated PTT New BP Sensor New software Batteries Testing and Verification SVP BP

DBCP Technical Workshop 2004 Data Acquisition and Telemetry Systems 5 Power Budget SVP BP ITEMWOCE BSVP B Argos Transmission (mAH) Barometer (mAH) Standby (mAH)0.35 Total Battery capacity (Amp Hr) Total (Months)

DBCP Technical Workshop 2004 Data Acquisition and Telemetry Systems 6 In situ Testing and Verification SVP B

DBCP Technical Workshop 2004 Data Acquisition and Telemetry Systems 7 SVP/B vs. SVP/BW SVP B

DBCP Technical Workshop 2004 Data Acquisition and Telemetry Systems 8 ISO SVP B Introduction to ISO Quality Management Feedback loop (NCRs, SCARs and ECPs)

DBCP Technical Workshop 2004 Data Acquisition and Telemetry Systems 9 Lean Manufacturing Introduction to Lean Manufacturing Value Stream Mapping Mistake Proofing 5 S Process 6 σ Total Management Philosophy Continuous Improvement (Kaizen) SVP B

DBCP Technical Workshop 2004 Data Acquisition and Telemetry Systems 10 Continuous Improvement SVP B

DBCP Technical Workshop 2004 Data Acquisition and Telemetry Systems 11 SVP B Continuous Improvement

DBCP Technical Workshop 2004 Data Acquisition and Telemetry Systems 12 Conclusions SVP B Longer Operating Life of Product Reduce Commercial Price No reduction in reliability Lean Manufacturing in conjunction with ISO pays for itself quickly