PEO Ships-M 1 Col Gary Warner Marine Corps Advisor, PEO Ships PEO Ships Brief to NDIA 26 January 2005.

Slides:



Advertisements
Similar presentations
9th EXPEDITIONARY WARFARE CONFERENCE
Advertisements

Ms. Nancy Dolan CNO N Human Systems Integration in DoD Acquisition.
August 6, AM General Actions to Ensure Future Restructured business: –Renegotiated labor agreement –Renegotiated supply base pricing, focus on small.
Dean Cox Naval Undersea Warfare Center, Keyport Capability maturity model integration CMMI FOR Washington state university 16 September 2009.
UAV Helicopter Project 12-May-08 Presented by Mark Diel Whirled Air Incorporated Stanford University.
SHIPBOARD INCENTIVIZED ENERGY CONSERVATION (iENCON) EXECUTIVES BRIEF ATLANTIC 10 September 2014 NAVAL SEA SYSTEMS COMMAND (SEA 05Z) Hasan Pehlivan.
DoD Acquisition Domain (Sourcing) (DADS) Analysis of Alternatives (AoA) E-Business/SPS Joint Users’ Conference November 15-19, 2004 Houston, TX.
UNCLASSIFIED Joint and Coalition Warfighting Mr. John Vinett March 2012 Technical Baseline Capability.
MPF(F) R&D MPF(F) Cargo Operations R&D Joint Seabased Theatre Access Workshop February Duck, NC Authors: Martin Fink, Arthur Rausch,
N42 NRB CLF Brief 5/7/01 1 UNCLASSIFIED Joint High Speed Vessel (JHSV) Program Overview SNAME SD-5 & IHS 28 September 2006.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
Your Financial Work Defense Finance and Accounting Service DFAS Transformation Update March 2003.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
Navy Warfare Development Command
Initiate Technology Development Finalize AoA Plan, AS, ICD, TDS, Develop CDD, and TEMP Initiate Milestone B Program Review Planning Process Initiate Acquisition.
1 USS CORONADO (LCS-4) CDR John Kochendorfer Commanding Officer Blue Crew.
Performance Based Logistics 20 Nov Current Life Cycle Challenges High Weapon System Sustainment Cost Inefficient End-to-End Supply.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
1 TRANSFORMING NAVAL POWER PROJECTION. 2 Developing Joint Seabasing Capabilities National Security Strategy National Security Strategy JointOperationalConcept.
2003 USSOCOM SOF CBRN CONFERENCE DECONTAMINATION UPDATE
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
Commander Mine Warfare Command May 6, 2003 ISSUES.
1 Department of Defense Logistics Workforce Human Capital Strategic Planning 2015 FIPT 28 April 2006 Project Status Report.
System Integration Exit Criteria Issues Resolved or Addressed Preliminary Design Review/Critical Design Review, Audits Initiate Design Readiness Review.
CAPT RUSTY STILES Deputy Fleet Surgeon U.S. Fleet Forces Command
SHIPBOARD INCENTIVIZED ENERGY CONSERVATION (iENCON) EXECUTIVE BRIEF PACIFIC September 2014 NAVAL SEA SYSTEMS COMMAND (SEA 05Z) Hasan Pehlivan.
UNCLASSIFIED 13 Jan January 2004 LtCol Larry Ryder, USMC MCCDC USMC High Speed Vessel Project Overview.
Defense Science Board Task Force on Sea Basing. Summary of Conclusions Sea basing - a critical future national competence for assuring access to areas.
Baseline The baseline at July Previously there was a lack of consistency for: Pathways into specialist clinics; Policies, procedures and guidelines.
Page 1 Enterprise Data Warehouse Project Executive: Barbara Chmielewski Project Manager: Anita Sharma.
PRODUCTION/ DEPLOYMENT
Individual and Staff Joint Training Working Group
Jan 2016 Solar Lunar Data.
Joint High Speed Vessel (JHSV) Program Overview
ICD Review Exercise: “Time to be a Requirements Manager AO” (at least for a short time…) LPD-49, LPD-17, Notional LX(R) April 24, 2017.

Today 8 days 24 days 34 days 23 days 35 days 31 days May Jun
Seabasing…Enabling Operational Maneuver from the Sea
United States Army Chief of Transportation
Average Monthly Temperature and Rainfall
<Location> – <Project Name>, Sponsor: <name>



NIAPS v2.4 Installation Plan by Hull in 2012 (Based on Ship’s Availabilities Scheduled in NDE and Coordination with TYCOM for Pier Side WOOs) As of 9 Mar.
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE

Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16



Electricity Cost and Use – FY 2016 and FY 2017
Center for Vision (CVN) on Block 33 Move Planning & Logistics Timeline
DSC ChMC CSS Consequential Update 13th March 2019
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Minor Release Drop 3 Timeline
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
NIAPS v2.4 Installation Plan by Hull in 2012 (Based on Ship’s Availabilities Scheduled in NDE and Coordination with TYCOM for Pier Side WOOs) As of 9 Mar.
Presentation transcript:

PEO Ships-M 1 Col Gary Warner Marine Corps Advisor, PEO Ships PEO Ships Brief to NDIA 26 January 2005

PEO Ships-M 2 PEO Ships Mission and Vision Mission PEO Ships acquires and supports the current and future Surface Fleet: We translate warfighter requirements into combat capability, producing and supporting ships, boats, and craft from cradle to grave, enabling our nation and its allies to project presence in peace, power in war, and assure access anytime Vision PEO Ships is a focused Navy team, providing the world’s best ship innovation, acquisition, lifecycle support, and disposal leadership

PEO Ships-M 3 MPF(F) We Are Ships From Cradle To Grave Concept Refinement Technology Development System Development & Demonstration Production & Deployment Operations & Support JHSV LCS LPD 17 T-AKE LHD 8 CG 47 DDG 51 JHSS LCAC(X) FFG 7 LCAC DD 963 DD(X) LHA 6

PEO Ships-M 4 Concept Refinement and Technology Development LCAC(X) ICD development initiated Jun 05 Functional Area Analysis (FAA) draft completed Aug 05 Functional Needs Analysis (FNA) draft completed Sep 05 Concept Refinement Technology Development System Development & Demonstration Production & Deployment Operations & Support JHSS Initial Capabilities Document in draft Analysis of Alternatives to commence in FY07 Preliminary Design/ Contract Design scheduled for FY08-FY11 Detail Design and Construction beginning in FY12

PEO Ships-M 5 Concept Refinement and Technology Development Concept Refinement Technology Development System Development & Demonstration Production & Deployment Operations & Support JHSV MOA signed by Army and Navy merging HSC and TSV into JHSV under Navy Program Office (Jan 05) ADM designating Navy lead Apr 05 Focused AoA commenced Apr 05 ICD validated 1 Nov 05

PEO Ships-M 6 HSV Designs Assessed Known Military Designs Hybrid Designs LM-LCSGD-LCS INCAT 112 MDV-300 Austal 126 TSL - 140Austal 105 Mono-HullSemi-SwathTrimaranWave PiercingSurface Effect Known Commercial Designs

PEO Ships-M 7 Concept Refinement and Technology Development Concept Refinement Technology Development System Development & Demonstration Production & Deployment Operations & Support MPF(F) MNS signed, May 2001 Milestone A DAB approval, Dec 2002 AoA completed, Apr 2004 RDT&E Risk Reduction activities Senior DoN review MPF(F) “hybrid squadron” finalized

PEO Ships-M 8 Squadron is 14 ships 6 hulls: 2 hot production lines, 1 new design Full MEB (1 vertical battalion and 2 surface battalions) are selectively offloadable –Personnel for second surface battalion are on Sea Base 11 of 14 ships built to commercial survivability standards (minor enhancements), 3 ships to military survivability standards MLP required for surface interface Meets delivery timeline for vertical and surface battalions Significant Industrial Base stability T-AKE 3 Lightship Displacement: 25,700 MT Landing Spots: 2/ship Personnel: 194/ship Ship Speed 20 kts 1 LHD Lightship Displacement: 28,540 MT Landing Spots: 9/ship Personnel: 3000/ship Ship Speed: 22 kts Lightship Displacement: 36,289 MT Landing Spots: 2/ship Personnel: 345/ship (+500 surge) Ship Speed 24 kts LMSR 3 2 LHA(R) Lightship Displacement: 30,862 MT Landing Spots: 9/ship Personnel: 3000/ship Ship Speed: 22 kts MLP(w/Troops) Light Ship Displacement: 28,423 MT Landing Spots: VERTREP Personnel: 1300/ship Ship Speed 20 kts 3 MPF(F) Squadron 2 Legacy Dense Pack Lightship Displacement: 19,900 MT Landing Spots: 1/ship Personnel: 62/ship Ship Speed 18 kts

PEO Ships-M 9 Landing Platform Technologies MPF(F) Technology Development Efforts

PEO Ships-M 10 Landing Platform Technologies MPF(F) Technology Development Efforts

PEO Ships-M 11 MPF(F) Technology Development Efforts Skin to Skin

PEO Ships-M 12 Provide ISO container and vehicle transfer between ships Facilitate personnel transfer Accomplish series of at-sea demonstrations to validate systems and prove operational procedures Develop crane load motion control system Skin-to-Skin Mooring and Cargo Transfer

PEO Ships-M 13 Advanced Cargo Handling MPF(F) Technology Development Efforts Vehicle Maneuvering Testing

PEO Ships-M 14 LHA 6 Replace LHA Class Amphibious Assault Ship Milestone A completed Jul 2001 Program redirected by DoN leadership Capabilities Letter, Apr 2004 Restructured to “aviation variant” Procurement funding for lead ship, FY07 (PB06) Received Milestone B approval 11 January 2006 System Development and Demonstration Concept Refinement Technology Development Production & Deployment Operations & Support System Development & Demonstration

PEO Ships-M 15 System Development and Demonstration Concept Refinement Technology Development Production & Deployment Operations & Support System Development & Demonstration LCS Achieved MS A decision and program initiation, May 2004 Detail Design & Construction contracted to Lockheed Martin & General Dynamics First Ship designated Freedom (LCS 1); keel laid 2 June nd ship (GD) keel laid 19 January 2006 DD(X) DD(X) ORD approval, Jan 2004 System-level PDR completed, Mar 04 Ten Engineering Development Models completed CDR Completed ship CDR, Sep 2005 Received MS B approval, Nov 2005

PEO Ships-M 16 LHD 8 Contract awarded, 2001 Construction started, May 2003 Keel laid Feb 2004 Aux electrical drive for low speed fuel efficiency Electrical auxiliary drive will be used in LHA 6 LHD 8 delivery scheduled, Feb 2008 Production and Deployment Concept Refinement Technology Development System Development & Demonstration Operations & Support Production & Deployment

PEO Ships-M 17 T-AKE NASSCO awarded contract for Detail Design & Construction Contract, Oct 2001 Lead ship construction started, Sept ships under construction Concept Refinement Technology Development System Development & Demonstration Operations & Support Production & Deployment Production and Deployment

PEO Ships-M 18 Concept Refinement Technology Development System Development & Demonstration Operations & Support Production & Deployment LPD 17 Ship christening 2003 LPD 17 at-sea builder’s trials completed, Apr – May 2005 Acceptance Trials completed, Jun – Jul 2005 Ship delivered, Jul 2005 Crew moved aboard, Aug 2005 Commissioned, 14 Jan 2006 Construction underway for LPD 18, 19, 20, 21 Production and Deployment

PEO Ships-M 19 Ships Operations, Support and Disposal DD 963 Decommissioning completed in 2005 FFG 7 30 will remain in service Upgrades include new SSDGs, reverse osmosis plants, COTS slewing arm davits, Mk 53 Nulka and Mk 15 CIWS Blk 1B Removes Mk 13 launchers CG CGs to receive capability upgrades Five Baseline 1 cruisers decommissioned Phase 1 CG Mod starting in FY 06 with HM&E and Combat System stand alone packages Phase 2 CG Mod Integrated Combat Systems full-up package starting in FY 08 CG 52 Concept Refinement Technology Development System Development & Demonstration Production & Deployment Operations & Support DDG Ships awarded and appropriated; 48 delivered 9 remaining ships to be constructed at BIW 5 remaining ships to be constructed at NGSS Final 18 ships are awarded under the FY98-FY01 MYP or FY02-FY05 MYP LCAC 73 craft to receive SLEP 8 craft completed SLEP

PEO Ships-M 20 In conclusion 2005 was a busy year at PEO Ships 2006 looks to be the same MPF(F) R&D is work in progress Industry day for HSV is coming No small boat requirements yet LHA-3 is gone, LHA-6 is coming, LHA-7 is an unknown

PEO Ships-M 21 Questions