The Pennsylvania State University Department of Architectural Engineering Harrisburg University Academic Center Laurel Heather Warner Construction Management.

Slides:



Advertisements
Similar presentations
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Advertisements

Pennsylvania State Employees Credit Union Corporate Headquarters Senior Thesis Presentation | lighting / electrical | Sarah Wujcik | | Dr Houser.
MICA GATEWAY RESIDENCE BALTIMORE, MARYLAND SCOTT MOLONGOSKI SENIOR THESIS STRUCTURAL OPTION ADVISOR: PROFESSOR SUSTERSIC.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
OVERLOOK TOWERS AT DULLES CORNER HERNDON, VIRGINIA Anthony Perrotta AE Senior Thesis – Structural Option.
R.D. and Euzelle P. Smith Middle School Architect’s Statement Site Shading Environmental Systems Learning Technology Architecture Design Constraints High.
Houston Independent School District John F. Kennedy Elementary School PROJECT PROFILE PROJECT HIGHLIGHTS The John F. Kennedy Elementary School is a replacement.
2001 Winter Presentation. Site Location Site View.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA.
UNC Imaging Research Building UNC Imaging Research Building Chapel Hill, NC Daniel R. Hesington, LEED AP l Structural Option AE Senior Thesis l Spring.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
First Baptist Church of Doylestown Senior Thesis Structural Emphasis James Chester Preliminary Phase II Design.
TYPICAL member spot checks & alternate systems design study
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
H OTEL | N ORTHEAST U.S. J ORDAN R UTHERFORD | S TRUCTURAL O PTION F ACULTY A DVISOR | D R. T HOMAS B OOTHBY AE S ENIOR T HESIS | A PRIL 8, 2013.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
1.  S.T.E.P.S.: Science, Technology, Environment, and Policy Building  Education, laboratory, and research  Owner: Lehigh University  Location: Bethlehem,
Architectural Engineering Construction Management Senior Thesis April 11 th, 2011 Consultant: Dr. Riley Architectural Engineering Spring 2011 – Senior.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Robert M. Arnold Building Fred Hutchinson Cancer Research Center
Mountain Hotel Urban Virginia Senior Thesis 2013 Faculty Advisor: Professor Kevin Parfitt Benjamin Borden Structural Option.
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Government Office Center Mid-Atlantic U.S. Penn State AE Senior Thesis Project Alexander Ward | Construction Management James Faust | CM Advisor.
Senior Thesis 2006 The Pennsylvania State University
Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.
Project Introduction  New high-tech classroom and lab facility  Area : 30,000sq.ft.  Function –To provide a home for innovative courses that take a.
Brad Oliver – Structural Option Advisor – Professor Memari.
Craig Owsiany Architectural Engineering – Construction Management STEM Building Hagerstown Community College Hagerstown, Maryland Science Technology.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
Computer Associates International, Regional Office
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Arts & Humanities Instructional Building Noah J. Ashbaugh Construction Management 2006.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
200 Minuteman Drive New Design for Additional Floors and Vibration Sensitive Equipment Brent Ellmann Structural Option Dr. Linda Hanagan - Consultant.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
Hunter Woron Spring 2012 Structural Professor Parfitt.
J. david maino the pennsylvania state university architectural engineering lighting/electrical.
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Mountain State Blue Cross Blue Shield Headquarters
Pearl Condominiums Philadelphia, PA
Introduction James W. & Frances G. McGlothlin Medical Education Center
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Outline Introduction Structural Redesign Gravity System
Greenwich Academy Upper School
Daniel Suter Unknown Data Center Somewhere, USA
Ryan Johnson - Structural Option
FDA CDRH Laboratory Timothy Mueller Senior Thesis, Spring 2006
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Presentation transcript:

The Pennsylvania State University Department of Architectural Engineering Harrisburg University Academic Center Laurel Heather Warner Construction Management August 12, 2008

Project Overview Industry Research Breadth 1 Breadth 2 Results Harrisburg University of Science and Technology Location: Harrisburg, Pennsylvania Size: 370,000 SF Height: 16 Stories Cost: $73M Site Prior to Demolition Laurel WarnerPenn State AE Senior ThesisConstruction Management

Project Overview Industry Research Breadth 1 Breadth 2 Results Project Team Owner: Harrisburg University of Science and Technology Construction Manager: Reynolds Construction Management Architect & M. P. FP Engineer: Burt, Hill Structural Engineer: Barber & Hoffman Civil/Electrical Engineer: Benatec Associates Electrical Engineer (Lighting): Integrated Engineering Solutions, Inc. Parking Consultant: Timothy Haahs & Associates Construction Dates: January 2007—December 2008 Laurel WarnerPenn State AE Senior ThesisConstruction Management

Project Overvie w Industry Research Breadth 1 Breadth 2 Results Project Overview Academic Facility with: Classrooms Teaching labs Seminar rooms Library Auditorium space Office space Parking facility

Laurel WarnerPenn State AE Senior ThesisConstruction Management Project Overview Industry Research Breadth 1 Breadth 2 Results Foundation: 70 caissons averaging 5 feet in diameter and 24” grade beam Core Structure: precast concrete and structural steel wide-flange beams and girders connecting to W18x480 columns Shell: non load-baring Curtain wall and aluminum window glazing system Roof: EPDM rubber elastomer

Industry Research Laurel WarnerPenn State AE Senior ThesisConstruction Management Project Overview Industry Research Breadth 1 Breadth 2 Results

Laurel WarnerPenn State AE Senior ThesisConstruction Management Industry Research Project Overview Industry Research Breadth 1 Breadth 2 Results

Laurel WarnerPenn State AE Senior ThesisConstruction Management Industry Research Project Overview Industry Research Breadth 1 Breadth 2 Results Building Project Met the Following Criteria: Non-classified LEED Version 2.0 or Later for NC Within 25% of Gross SF of HBGU Office or Higher Education In an Urban Environment

Laurel WarnerPenn State AE Senior ThesisConstruction Management Industry Research Project Overview Industry Research Breadth 1 Breadth 2 Results

Laurel WarnerPenn State AE Senior ThesisConstruction Management Industry Research Project Overview Industry Research Breadth 1 Breadth 2 Results

Laurel WarnerPenn State AE Senior ThesisConstruction Management Industry Research Project Overview Industry Research Breadth 1 Breadth 2 Results

Laurel WarnerPenn State AE Senior ThesisConstruction Management Industry Research Project Overview Industry Research Breadth 1 Breadth 2 Results

Laurel WarnerPenn State AE Senior ThesisConstruction Management Industry Research Project Overview Industry Research Breadth 1 Breadth 2 Results Green Urban Design Model

Laurel WarnerPenn State AE Senior ThesisConstruction Management Breadth 1 Project Overview Industry Research Breadth 1 Breadth 2 Results Daylighting a Typical Interior Space

Laurel WarnerPenn State AE Senior ThesisConstruction Management Breadth 1 Project Overview Industry Research Breadth 1 Breadth 2 Results Daylighting Analysis: LEED EQ 8.1  Solar light for 75% of regularly occupied spaces

Laurel WarnerPenn State AE Senior ThesisConstruction Management Breadth 1 Project Overview Industry Research Breadth 1 Breadth 2 Results

Laurel WarnerPenn State AE Senior ThesisConstruction Management Breadth 1 Project Overview Industry Research Breadth 1 Breadth 2 Results

Laurel WarnerPenn State AE Senior ThesisConstruction Management Breadth 1 Project Overview Industry Research Breadth 1 Breadth 2 Results

Laurel WarnerPenn State AE Senior ThesisConstruction Management Breadth 1 Project Overview Industry Research Breadth 1 Breadth 2 Results Daylighting

Laurel WarnerPenn State AE Senior ThesisConstruction Management Breadth 2 Project Overview Industry Research Breadth 1 Breadth 2 Results Green Roof Implementation: Hydrotech Extensive Assembly Features: Lightweight Low maintenance Reduces storm water runoff Helps to mitigate the urban heat island

Laurel WarnerPenn State AE Senior ThesisConstruction Management Breadth 2 Project Overview Industry Research Breadth 1 Breadth 2 Results Green Roof Placement

Laurel WarnerPenn State AE Senior ThesisConstruction Management Breadth 2 Project Overview Industry Research Breadth 1 Breadth 2 Results

Laurel WarnerPenn State AE Senior ThesisConstruction Management Breadth 2 Project Overview Industry Research Breadth 1 Breadth 2 Results Structural Analysis: Calculated new loading conditions with added green roof Simply supported W24x76 Uniformly distributed load 2-span Tributary width = 13’-4’’ Length of beam = 42’-10’’ Total uniform factored load = 158psf

Laurel WarnerPenn State AE Senior ThesisConstruction Management Breadth 2 Project Overview Industry Research Breadth 1 Breadth 2 Results

Laurel WarnerPenn State AE Senior ThesisConstruction Management Results Project Overview Industry Research Breadth 1 Breadth 2 Results Credits for Which the Harrisburg University Qualifies Under the LEED Rating System

Laurel WarnerPenn State AE Senior ThesisConstruction Management Results Project Overview Industry Research Breadth 1 Breadth 2 Results

Laurel WarnerPenn State AE Senior ThesisConstruction Management Acknowledgements The AE Department Especially Robert Holland Kevin Parfitt David Riley Reynolds Construction Management Patricia Blumenthal Todd Buzard James McKamey John Miller Ike Sholly Walter Tack Harrisburg University of Science and Technology Steven Infanti U. S. Green Building Council John Bernard Matthew Grenshaw My Family and Friends Gina Colalillo Jay and Marcus Espenlaub Ghazoll Motlagh Carolyn Skiba Tyler Smith Charlene, Randolph, Heidi, and Darren Warner

Laurel WarnerPenn State AE Senior ThesisConstruction Management Questions?