PBN Airspace Concept Workshop ReviewReview. Review of Workshop 2 ✈ 10 day PBN Airspace Design Workshop ✈ ICAO Doc 9992: PBN in Airspace Design ✈ Plan,

Slides:



Advertisements
Similar presentations
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
Advertisements

Introduction to Navigation Specifications
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Presented by United Arab Emirates MID ATM ENHANCEMENT PROGRAM (MAEP) TECHNICAL PROPOSAL.
Erwin Lassooij PBN Programme Manager 30 January 2014
Overview of the PBN Airspace Implementation Processes
AIRSPACE CONCEPT WORKSHOP CASE STUDY 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
PBN ICAO HQ Activities Overview
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
Procedure Design Considerations
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session Erwin Lassooij ICAO PBN Programme Manager.
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
Performance based navigation: The ICAO PBN programme
GAGAN USER GROUP INTERACTION PROGRAM WITH HELICOPTER OPERATORS 10 th July 2014 Airports Authority of India New Delhi Airports Authority of India- FPD section1.
Continuous Climb Operations (CCO) Saulo Da Silva
The Way Forward for ICAO Nancy Graham Director, Air Navigation Bureau, ICAO Gdansk International Air & Space Law Conference – Poland in International Civil.
PBN Plan Development Aviation Industry Forum 18 November 2009.
Practice Class Exercise CHINA Enroute 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
Good Design Practices BEIJING, CHINA; 30 JUN-11 JUL 2014.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
PBN Airspace Concept Process
International Civil Aviation Organization Collaborative Decision Making (CDM) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA 8 MAY 2002 PROCEDURES FOR AIR NAVIGATION SERVICES- OPERATIONS (PANS OPS ICAO DOC. 8168) Barry Billmann Federal.
AIRSPACE CONCEPT WORKSHOP CASE STUDY 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
ATM Implementation Support by ICAO APAC RSO
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Introduction to PBN Seminar ICAO PBN Implementation 1.
Study Continuous Climb Operations
PBN Airspace Concept Workshop ReviewReview INTERNET: pin:
Chapter 6 Section A. STAR Standard Terminal Arrival Route –Depart the enroute structure –Navigate to destination –Terminate with an instrument approach.
1 Presented by Erwin Lassooij (ICAO, Montreal) Presented by Erwin Lassooij (ICAO, Montreal) From RNP divergence to Performance Based Navigation Convergence.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
1 PBN Performance Based Navigation - Concept & Change - Presented by: Lex Hendriks, EUROCONTROL ICAO Performance Symposium March 2007 Federal Aviation.
From RNP Divergence to Performance Based Navigation Convergence
Worldwide Symposium on Performance of the Air Navigation System, Montreal, March Performance Based Navigation The Future Erwin Lassooij Manager.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
Overview of the PBN Airspace Implementation Processes
Workshop on preparations for ANConf/12 − ASBU methodology
Performance Based Navigation The Future
Допълнение 7 на PANS-ATM (ICAO Doc 4444)
PlaneWrong AGM Thursday 13th October
Overview of Continental En-route Navigation Specifications
Erwin Lassooij PBN Programme Manager 30 January 2014
AIRSPACE CONCEPT WORKSHOP CASE STUDY
The Norwegian PBN Implementation Plan Arne Lindberg Inspector ANS
OPERATIONS ON PARALLEL OR NEAR-PARALLEL RUNWAYS
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
2018/6/11 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
PBN Performance Based Navigation
Continuous Climb Operations (CCO) Saulo Da Silva
Performance Based Navigation: Navigation Specifications
Workshop on preparations for ANConf/12 − ASBU methodology
PBN Airspace Concept Workshop
Continuous Climb Operations (CCO) Saulo Da Silva
Erwin Lassooij/Joel Morin 30 June 2014
ASEAN PBN Routes Objectives:
PBN and the benefits for GA
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
Good Design Practices Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
AIRSPACE CONCEPT WORKSHOP CASE STUDY
Continuous Climb Operations ( CCO )
PBN ICAO HQ Activities Overview
Presentation transcript:

PBN Airspace Concept Workshop ReviewReview

Review of Workshop 2 ✈ 10 day PBN Airspace Design Workshop ✈ ICAO Doc 9992: PBN in Airspace Design ✈ Plan, Design, Validate, Implement ✈ 17 steps ✈ Integration of ICAO Doc 9931 & 9993: CDO and CCO ✈ ICAO Circ 330: Civil / Military Cooperation in ATM ✈ Designed routes and TMA airspace “Centerville” ✈ TMA design for Xian ✈ Enroute design and multi-TMA integration practice ✈ China ✈ 10 day PBN Airspace Design Workshop ✈ ICAO Doc 9992: PBN in Airspace Design ✈ Plan, Design, Validate, Implement ✈ 17 steps ✈ Integration of ICAO Doc 9931 & 9993: CDO and CCO ✈ ICAO Circ 330: Civil / Military Cooperation in ATM ✈ Designed routes and TMA airspace “Centerville” ✈ TMA design for Xian ✈ Enroute design and multi-TMA integration practice ✈ China

3 ICAO Doc Online Course:

PBN CHANGES – STATE LETTER 4 ICAO State Letter SP 65/4-13/24 SUBJECT: Proposal for the amendment of PANS-OPS, Volumes I and II regarding procedure design criteria and charting requirements to support performance-based navigation (PBN) as well as helicopter point-in-space (PinS) approach and departure operations with consequential amendments to Annexes 4; 6, Parts I, II and III; 14, Volume II; 15 and the PANS-ABC

Slide 5 PBN Route Using Waypoints Waypoints

Path Terminators 6 Terminator Path C A D F I M R Altitude Distance DME distance Next leg Manual termination Radial termination Fix F Constant DME arc Course to Direct Track Course from a fix to Holding pattern Initial Constant radius Track between Heading to C D H R A I V T

Questions Asked 7 REF: PANS OPS 8168, VOL2, SECTION III, Appendix to Chapter 5 PATH TERMINATOR CODING RULES

Questions Asked 8 REF: PANS OPS 8168, VOL2, SECTION III, Appendix to Chapter 5 PATH TERMINATOR CODING RULES

PBN Implementation Processes 9

Activity 1 ✈ Safety ✈ Capacity ✈ Efficiency ✈ Environment ✈ Accessibility ✈ Safety ✈ Capacity ✈ Efficiency ✈ Environment ✈ Accessibility Operational Requirements in terms of:

Discussion Points ✈ Who benefits – keep current or change to new ✈ Lowest common denominator? ✈ Build it and they will come ✈ Mixed mode is a common occurrence today ✈ Ongoing and refresher training ✈ Future improvements ✈ Route spacing ✈ Curved simultaneous approaches to multiple rwys ✈ Structure of design process – iterations and final look ✈ Who benefits – keep current or change to new ✈ Lowest common denominator? ✈ Build it and they will come ✈ Mixed mode is a common occurrence today ✈ Ongoing and refresher training ✈ Future improvements ✈ Route spacing ✈ Curved simultaneous approaches to multiple rwys ✈ Structure of design process – iterations and final look 11

Contact Information ✈ Instructors: Instructors: ✈ ✈ ✈ ✈

Good Practice ✈ What can you do? ✈ Separate climb / descent routes ✈ Use direct route paths as much as possible ✈ Design routes first and then airspace ✈ Balance workload ✈ RNAV 1 or RNP 1 ✈ Simplify

FINIFINI